PREVENTATIVE MAINTENANCE

Slides:



Advertisements
Similar presentations
International Alert Users Association Conference November 10-12, 2011 Jeffrey Knoepke Preventive Maintenance System.
Advertisements

Workshop: Preventive Maintenance
Converting an Emergency Work Order to a Simple Work Order University of Western Ontario.
FLEET User Manual July 1, Part One – User Names & Passwords I.User Names & Passwords A. Creating an Account B. Forgot Password C. Updating .
Craig J. Nichols, Secretary. FLEET User Manual May 2013.
| | Tel: | | Computer Training & Personal Development Microsoft Office Project 2003 Intermediate.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
This is where you will print the assessments for your SLA and frequent progress monitoring. This is where you will print the assessments for your SLA and.
Installment & Recurring Billing
Payment History Wizard June 20, Payment History Wizard  Payment history can be entered in ACT 7 for prior years by using the Addback wizard. 
ETravel Authorization / Reimbursement Overview SOLAR Financials x 6685 July 8, 2014.
Project Basics Lesson 1. Skills Matrix SkillsMatrix Skill Start Microsoft Project Standard Create a project planOpen a new project plan Specify a start.
PM Refurbishment Orders for Material Repairs
SAP Preventive Maintenance An Overview
SAP Preventive Maintenance An Overview
The Quote Request Model Joanne Woytek. 2 Conference ‘11 Why Use the Quote Request Tool  Only recommended method for: Determining what is available on.
2. Run. Hours button 1. Run. Hours screen Running hours.
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. ACCESS 2007 M I C R O S O F T ® THE PROFESSIONAL APPROACH S E R I E S Lesson 3 – Finding, Filtering,
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
How to Get The Most Out of Outlook 2003 Michele Schwartzman Division of Customer Support Summer 2006.
Navigation instructions Begin the tutorial Creating the Performance Plan Performance Management System Tutorial for Managers Estimated Time to Complete:
Blueprint Training Presentation: Maintenance Work Orders October 3, 2006.
Web Purchasing Demo Version Web Purchasing Demo WELCOME Presenter.
S9k Preventive Maintenance & Equipment Inventory.
RealProperty PLUS Commercial I Escalations and Passthroughs © 2009 Domin-8 Enterprise Solutions LLC. All rights reserved.
eOrders inventory ordering software! Introduction Use easy functions, letting you order products that you need automatically. Use easy functions, letting.
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
TA. MARAM AL-KHAYYAL NET481 MS Project Overview. Outline Introduction to project management.  Project 2007 can help you manage project time, resources,
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
MANUAL FOR MAINTENANCE. 1.Click Menu maintenance 2.Create new complaint.
Establishing Resources Lesson 2. Skills Matrix SkillsMatrix Skill Establish people resourcesEstablish individual people resources Establish a resource.
Statewide Financial System Program 1 Commitment Control (KK): Refresher Training Key Points Commitment Control (KK): Refresher Training Key Points Welcome.
FITS COGNOS REPORTING MANUAL NEW COGNOS LINK
Microsoft Project Tutorial Jesal Bhuta
Internal and Confidential Cognos CoE COGNOS 8 – Event Studio.
1 Microsoft Project 2003 Introduction. 2 Overview Microsoft Project is a specialized database that stores and presents thousands of pieces of data. Examples.
Microsoft Dynamics ® NAV 2009 Service Management.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
1 Microsoft Project 2003 Starting a New Project. 2 Creating a new project plan To start Microsoft Project, click the Windows Start menu. Point to All.
Microsoft Project Tutorial for CSCI 577 Fall 2006 Jesal Bhuta
New Meter Work order is created by ELopez or MCruz Init Dept: ENG, Route to Dept: CS Status: REQUEST.
Using Workflow With Dataforms Tim Borntreger, Director of Client Services.
How to assign a task Project Name:How to assign a task Description:This tutorial contains step-by-step instructions on how to assign a task such as homework.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Due to the competitive nature of this document, the information contained within is considered to be of a proprietary and confidential nature and shall.
Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS.
Travel Reimbursement -step by step- When is Travel Reimbursement (TR) required? All travel that requires reimbursement or travel advance issued on TA.
Microsoft Project 2003 By: Mahmoud Saad El-Din. Topics  Creating a new project.  Working with workspace project.  Defining project information.  Working.
 Tata consultancy services Production Planning WORK CENTERS.
Template v4 September 27, Copyright © Infor. All Rights Reserved. 1 Infor Factory Track TM 6.00 Payroll Process in Time Track.
Overview Rental Quote Overview
Travel Reimbursement -step by step-
Preventive Maintenance Agreements
Standard Operating Procedure
Standard Operating Procedure
Work Order System Infor 10 (EAM) JCIM
Welcome to the LMS Quick Manager Guide.
Enhancement Notification Release 5.4
Welcome to the LMS Quick User Guide.
Work Order System Infor 10 (EAM) JCIM
C/S Windows Overview Nigel Pilsbury.
Working Knowledge Training
Information System Analysis
Two methods to observe tutorial
ISPM Practical.
Working Knowledge Training
ISPM Practical.
Working Knowledge Training
Presentation transcript:

PREVENTATIVE MAINTENANCE

Introduction Plans Maintenance Items Task Lists Operations Preventative Maintenance Plans are used to create reoccurring Work Orders. SAP Preventative Maintenance Plans consist of: Plans Maintenance Items Task Lists Operations Scheduling Parameters

Terminology Strategy - Is the plan weekly, monthly, yearly, or hourly? Start of Cycle - Last time this Work Order was done. Shift Factor - Allows you to move the next scheduled PM based on completion date. Call Horizon - Specifies when an Order should be generated with reference to a calculated due date. This allows for planning. Object List – Actual Functional Location and/or Equipment Stops on a route. Maintenance Items – A template that Work Orders are created from. Task List - Where operations are maintained and the frequency cycles are determined. Operations - Step by Step instructions, Job Duration, and Resources per Work Order. Different frequencies allowed on same Task List.

Five Rules to Create a PM Determine Strategy Due date and frequency Does a plan already exist with this strategy that fits needs? Determine the Shift Factors Based on completion date Based on calendar date Determine the Maintenance Item including Task List Can an existing task list be used? Create a new task list? Determine if there will be an Object List Determine Scheduling Start of Cycle with proper due dates Call Horizon

PLANS Contains strategy (weekly, monthly, yearly, hourly) Contains scheduling parameters (start of cycle, shift factors, call horizon) Can consist of multiple maintenance items

MAINTENANCE ITEMS Each Maintenance Item in a plan creates 1 Work Order. Option to have multiple Items per Plan Work Orders Work Order Description Functional Locations or Equipment (for history and cost) Work Center Planner Activity Type Object List Link to Task List

TASK LIST Consists of: Operations Maintenance Strategy Weekly Monthly Yearly Maintenance Packages A Maintenance Package is a list of frequencies available to a Strategy.

OPERATIONS A Task List can contain one to many operations which: States Work Center Responsible Includes long text step-by-step instructions Estimates duration of job Estimates number of people to do the job Appear cyclically on a work order

SCHEDULING PARAMETERS One Per Plan Start of Cycle - When was the last time the smallest cycle of the Plan executed? Shift Factors - Is the next Work Order from this Plan due based on Completion of previous W.O., or is it calendar based? Call Horizon - What percent of the smallest cycle must pass before creating the next due W.O. Scheduling Period - Number of days in future I can view Plan to see what is coming due. (Blank default will always show next due date.)

Create Task List

Task List - Header After Header information is entered, Press the Operation Overview Button

Task List – Operation Overview Double-click for Long Text Update Maintenance Packages

Task List – Maintenance Pkg.

Task List – Operation Long Text

Create a Plan Strategy must be same as task list strategy

Create A Plan To hide/unhide the Plan Header information Enter the Item Description and the F/L then press Enter. Planning Data will default from F/L. Verify Order Type,Work Center, Planner Group, and Activity Type

Add Objects to a Maint Item Object List Tab

Attach Task List If Task List exists To create new task list

Create another Maint. Item Create additional maintenance items

Return to Plan Header Unhide the Plan Header

Set Scheduling Parameters Scheduling Parameters tab

Save the Plan Save

Schedule the Plan Used for multiple cycle Plans To manually call work orders in Plan Used for one-cycle Plans

PM Overview PLAN- Strategy and Scheduling PLANS MAY HAVE MULTIPLE MAINT ITEMS. THE STRATEGY OF WEEKLY, MONTHLY, OR YEARLY MUST MATCH THE TASK LIST STRATEGY. THE SCHEDULED PLAN IS BASED ON 1 START DATE – DIFFERENT DATES REQUIRE DIFFERENT PLANS. PLAN- Strategy and Scheduling MAINT ITEMS- Work Order template and Object List EACH ITEM CREATES A WORK ORDER. THE OBJECT LIST CONTAINS THE DIFFERENT FUNCTIONAL LOCATIONS WHERE WORK IS TO BE DONE. TASK LIST STEP BY STEP INSTRUCTIONS. MAY BE A LINKED DOCUMENT OR INTERNAL TO SAP. A STRATEGY OF WEEKLY, MONTHLY, OR YEARLY IS ASSIGNED TO TASK LIST AND MUST MATCH THE PLAN STRATEGY. OPERATIONS- Frequencies on Maintenance Pkg. STEPS TO BE EXECUTED FOR THE OBJECTS ON THE MAINT ITEMS. EACH OPERATION CAN HAVE DIFFERENT MAINT PKGS, WORK CENTERS, DURATION OF JOB, NUMBER OF PEOPLE NEEDED, AND LONG TEXT TASKS. STRATEGY DEFINES THE FREQUENCY AT WHICH SPECIFIC OPERATIONS ARE EXECUTED. SCHEDULE THE PLAN DETERMINES THE START OF CYCLE BASED ON THE LAST TIME THE WORK ORDER WAS DONE. ALLOWS NEXT PRODUCED WORK ORDER TO CHANGE BASED UPON COMPLETION. DETERMINES WHEN THE WORK ORDER SHOULD BE GENERATED TO MEET THE DUE DATE.