Extrusion Modules – The Active Detector Ken Heller University of Minnesota Talks by: Tom Chase – Progress on End Seals and Leak Detection QA Alex Smith.

Slides:



Advertisements
Similar presentations
Liquid Scintillator for a 50 KTon Off-Axis Neutrino Detector
Advertisements

HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
16 August 2006 APD module development at IU 1 APD Module IU B. Adams, F. Busch, P. Childress, W. Fox, S. Mufson, J. Urheim, G. Visser with.
NOvA Module Manifolds & Bottom Plates Tom Chase University of Minnesota February 2006.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
SDP 2010 Team Goeckel Stephan Adams Ghaida Al-Jermozi Jessica Lau Dan Smith UMass CampusView.
NOvA Module End Caps & Manifolds 1.Threading: Time & Motion Studies 2.Attaching Manifolds to Scalloped Extrusions 3.Avoiding 2 Styles of Extrusions Tom.
Leon Mualem — NNN07 The NO A Experiment Status Leon Mualem California Institute of Technology (for the NO A collaboration) Workshop on Next Generation.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
NO A at Caltech Leon Mualem DOE Review July 25, 2007.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
Prototype Mechanical / optical considerations 1.Current LED system performance 2.New APD / Fiber /Strong Back integration scheme.
PVC Extrusion Quality Control WBS 2.4.2,2.4.3 June 5, 2007 Chuck Grozis.
PVC Module Production (2.5) Ken Heller University of Minnesota May 8, 2012 Minerba Betancourt, Jianming Bian, Tom Chase, Dan Cronin-Hennessy, Ben DeYoung,
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
NoVA FNAL Engineering Needs 9 February 2009 Dave Pushka.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
The NO A Module Factory Quality Assurance System Alex Smith University of Minnesota for the NO A Collaboration.
Cost for Large Liquid Scintillator Detector Ken Heller University of Minnesota Active Detector – Liquid Scintillator Target Material - Water Read Out –
Liquid scintillator for an off-axis neutrino detector? (The Minnesota group) We are actively investigating a liquid scintillator option for the off-axis.
NO A Experiment Jarek Nowak University of Minnesota For NOvA Collaboration.
Grouts and Grout tests for NOVA The NOVA extrusions, when filled, will exert an average pressure of 19 psi (2736 psf) on the floor. The pressure is not.
Monitoring of FHEP Teacher Research Internship Fermilab – Summer 2011.
NOvA Project Status April 3, 2007 John Cooper Ron Ray Nancy Grossman.
Sarah Phan-Budd, TIPP Construction of PVC Extrusions for NO A Near and Far Detectors Sarah Phan-Budd Argonne National Lab On Behalf of the NO A.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 The NO A Experiment Gary Feldman Harvard University Survey.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
ATLAS, U.S. ATLAS, and Databases David Malon Argonne National Laboratory DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National Laboratory.
The NO A Experiment Status Leon Mualem California Institute of Technology (for the NO A collaboration) Fermilab Users’ Meeting 2009.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
MINERvA Mini-Review Debbie Harris Jeff Nelson Kevin McFarland Jeff’s slides version 1.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Structure Update Installation & Building Update Revisions Outlined Costs Revisited (since given to Gina) Jeff Nelson Fermilab.
Gary Feldman MINOS in Cambridge 24 March NO A Update MINOS Collaboration Meeting Cambridge, England 24 March 2009 Gary Feldman.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
AVAILABLE Will Build to Suit Could the University of Minnesota do this? –Alternate to Line Item or to a DOE grant? from Marvin Marshak (in the Middle.
Off-Axis Collaboration Meeting Feb 7, 2004 Richard Talaga, Argonne (Liquid) Scintillator Structure Workshop Report Workshop Purpose –To review the current.
1 draft NO A WBS J. Cooper NO A Working Group Meeting June 29,2005 Work is the effort of Ron, Dave, Bill, Suzanne, Harry, not just me.
1 Energy Science Laboratories, Inc. Materials & Processing ESLI Cooled Carbon Support BTeV Pixel Detectors Development Recommendations for 2001 T R Knowles.
Harvard Neutrino Group DoE Review August 21, 2006.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Super-IFR Detector R&D summary Wander Baldini Ferrara, Padova, Roma1 INFN and University on behalf of the superB-IFR group: Ferrara, Padova, Roma1 INFN.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Status of the NO A Experiment Kirk Bays (Caltech) on behalf of the NO A collaboration Lake Louise Winter Institute Saturday, Feb 22, 2014.
NOvA Project John Cooper Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
The design of a photodetector unit of a new Shashlyk EM
Roberto Calabrese Ferrara University and INFN
Jim Fast Pacific Northwest National Laboratory
MINOS Scintillator Douglas Michael California Institute of Technology
NOnA NuMI Off-axis ne Appearance
Frontier Detectors for Frontier Physics
MINOS Detector Scintillator Module Construction Methods
M.Jonker CTC MPO-WG status
Cold Pressure Fusing II Team Fusion
Vishnu V. Zutshi For the NICADD team.
Progress on the development of a low-cost fast-timing microchannel plate photodetector Junqi Xie1, Karen Byrum1, Marcel Demarteau1, Joseph Gregar1, Edward.
Status of the EUDET Prototype
State of developments on Readout interface of European DHCAL
Presentation transcript:

Extrusion Modules – The Active Detector Ken Heller University of Minnesota Talks by: Tom Chase – Progress on End Seals and Leak Detection QA Alex Smith – Module Factory Description Dan Cronin-Hennessy – Module Factory Challenges Argonne, Fermilab, Indiana, Minnesota, + ??

Outline Module Design – A Reminder Level 3 Tasks and Managers Needs and Opportunity

To 1 APD pixel 15.7 m 3.9 cm 6 cm NO A PVC Module (23,808) 6 cm 4 cm 32 cells 1.3 m 15.7 m Tom Chase Hans Jostlein

Module Production End Seals Tom Chase Photodetector Interface Jon Urheim Factory Design Dan Hennessy Jim Grudzinski QA (Dan Hennessy) Integration Prototype Production Ron Poling Shipping and Storage ????? Level 3 Tasks R & D Construction WBS (Costs, Schedules) CDR, TDR

Photodetector Interface Jon Urheim End Seals Tom Chase Factory Design Dan Hennessy Jim Grudzinski Integration Prototype Ron Poling QA (Dan Hennessy) Shipping and Storage ????? End Plates Manifolds Gluing Light Seal Methods Machines Cookies Alignment Fibers Layout Extrusions Fibers Electronics Fiber Continuity Leaks Light tight 3 Factories Near Detector Far Detector Extrusion Modules Modules