INFSO-RI-223782 NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, 18 - 20 February 2009.

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

SC7 WG6 Rome Engineering Ingegneria Informatica S.p.A. INFSO-RI Isabel Matranga ETICS Automated Building,Testing and Quality Assurance.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
IA-DMM Measures and Results for Year 1. Cohort 1 as of 6/23.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
EMI INFSO-RI NA2 – Outreach and Collaborations Emidio Giorgio (INFN Catania) NA2 Leader 1 st EMI Periodic Review Brussels, 22 June 2011.
INFSO-RI NA2 Dissemination, Training and Certification Isabel Matranga (ENG) ETICS 2 Final Review Brussels - 11 May 2010.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
EMI INFSO-RI EMI Quality Assurance Processes (PS ) Alberto Aimar (CERN) CERN IT-GT-SL Section Leader EMI SA2 QA Activity Leader.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
INFSO-RI ENG Exploitation Plan ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
INFSO-RI ETICS from Research to Production 5 th EGEE User ForumIsabel Matranga Engineering Ingegneria Informatica S.p.A.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Related Projects Dieter Kranzlmüller Deputy.
CERN Alberto Di Meglio Brussels, 3 April 2009 Project Achievements and Consortium Management ETICS 2 Periodic Review.
Work Package 2 Coordination with EGEE activities Marco Verlato (INFN-Padova) CYCLOPS Review 26 October 2007 Bruxelles, Belgium.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE 3 rd All-Activity Meeting Introduction and NA1 status Bob Jones – Project Director,
EMI INFSO-RI NA2 – Outreach and collaborations Status Report Emidio Giorgio (INFN Catania) Work Package Leader EMI First EC Review 22 June 2011,
GridTalk PMB 11 June 2008.
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA3 status, news, actions EGEE’07 Gergely.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
EMI is partially funded by the European Commission under Grant Agreement RI SA2 – Quality Assurance Alberto AIMAR (CERN) SA2 Leader EMI Second EC.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE Gergely Sipos
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
INFSOM-RI WP NA2 Dissemination, Training and Certification Isabel Matranga Engineering Ingegneria Informatica S.p.A. ETICS 2 Kick.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
INFSOM-RI WP5: Dissemination, Training, Certification Study and Web Interface Status Report ETICS All-Hands – 21 November 2007.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
INFSOM-RI Project Overview Alberto Di Meglio Project Manager 2.
CERN Alberto Di Meglio Darmstadt, February 2009 Project Status Update ETICS 2 All-Hands Meeting.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Communication tools between Grid Virtual.
INFSO-RI Enabling Grids for E-sciencE Quality Assurance Gabriel Zaquine - JRA2 Activity Manager - CS SI EGEE Final EU Review
INFSO-RI Towards a self sustainable ETICS system Exploitable knowledge and its potential use ETICS2 first AHM Isabel Matranga Engineering Ingegneria.
EMI is partially funded by the European Commission under Grant Agreement RI NA2 : Outreach and Training Emidio Giorgio, INFN NA2 Leader 2 nd EMI.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
European Middleware Initiative (EMI) – Training Kathryn Cassidy, TCD EMI NA2.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project Session 5 – Conclusion session Marie Calmel, ONF International December 11 th, nd Steering.
INFSO-RI NA2 ETICS2 first Review Isabel Matranga Engineering Ingegneria Informatica SpA Bruxelles, 3 April 2009 Dissemination, Training and Certification.
INFSOM-RI ETICS: E-infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio Project Manager.
EMI INFSO-RI SA2: Quality Assurance Status Report Alberto Aimar(SA2) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Application Porting Support Gergely Sipos,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
INFSOM-RI The ETICS Service Configuration, Building and Testing Elisabetta Ronchieri, ETICS Project, INFN CNAF.
EMI INFSO-RI /04/2011What's new in EMI 1: Kebnekaise What’s new in EMI 1 Kathryn Cassidy (TCD)‏ EMI NA2.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-II All Activity Meeting, Sofia
INFSOM-RI Project Status Update Alberto Di Meglio Project Manager.
ETICS, EU-OMII and the Software Repository Andrea Caltroni, INFN Padova ETICS 1 st All-Hands Meeting, Budapest - May 29-31, 2006.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
INFSOM-RI WP3: WP3: Software configuration tools and methodologies Status Report ETICS All-Hands – 23 May 2007 E. Ronchieri.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
AMICI WP1 – Management, coordination and dissemination
Current status and next steps
NA2 Status Update ETICS2 first AHM Isabel Matranga
DataGrid Quality Assurance
E-Infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio CERN, INFN, Engineering, 4D Soft, University of Wisconsin.
ETICS 2 All-Hands Meeting
Dissemination, Training and Certification
Lessons Learned, Future Plans and Conclusions
Infrastructure Support
WP5: Dissemination, studies, web portal and tools
BioMedBridges – Work Packages 2 & 12
AMICI WP1 – Management, coordination and dissemination
CHEMICAL AND PHYSICAL CHARACTERISATION OF MULTIFUNCTIONAL MATERIALS
Presentation transcript:

INFSO-RI NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, February 2009

INFSO-RI Darmstadt, February 2009NA2 Status Update Dissemination Activities performed from M8 to M12 Events and main outcomes QA&Test (45 minutes slot) Collected feedback from experts in QA New kind of audience EU Condor Week (45 minute session ) Discussion on virtualisation techniques Interesting liaisons SC08 (poster at INFN stand) We were there! NorduGrid 2008 (a workshop was dedicated to the Unified Middleware Distribution) Discussion on the use of ETICS as common build and test system and repository for all middleware implementations

INFSO-RI Darmstadt, February 2009NA2 Status Update Dissemination Activities performed from M8 to M12 Events and main outcomes 6th eConcertation meeting exchanged information and results with other e- Infrastructure projects teams ICT 2008 Interesting liaisons EGEE JRA1/SA3 All-Hands meeting presentation of the new features feedback collection EGI meetings (?) Discussion on the use of ETICS as common build and test system and repository for all middleware implementations

INFSO-RI Darmstadt, February 2009NA2 Status Update Dissemination Activities performed from M8 to M12 Events prepared OGF25/EGEE User Forum The ETICS System Job Submission Facilities Validation of standard compliance and interoperability of grid software using the ETICS Test System (a shorter version will be merged into the SW Development Tools workshop) Using the ETICS Test System to analyse standard compliance and interoperability of grid software two 90- minute slots Workshop for CBT Postponed to the 10th March

INFSO-RI Darmstadt, February 2009NA2 Status Update Dissemination Activities performed from M8 to M12 Poster

INFSO-RI Darmstadt, February 2009NA2 Status Update Dissemination Activities performed from M8 to M12 News Zero-in Magazine Prepared a news for iSGWT waiting for comments from PMB. It will be send to iSGWT on the 20 th Feb

INFSO-RI Darmstadt, February 2009NA2 Status Update Dissemination Activities performed from M8 to M12 ETICS Website Keeping it updated Software Quality page added Download and install page Testimonials page (needs testimonials!) New home page Re-organisation of the content

INFSO-RI Darmstadt, February 2009NA2 Status Update Dissemination Activities performed from M8 to M12 ETICS on the web ETICS in EGI Knowledge base ETICS in EGEE collaborating project page ETICS public documents in Belief DL ETICS on Gasuc (Grid Application Support Centre) supported tools and technologies page (Coming soon)

INFSO-RI Darmstadt, February 2009NA2 Status Update Dissemination Milestones and Deliverables from M8 to M12 DNA2.6 (Dissemination and Use of Knowledge Plan – second update) (in progress) MNA2.3 (Dissemination events organized (according to dissemination plan) (OK)

INFSO-RI Darmstadt, February 2009NA2 Status Update Dissemination In the next six months … Keep the website updated Preparation of workshops More effort must be spent on converting interested others into users News and Articles Participation to Conferences DNA2.8 Dissemination and Use of Knowledge Plan – third update)

INFSO-RI Darmstadt, February 2009NA2 Status Update Training Activities from M8 to M12 DNA2.4 (First year analysis of training and tuning activities - M12) (in progress) On-line training courses and demos (Delayed from M06) 1 Day training to ARC people (February) Issue : Training activities delayed because of recruitment issues in other WPs in which activities had higher priority.

INFSO-RI Darmstadt, February 2009NA2 Status Update Training In the next six months … Training session at OGF25/EGEE User Forum (2 nd March) Need to activate a contingecy plan to recover delays and perform future activities

INFSO-RI Darmstadt, February 2009NA2 Status Update A-QCM Activities performed from M8 to M12 From Grid-QCM to A-QCM High level design of A-QCM web interface QA&TEST conference A-QCM contribution for ETICS 2 web site DNA2.3 (ETICS Grid Quality Certification Activity Report) Identification of alforithms for A-QCM metrics implementation Consultation with experts Improvement of the A-QCM model (coding style evaluation module) A-QCM competitor analysis

INFSO-RI Darmstadt, February 2009NA2 Status Update A-QCM In the next six months Trial certification (MNA2.4 two projects are issued with a GridQCM certificate – M12) (Delayed) Dissemination Logo Final version Improvement according to feedback DNA2.7 ( ETICS Grid Quality Certification Activity Report) Workshop with quality experts Preparation for the presentation of A-QCM to ISO

INFSO-RI Darmstadt, February 2009NA2 Status Update Long-term sustainability Activities performed from M8 to M12 Definition of a strategy that will allow the ETICS 2 services to become self sustainable (work in progress) Market analysis of “competitors” (work in progress) DNA2.6 (Long-term sustainability strategy and activity report – M12) (work in progress) An investigation on how ETICS 2, regarded as a System and Service, can be mapped to the ISO/IEC Software Lifecycle Processes

INFSO-RI Darmstadt, February 2009NA2 Status Update Long-term sustainability in the next six months Consolidation of strategy that will allow the ETICS 2 services to become self sustainable

INFSO-RI Darmstadt, February 2009NA2 Status Update Thank you! Any Questions?