Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN 0-13-140650-7. ©2007 Pearson Education, Inc., Upper Saddle.

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

Chapter 17 Project Management McGraw-Hill/Irwin
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Advanced Project Management - CPH
PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
18-1Project Management Chapter 18 Project Management.
Operations and Supply Chain Management, 8th Edition
Project Management Techniques.
Chapter 16 – Project Management
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
Project Time Management
Project Management © Wiley 2007.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Project Management: A Managerial Approach
© Wiley 2010 Chapter 16 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 6 th Edition Chapter.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Project Management To Accompany.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Chapter 3 Managing the Information Systems Project
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 16 – Project Management
PROJECT MANAGEMENT.
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Project Planning & Scheduling
Project Management and scheduling
Project Scheduling Chapter 14.
PROJECT MANAGEMENT WITH CPM/PERT.
Project Planning and Budgeting
Project Time Management
Chapter 16 – Project Management
Project Time Management
Project Time Management
Project Time Management
Importance of Project Schedules
Project Time Management
Presentation transcript:

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Projects and Project management Sections: 1.Projects 2.Project Management 3.Project Scheduling Techniques 4.Project Crashing 5.Software for Projects Chapter 7

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project A temporary undertaking directed at accomplishing some major output, usually requiring substantial resources and significant time to complete  Examples:  Construction job  Military weapons system  New product design  Development of new medicine  A project is a work system

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Work vs. Operations Work  Operations work  Consists mostly of repetitive activities  Work cell production  Assembly line production  Routine office work  Project work  Activities are nonrepetitive

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Management Planning, scheduling, organizing, monitoring, and controlling the project activities so that the PCTS objectives are achieved to the satisfaction of the customer or sponsor  PCTS objectives:  P - Performance - quality of the output  C - Cost - budget that is established  T - Time - the planned schedule  S - Scope - defining the tasks that will and will not be done during the project

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Hierarchy of Project Levels Program - very large undertaking, consisting of several projects Six levels are shown below but some programs and projects have many more levels

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Life Cycle 1.Concept and feasibility phase - preliminary phase to assess feasibility and relevance 2.Definition phase - problem definition step 3.Planning phase - detailed planning of the project including work breakdown 4.Execution phase - actual work on the project is accomplished  Consumes most of the time and cost 5.Closeout - turning over the outcome or product to the customer or sponsor

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Typical Project Life Cycle

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Team  Management of a project is accomplished through the use of a project team  Team is usually cross-functional  Team members are selected from a variety of departments and fields  Project manager - responsible for the project and the project team  Greater risk than operations manager because operations are concerned with ongoing activities, whereas a project is unique and temporary

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Planning Concerned with the development of a formal document that will be used to direct the execution and control of the project  Principal uses of the project plan:  Document the assumptions and decisions underlying the plan  Facilitate communication among those involved  Document the PCTS objectives

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Activities in Project Planning  Work breakdown structure  Project scheduling

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Work Breakdown Structure (WBS) Defines and organizes the project into increasingly more detailed task descriptions in each descending level of the project hierarchy  Work packages (lowest level of WBS)  Defines relationships among work packages and how they fit together in each level of the project hierarchy  Does not indicate sequence in which work packages will be accomplished  This is done in project scheduling

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Scheduling Concerned with:  Estimating times for work packages  Determining sequence of work packages  Planning the dates to perform the work packages and meeting milestones

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Control Concerned with:  Monitoring progress of the work activities  Comparing the progress with the schedule  Taking corrective action when activities are found to be behind schedule

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Control Techniques  Performance reviews - meetings to assess project status  Variance analysis - compares progress to schedule  Schedule and cost are most common measures  Earned value analysis - plot showing actual cumulative cost to budgeted cumulative cost  Trend analysis - tries to identify activities that are at risk of falling behind schedule

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Plot in Earned Value Analysis

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Scheduling Techniques  Gantt charts  Network diagrams:  Critical Path Method (CPM)  Program Evaluation and Review Technique (PERT)

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Gantt Charts A graphical display of schedule project activities on a time axis  Project activities are listed on a vertical axis  Activity time durations are shown as horizontal bars with starting and ending times

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Gantt Chart: Planned Activities Shows planned activities for a construction project

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Gantt Chart: Progress Shows actual work accomplished at some point during week 7

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Gantt Chart Showing Precedence Arrows can be used to indicate precedence relationships among activities

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. CPM and PERT Network Diagrams Components in CPM and PERT network diagrams: nodes and arrows

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. CPM and PERT Differences  Arrow and node conventions:  Activity-on-node (AON) - used with CPM  Activity-on-arrow (AOA) - originally used with PERT  Time estimates:  CPM uses constant time estimates  PERT uses a probability distribution consisting of the most optimistic, most likely, and most pessimistic time estimates

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Critical Path Method  Objective is to identify the total time duration of the longest sequence of activities in the network (the longest path through the network diagram)  The longest path is called the critical path T cp = where T cp = total project time, T ai = activity time for activity i, and the summation is carried out only along the critical path

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Example: Construction Project Activity Time Preceded byDescription 1 5 days-Clear land, excavate 2 14 days1Pour foundation 3 8 days2Frame house 4 3 days3Roofing work 5 10 days3Electrical and heating work 6 9 days 3Plumbing work 7 11 days3Siding and brickwork 8 22 days 4, 5, 6Finish interior 9 6 days7Landscaping 10 2 days 8, 9Move in

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. CPM Diagram for Example Project

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Network Analysis Procedure - 1  Forward pass through network (start with first node and proceed toward last node)  Determine earliest start times (ES) and earliest finish times (EF) for each node ES i = EF i = ES i + T ai where FP i = longest forward path leading from node 1 to node i, T aj = activity time for node j

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. ES and EF Times for Example Activity Longest path FP i ES i T ai EF i

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Network Analysis Procedure - 2  Backward pass through network (starting with last node and proceeding backward toward first node)  Determine latest finish times (LF) and latest start times (LS) for each node LF i = T cp - LS i = LF i - T ai where BP i = longest backward path leading from the last node to node i, and T aj = activity time for node j

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. LF and LS Times for Example ActivityLongest path BP i LF i T ai LS i

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Network Analysis Procedure - 3  Determine the slack time for each activity  Slack time = the amount of time that the activity can be delayed without delaying the subsequent activities in the project S i = LS i - ES i = LF i - EF i where S i = slack time for activity i

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Slack Times for Example Activity LS i ES i LF i EF i Slack S i

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. CPM Diagram with Slack Displayed Critical path = path with zero slack

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. PERT  PERT deals with the uncertainty in the time estimates using three estimates of time for each activity T ai = where T min = optimistic time, T ml = most likely time, T max = pessimistic time,

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Project Crashing Reasons to complete a project in less time than T cp  The scheduled deadline is sooner than T cp  Incentives for finishing early  Penalties for finishing late  The benefits of the project outcome must be achieved sooner  Indirect costs of resources used on the project must be reduced  The sooner the project is finished, the sooner the resources can be used on the next project

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Normal Distribution of T cp

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Activity Costs  The cost of a given project activity typically increases as the time to accomplish it is reduced  Time and cost factors:  T ai = activity time for activity i  C ai = normal cost of activity i  ET ai = expedited time of activity i  EC ai = expedited cost of activity i

Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. Cost vs. Time for Expedited Activity