Tracking Task Force Predrag Buncic Offline Week, 19 March 2014.

Slides:



Advertisements
Similar presentations
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Advertisements

MAUS Update Adam Dobbs, MICE Project Board, 16 th April 2015.
M. Adinolfi - University of Bristol1LHCb software week - 18/06/2009 Offline monitoring Marco Adinolfi University of Bristol.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Emulsion scanning: present status and plans for the coming run Giovanni De Lellis.
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
Status of Particle ID in TRD reconstruction Prashant Shukla Institute of Physics University of Heidelberg Presentation at TRD Software Meet 21 st April,
DATA PRESERVATION IN ALICE FEDERICO CARMINATI. MOTIVATION ALICE is a 150 M CHF investment by a large scientific community The ALICE data is unique and.
Predrag Buncic CERN DPG, DPP & Other News. Step back.
STAR reconstruction overview Spiros Margetis (Kent State University) STAR Collaboration.
ALICE O 2 Plenary | October 1 st, 2014 | Pierre Vande Vyvre O2 Project Status P. Buncic, T. Kollegger, Pierre Vande Vyvre 1.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
David N. Brown Lawrence Berkeley National Lab Representing the BaBar Collaboration The BaBar Mini  BaBar  BaBar’s Data Formats  Design of the Mini 
STAR Ready to move on to 7.7 GeV Bill Christie For The STAR Collaboration April 13, Please N.B. All data plots shown in this presentation are online.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
Analysis infrastructure/framework A collection of questions, observations, suggestions concerning analysis infrastructure and framework Compiled by Marco.
Off-line and Detector Database Kopenhagen TPC meeting A.Sandoval.
Infrastructure for QA and automatic trending F. Bellini, M. Germain ALICE Offline Week, 19 th November 2014.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
Analysis trains – Status & experience from operation Mihaela Gheata.
Cosmic Ray Run III Cosmic Ray AliEn Catalogue LHC08b 1.
Tracking in High Density Environment
CERN – Alice Offline – Thu, 27 Mar 2008 – Marco MEONI - 1 Status of RAW data production (III) ALICE-LCG Task Force weekly.
CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 1 Status of Cosmic Reconstruction Offline weekly meeting.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
05/04/06Predrag Krstonosic - Cambridge True particle flow and performance of recent particle flow algorithms.
SoLID review DAQ recommendations Alexandre Camsonne.
Status of global tracking and plans for Run2 (for TPC related tasks see Marian’s presentation) 1 R.Shahoyan, 19/03/14.
Marian Ivanov TPC ExB and V drift calibration and alignment.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
Computing for Alice at GSI (Proposal) (Marian Ivanov)
Predrag Buncic ALICE Status Report LHCC Referee Meeting CERN
Predrag Buncic CERN Future of the Offline. Data Preparation Group.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 01/12/2015.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
CWG13: Ideas and discussion about the online part of the prototype P. Hristov, 11/04/2014.
5 March 2016 STAR Trackers Review Yuri Fisyak, Production chain timing & CPU usage Y.Fisyak.
ALICE Run 2 Readiness WLCG Collaboration Workshop Okinawa Apr 11, 2015 Maarten Litmaath CERN v1.2 1.
ALICE O 2 | 2015 | Pierre Vande Vyvre O 2 Project Pierre VANDE VYVRE.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
Kalman filter for TPC calibration and alignment Marian Ivanov.
AliRoot survey: Reconstruction P.Hristov 11/06/2013.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
1 ALICE Summary LHCC Computing Manpower Review September 3, 2003.
Predrag Buncic CERN Plans for Run2 and the ALICE upgrade in Run3 ALICE Tier-1/Tier-2 Workshop February 2015.
ALICE Offline Week – 22 Oct Visualization of embedding Matevz Tadel, CERN Adam Kisiel, Ohio State University.
I.BelikovWeekly Offline Meeting, CERN, 14 Sep Common track parameterization for the barrel detectors.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 24/05/2015.
Jan Fiete Grosse-Oetringhaus
Calibration: preparation for pa
New TRD (&TOF) tracking algorithm
TPC status report Marian Ivanov.
Marian Ivanov TPC status report.
gLite->EMI2/UMD2 transition
DPG Activities DPG Session, ALICE Monthly Mini Week
Workshop Computing Models status and perspectives
CPass0/CPass1 on LHC12d/c Updated at 08:45 on 02/08
Production status – christmas processing
fields of possible improvement
v4-18-Release: really the last revision!
TPC reconstruction in the HLT
Jacek Otwinowski (for the DPG QA tools and WP7 groups)
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
TPC status - Offline Q&A
QA tools – introduction and summary of activities
CLAS12 Analysis and First Experiment Organization
Presentation transcript:

Tracking Task Force Predrag Buncic Offline Week, 19 March 2014

Need for Global Tracking Project/Task Force – some structure needs to be in place to put the tracking for Run2 on track – tracking effort for Run 3 maybe a separate project – needs a review of current situation Task force with the mandate to assess the current situation, priorities for the immediate future and the long-term structure of global tracking (global PID) – P. Buncic to consider leading this effort Conclusions of January MB retreat

Discussion with experts – Ruben, Marian, Youri.. Discussion with Physics coordination Discussion with Karel Two presentations and discussion in Offline – Offline Weekly – Computing Board What has been done

6 months

Summary – Recently committed changes address PID issues in 2011 data QA plots show improvement in some variables but it would be better to assess real improvement on physics observables It is already clear that TPC needs to fix MC (discrepancy in the number of clusters as function of multiplicity – For tackling 2010 data (and possibly 2011) additional changes are needed Improve double track resolutions Use TRD clusters in TPC tracks fit in order to improve high pt track resolution by factor of 2 – Requires TPC-TRD alignment – It is possible to speed up the TPC reconstruction by a factor 3-5 This is only 30% of total time spent in reconstruction and reconstruction is 10% of all of ALICE CPU budget 6

What can we do within 6 month? – If we want to be ready for Run2 (and allow for Run1 re- processing) We must do all this with the best people we have in the Collaboration We should involve some fresh manpower in order to enlarge expert base with time – Tracking is only one side of the problem Long QA and manual calibration is an issue that really slows down things – Software quality is another issue needs to be constantly monitored – Priorities for development must be set in coordination with Physics Board followed up We need to know when to stop 7

7 people

Possible Tracking Task Force? – Task Force Coordinator (Peter Hristov) – TPC local tracking and PID (Marian Ivanov + N.N) – TPC/TRD Alignment (Ruben Shahoyan + Iouri Belikov) – Software and calibration QA (Mikolaj Krzewicki ?) – CPU performance improvement group Additional effort (fresh manpower) Continuously working on improving CPU performance Enlarging the expert base – Karel Safarik (wise man) – Offline representative, Physics Board representative 10

We need to exploit the full power of JIRA Support for software development Project management and planning If it is not in JIRA, does not exist