March 2010 Target Group Control System of production furnace for SPES project Results and progress status march 2010.

Slides:



Advertisements
Similar presentations
9.How To Upgrade Title Bar Status Bar 9-1.PC System Requirements
Advertisements

Yokogawa Network Solutions Presents:
Ref: iTools.ppt (6/3/2014) 1 EUROTHERM CONTROLS What is iTools? A next generation IPS for Windows –Windows 95, NT 4 Supporting System Integrators, OEMs.
MBE Upgrades What upgrades? – Change cell type to have a more narrow openning – QCM to determine Ti flux and quicker calib. Why (in general) need to do.
JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
SV100 Open-Loop Vector VFD FV100 Closed-Loop Vector VFD 1.
Niobrara R&D Corp Compact PLC Upgrades With the CERI.
Powerfully simple work management Software for an organized, engaged and productive workforce.
Unit Test Calibration Training
Riso Digital Education Center Appendix for SRC Training Basic Course 1.
Autonomous Helicopter: James Lyden Harris Okazaki EE 496 A project to create a system that would allow a remote- controlled helicopter to fly without user.
Engineer Training TN 59 Ink Management Solution TJ8300 / TJ8500 TN 59 Ink Management Solution Machine 75 and Above.
MTS Delivery Development © 2009 IBM Corporation EMEA GLOBAL Total Microcode Support (GTMS)
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Dataloggers. Records voltage, current, or circuit closing Environmental variables must be converted to electronic signal.
Diffusion Furnace Controller Design Team 14 Joe Grady James Crow Hongyu Chen Prakalp Sudhakar Victor Villagomez Client/Faculty Advisor: Dr. Gary Tuttle.
MECHANICS FOR PC SERIAL UPGRADING OF VISTAR (2010PK) IRD DEALER QUALIFICATION: 1.The Dealer’s office can be easily located by the subscribers. 2.Dealer.
Abs.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Importing Foreign Data and Maintaining Associativity.
PSS test conducted twice a year to verify operation of PSS enables and operation ARC1 Fails PSS certification. Will not turn off when PSS signal is disabled.
G4 Control and Management Solution for Data- Centers and Computer Rooms.
© 2013 The McGraw-Hill Companies, Inc. All rights reserved Mike Meyers’ CompTIA A+ ® Guide to 802: Managing and Troubleshooting PCs Fourth Edition (Exam.
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
Hands-On Microsoft Windows Server 2003 Administration Chapter 2 Managing Windows Server 2003 Hardware and Software.
U81X0 Downloading Tool Manual 1 ( Version 1.2 ) FlashRW For U81X0 Version 4.0.0(Build #95V) February 2004 LG Electronics Inc.
December 2009 Target Group Control System of production furnace for SPES project Results and progress status december 2009.
AC031S/32S safety monitor: New functionality SAFETY AT WORK Date: 5/18/2009.
11 SYSTEM PERFORMANCE IN WINDOWS XP Chapter 12. Chapter 12: System Performance in Windows XP2 SYSTEM PERFORMANCE IN WINDOWS XP  Optimize Microsoft Windows.
CHEMS ANNUAL TRAINING Topics For Today CHEMS CHEMSPRO.
Microsoft FrontPage 2003 Illustrated Complete Finalizing a Web Site.
1. Upgrading via the Network Booting Preparing Materials -PC server with a wired LAN port -Upgrade file for the network booting(bin type) Upgrade Procedure.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
RMS Importer Status MACS Week March 2011 PP b-ABR_RMSImporterStatus Angela Brett RMS Importer Status 1.
Test Procedure: ECS (E1/Eth), SAM2, SAM1.5 & Access
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
SMS Module Model : SB-DN-SMS/IP Configuration of SMS Module.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
TECHNICAL TRAINING 2007 CONTROLLER PROGRAM UPGRADE.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Basic Input/Output System
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Tracker meeting – July, 2006 TBS – TPSFE FM/FS tests Lucio Accardo, INFN Perugia.
OD HV Upgrade Hans Berns Jeff Wilkes U. of Washington 10/14/01.
U81X0 Downloading Tool Manual 1 ( Version 2.0) FlashRW For U81X0 Version 4.0.0(Build #100V) April 2004 LG Electronics Inc.
1 | INALA TECHNOLOGIES TEST PROCEDURE: ECS2, SAM2, SAM1.5 & ACCESS VERSION 1.0.
New Product Developments World Leaders in Combustion Management Solutions New Products New Products.
User Interface – Switch Panel 6 Gang Switch Panel Configuration guide RS485 Terminal Fixing hole Bayonet Front ViewBack View.
Source Controller software Ianos Schmidt The University of Iowa.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
Multifunctional LCD Panel HDL-MPL8.48. LCD Panel Description The HDL-MPL8.48 series is a new generation of wall mounted switch, with a total of 8 metal.
Hardware, 010 – Revision notes Scales use Controller board O/Ps for Feed Control (FCE’s) Flow meters use their own on board O/Ps for Feed Control (FCE’s)
ISO 13485:2016 What You Need to Know Robert M. Wolfarth, C.Q.A.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
© 2013 Eaton Corporation. All rights reserved. easy Programmable Relay Training Program Exercise 3.
MICROSOFT WORD 2013 Lesson 9 Proofing Documents Vocabulary.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Advantech IPC-6608BP Desktop/ Wall mount Chassis -1 ISA, 4/ 6 PCI, 1 PCIMG, 1 PCI/ISA slot -Advantech PCA-6194VG Core 2 Duo SBC Board -Intel Core2 Duo.
INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA.
Chapter Objectives In this chapter, you will learn:
4m. Blanco TCS Upgrade: Electronic Status at March/2010
Cisco Implementing Cisco IP Switched Networks (SWITCH )
Drives Training Foils Encoder Module Installation
3.14 Microscan QX-870 Scanner Configuration
3.14 Microscan MS-860 Scanner Configuration
Instructional presentation
CAN branch PSU – Update meeting
Presentation transcript:

March 2010 Target Group Control System of production furnace for SPES project Results and progress status march 2010

March 2010 Target Group Power Supplies Lambda Genesys 3.3kW Upgrade software Prototype.CFP.v.9 to Prototype.CFP.v.10 It has been updated the Prototype_CFP_1_ctrl_valve.v.9 software to release 10 (Prototype_CFP_1_ctrl_valve.v.10). This new release allows to work with or without thermocouple (older release prevents this choice,so the absence of thermocouple causes the program stopping). The choice to disable or to enable thermocouple is done by means of DIP switch N°1 on the front of the cFP (shown in figure). SWITCH1 ON  no therm.  LEDA ON SWITCH1 OFF  with therm.  LEDA OFF

March 2010 Target Group Power Supplies Lambda Genesys 3.3kW Upgrade software Prototype.CFP.v.10 to Prototype.CFP.v.11 It has been updated the Prototype_CFP_1_ctrl_valve.v.10 release to release 11 (Prototype_CFP_1_ctrl_valve.v.11). This new revision replaces the drivers for ESS Power Supply with the drivers for Genesys Power Supply. Figure shows the genesys drivers in the state 1001 of FSM (state for CHECK SYSYTEM COMMUNICATION )

Power Supplies Lambda Genesys 3.3kW March 2010 Target Group As shown during december meeting, in addition to parameter configuration of Power supply, it is necessary to provide the correct settings for the communication channel.

Work in progress I’m developing the revision 12 of the software. This release replaces the Eurotherm serial RS232 drivers with the drivers for new controllers RS485. Future steps - Test and verification of the final software. - Power supply and eurotherm regulators assembling in the furnace and relevant wiring - Last test in site March 2010 Target Group Power Supplies Lambda Genesys 3.3kW