© 2008 Prentice Hall2-1 Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Chapter 3 Managing the Information Systems Project
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Chapter 10: Project Schedule Planning
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapter 2.
Modern Systems Analysis and Design Third Edition
Chapter 3 Managing the Information Systems Project
Systems Analysis and Design Kendall & Kendall Sixth Edition
© 2008 by Prentice Hall 1 Chapter 2. © 2008 by Prentice Hall 2 Project – a planned undertaking of related activities to reach an objective that has a.
Chapter 3: The Project Management Process Groups
Organizational Influences and Life Cycle
Jump to first page 30/06/ Chapter 1 System Development Environment.
Introduction to Project Management. What is a Project? “A planned undertaking of related activities to reach an objective that has a beginning and an.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Adaptive Processes Project Management Body of Knowledge
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Seventh Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
INTRODUCTION TO PROJECT MANAGEMENT. WHAT IS A PROJECT? “A planned undertaking of related activities to reach an objective that has a beginning and an.
Lecture 2 Week 2. Review of Lecture 1 What is a Project? - a planned undertaking of related activities to reach an objective that has a beginning and.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Project Management. Lecture 5-2 Introduction This lecture discusses the key components of project management, role of project manager and techniques to.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
Managing the Information System Project Dr. Dania Bilal IS 592 Spring 2005.
The Project Management Life Cycle. What is the Project Management Life Cycle? A project life cycle simply includes the necessary steps, from beginning.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
© 2008 Prentice Hall1-1 Introduction to Project Management Chapter 1 Introduction Information Systems Project Management: A Process and Team Approach,
Project Management Framework and Organization 4/20/05 ECGR 6185 By Chris Lankford
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Chapter 3 Managing the Information Systems Project
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Project Management Environment Chapter 2 PMP Preparation Training.
The collection of phases that are performed in completing a project. Each project phase is marked by completion of one or more deliverables. The conclusion.
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Managing the Information Systems Project Cont’d
Chapter 3 Managing the Information Systems Project
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Managing the Information Systems Project
Business System Development
Project Management Chapter 3.
Fundamentals of Information Systems, Sixth Edition
Systems Analysis and Design in a Changing World, 4th Edition
Principles of Information Systems Eighth Edition
Chapter 3 Managing the Information Systems Project
System analysis and design
Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process and Team Approach, 1e.
Project Management Process Groups
Modern Systems Analysis and Design Third Edition
Chapter 3 Determining Feasibility and Managing Analysis and Design Activities 1.
Chapter 3 Managing the Information Systems Project
Modern Systems Analysis and Design Third Edition
Presentation transcript:

© 2008 Prentice Hall2-1 Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George

© 2008 Prentice Hall2-2 What is the Project Management Life Cycle? A project life cycle simply includes the necessary steps, from beginning to end, needed to complete a project. The end of each phase is referred to as a stage gate, phase exit, or kill point, and usually marks the completion of deliverables. A phase defines work to be done and personnel required Life cycles vary by industry and organization

© 2008 Prentice Hall2-3 Common Life Cycle Characteristics Cost and staffing resemble a bell curve Risk and uncertainly are highest at the beginning Stakeholder influence is highest at the beginning; lowest at the end

© 2008 Prentice Hall2-4 Systems Development Life Cycle ( SDLC) A common methodology for systems development that marks the phases or steps of information systems development SDLC Phases 1.Plan 2.Analyze 3.Design 4.Implement 5.Maintain

© 2008 Prentice Hall2-5 SDLC Phase Activities 1.Systems Planning  The need for a new or enhanced system is identified and the proposed system’s scope is determined 2.Systems Analysis  Systems requirements are determined and an alternative is chosen among a set of alternatives to best meet these requirements within the cost, labor, and technical levels to which the organization is willing to commit 3.Systems Design  Descriptions of the recommended alternative are converted into logical and then physical system specifications

© 2008 Prentice Hall2-6 SDLC Phase Activities (cont.) 4.Systems Implementation  The system specifications are turned into a working system that is tested and then put into use 5.Systems Maintenance  Programmers make the changes that users request and modify the system to reflect changing business conditions

© 2008 Prentice Hall2-7 Software Project Behind Schedule? Mythical Man Month –Adding personnel to an information system behind schedule will NOT speed up the process

© 2008 Prentice Hall2-8 Outsourcing / Offshoring 60% work performed in-house 30% sent offshore 10% outsourced

© 2008 Prentice Hall2-9 Stakeholders Individuals which will benefit, participate, or be impacted by proposed system –Project sponsor –Project manager –Project team members –Customers –Influencers –Project Management Office (PMO)

© 2008 Prentice Hall2-10 Information Systems Influences Stakeholders Organizational structure Organizational culture Social environment Economic conditions Others?

© 2008 Prentice Hall2-11 Organizational Influences Culture –Assumptions, values, norms and tangible signs of organization members and their behaviors Structure –Functional –Projectized –Matrix Project Management Office (PMO)

© 2008 Prentice Hall2-12 Organization Structure Types Functional –A traditional hierarchical organization, sometimes thought of as resembling a pyramid, with top management at the fulcrum, direct workers at the bottom, and middle managers in between Projectized –A type of organization structure where people from different functional backgrounds work with each other throughout the lifetime of the project Matrix –A type of organization structure which typically crosses functional design (on one axis) with some other design characteristic (on the other axis)

© 2008 Prentice Hall2-13 Organization Structure Comparison

© 2008 Prentice Hall2-14 Project Management Office (PMO) An organizational unit created to centralize and coordinate the projects within an organization Function varies among organizations

© 2008 Prentice Hall2-15 Project Management Body of Knowledge (PMBOK) Standards and Regulations –Standard: “document approved by a recognized body, that provides, for common and repeated use, rules, guidelines, or characteristics for products, processes, or services with which compliance is not mandatory”* –Regulation: “document, which lays down product, process, or service characteristics, including the applicable administrative provisions, with which compliance is mandatory”* *ISO 1994

© 2008 Prentice Hall2-16 PMBOK Internationalization –Dispersed project team members –Time zones –Political differences

© 2008 Prentice Hall2-17 PMBOK (cont.) Cultural Differences –Politics –Economics –Ethnic origins –Demographics –Religion

© 2008 Prentice Hall2-18 PMBOK (cont.) Social-Economic-Environmental Sustainability –Lasting positive/negative system’s impact –Accountability by organization

© 2008 Prentice Hall2-19 Project Manager Roles (Desired Traits) Leader Communicator Negotiator Problem solver Influencer Motivator

© 2008 Prentice Hall2-20 Project Management Tools & Techniques Gantt Charts –Duration, beginning and ending of tasks –Overlap of tasks –Slack time Network Diagrams –Sequence of activities –Task dependencies –Slack time

© 2008 Prentice Hall2-21 Gantt Chart

© 2008 Prentice Hall2-22 Network Diagram

© 2008 Prentice Hall2-23 Microsoft Project

© 2008 Prentice Hall2-24 Critical Path The sequence of task activities whose order and durations directly affect the completion date of a project The critical path represents the shortest time in which a project can be completed Forward/backward passes used to determine slack time

© 2008 Prentice Hall2-25 Slack Time Free slack – amount of time a task can be delayed without delaying the early start of subsequent task(s) Total slack – amount of time a task can be delayed without delaying the completion of the project

© 2008 Prentice Hall2-26 Network Diagram

© 2008 Prentice Hall2-27 Network Diagram’s Critical Path

© 2008 Prentice Hall2-28 Program Evaluation Review Technique (PERT) Technique that calculates the expected time of a task Uses optimistic, pessimistic and realistic time estimates ET = (0 + 4r + p)/6

© 2008 Prentice Hall2-29 Microsoft Project Most popular of project management tools us/FX aspxhttp://office.microsoft.com/en- us/FX aspx Required –Project start and/or end date –Project tasks and task relationships –Preferred schedule method

© 2008 Prentice Hall2-30 Setting the Starting Date in Microsoft Project

© 2008 Prentice Hall2-31 Entering Tasks in Microsoft Project

© 2008 Prentice Hall2-32 Gantt Chart in Microsoft Project

© 2008 Prentice Hall2-33 Network Diagram in Microsoft Project

© 2008 Prentice Hall2-34 Project Management Processes Process – “a series of continuous actions that bring about a particular result, end or condition” PMBOK Process Groups –Initiate –Plan –Execute –Monitor and Control –Close

© 2008 Prentice Hall2-35 Links Among Process Groups

© 2008 Prentice Hall2-36 Questions?