Guidelines of Good Practice on customer cost surveys as an input for infrastructure development and its regulation Riccardo Vailati Co-chair CEER/ERGEG.

Slides:



Advertisements
Similar presentations
Autorità per lenergia elettrica e il gas 1 Incentive-based regulation of electricity distribution in Italy FSR Workshop Improving and extending Incentive-based.
Advertisements

Insert strapline Developing quality incentives Cemil Altin Head of European Gas Policy November 2006.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Energy regulation and quality of service Eric Groom FEU, World Bank 4 th Poverty Reduction Strategy Forum Athens, June
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
The work of European energy regulators on generation adequacy FTS-CEER workshop on Regulatory Aspects of Power Capacity Markets 7 February 2012.
XVI European Electricity Regulatory Forum, Florence, June 2009 Tahir Kapetanovic (E-Control) ERGEG Security of Supply: System Adequacy Forecast &
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Transposition of Consumer Rights ERGEG Monitoring Report Christina Veigl-Guthann, ERGEG Task Force Chair.
1 A Review of Potential Gains from Reforms ECRA Workshop 6 November 2006 Dr Brian Wharmby Independent Consultant, former Technical Director of Ofgem
1 The Regulatory Authority for electricity and gas:, The Regulatory Authority for electricity and gas: objectives, tasks, independence, accountability.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
RETHINKING THE ELECTRICITY GRID RETHINKING THE ELECTRICITY GRID 14 May 2012 Presented by: PATRICIA DE SUZZONI ADVISOR TO THE CHAIR OF CRE (French Energy.
Energy Tom Howes DG Energy European Commission Europe's renewable energy strategy.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 CEER Workshop Gas Target Model View of local energy companies Joost Gottmer CEDEC CEER | 3rd December 2010 | Vienna.
Trapec S.A. 1 Bucharest Multi Sector – Public Private Partnership Municipality of Bucharest – February 2006 PPP Recommendation Report – Bucharest District.
Frankfurt (Germany), 6-9 June 2011 Economic assessment of PQ solutions Helge SELJESETH – Norway – RT 2b – Economic assessment of PQ solutions.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Autorità per l’energia elettrica e il gas FAULT STATISTICS IN DISTRIBUTION NETWORK: WHAT REGULATORS NEED? Roberto Malaman Autorità per l’energia elettrica.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
Utility Service Quality Regulation in Pennsylvania A Presentation For The NARUC Consumer Affairs Subcommittee September 27, 2005 By Wayne L. Williams,
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
The European regulatory framework and the role of European Energy Regulators in creating an internal energy market Eric DYEVRE Annual conference of Russian.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Marielle Liikanen, chair RMF TF Camilla Egginton – project leader Citizens’ Energy Forum, London, October 2010 Customer empowerment through retail.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 Draft Pilot FG for Electricity Grid Connection.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
The strategy for improved electricity distribution maintenance 9 June 2008.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
Mr Martin Crouch, ERGEG Electricity Regulatory Forum 2009 Florence, 5 June 2009 Status Review of Sustainable Development in the Energy Sector.
1Meeting, location, date Implementation of EC Good Practice Guidance for Billing ERGEG Status Review Ulrike Zeilinger, Project Leader ERGEG Customer Empowerment.
Autorità per l’energia elettrica e il gas PERFORMANCE INDICATORS FOR DISTRIBUTION SYSTEM OPERATORS Roberto Malaman General Manager Autorità per l’energia.
1 Performance elements in budget and reporting process - Norway 5TH ANNUAL MEETING OF OECD SENIOR BUDGET OFFICIALS NETWORK ON PERFORMANCE&RESULTS – 28.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
The added value of the Wind Energy Roadmap Christian Nath – TPWind Executive Committee.
Autorità per l’energia elettrica e il gas Working Visit of the Federal Tariff Service of the Russian Federation Milan, March ICER VIRTUAL WORKING.
Kathy Corbiere Service Delivery and Performance Commission
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Frankfurt (Germany), 6-9 June 2011 EUROPEAN REGULATORS’ VIEWS ON REGULATING SMART DISTRIBUTION NETWORKS Authors - Gareth Evans (Ofgem), Riccardo Vailati(AEEG),
Energy Community Secretariat 1 25 th Customer Working Group Meeting ECS, Vienna 10 October 2013 CIRED C ONFERENCE 2013 R OUND T ABLE R EPORT Jasmina Trhulj.
HIGH SPEED RAIL ASSESSMENT NORGE
Smart grid project - interim report - Interim report for the 6th Steering Group Meeting of the Priority Area 2 Budapest,13 June 2013 The project is supported.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Integrated policy frameworks
Quality Framework Proposal
The 3rd package for the internal energy market
Agenda Context Motivation Scope Main expected results.
EER Work Programme 2011 – electricity
Transmission Planning in a Modern Market Environment
Development of a Solar Water Heater NAMA Concept Belize
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
Incentives for electricity infrastructure – ERGEG view
Future ECO timelines The following is still an indicative timeline as we are awaiting decisions from ministers Autumn 2017 – need to decide what we are.
Presentation transcript:

Guidelines of Good Practice on customer cost surveys as an input for infrastructure development and its regulation Riccardo Vailati Co-chair CEER/ERGEG Electricity Quality of Supply task force Autorità per l’energia elettrica e il gas, Italy Florence Forum, Florence, 14 th December 2010

2 Outline Cost estimation studies The CEER Guidelines of Good Practice on estimation of costs due to electricity interruptions and voltage disturbances and the Sintef Energy Research report which supported CEER work Importance of results for (transmission) infrastructure development Use of results of cost-estimation studies for regulatory purposes Conclusions

3Florence Forum, Florence, 14th December Some NRAs and countries estimated cost of interruptions through surveys Few estimated cost of voltage disturbances Info: 3 rd and 4 th benchmarking reports on quality of electricity supply European Energy Regulators and cost estimation studies

4Florence Forum, Florence, 14th December 2010 CEER recommendations (1) The CEER Guidelines of Good Practice on estimation of costs due to electricity interruptions and voltage disturbances - together with the consultancy study of Sintef Energy Research commissioned and published by CEER ( - are intended as a guidance for NRAs and other parties interested in how to design and develop nationwide cost-estimation studieswww.energy-regulators.eu Survey-based approach (questionnaires sent to a large and representative sample) is complementary to a case- based approach (direct interviews for few significant cases with high impact of interruptions or voltage disturbances)

5Florence Forum, Florence, 14th December 2010 CEER recommendations (2) Some key steps (for costs of both quality disturbances): Specification of customer groups (households; commercial services; public services; industry without large customers; large customers and infrastructure) Choice of cost-estimation method (direct worth; direct worth in case studies for large customers and infrastructure; contingent valuation: willingness to pay and to accept; conjoint analysis) Choice of means to conduct the survey (web; telephone; face-to-face interviews) Design of scenarios (occurrence: time of day, day of week, season; duration: 1 s, 1 min, h; warning?)

6Florence Forum, Florence, 14th December 2010 CEER recommendations (3) Some key steps (cont’d): Selection of sample: assess expected response rate and expected standard deviation through pilot surveys; identify sub-sampling according to categories (NACE) Cost analysis: execute logical tests; exclude careless responses; do not exclude zeroes; do no censor outliers Key steps for cost-estimation of voltage disturbances: For case-based approach (to be used for industry, large customers and infrastructure): deployment of VQ measurement instruments; logging of VQ events; analysis of logging journals and measurement data

7Florence Forum, Florence, 14th December 2010 Use of results Customer cost estimations and surveys are traditionally largely used for power system development (e.g. as described in Cigré report of Task Force “Methods to consider customer interruption costs in power system analysis”, year 2001, by R. Billinton et alii) Possible applications include: Input to investment decision-making process by means of contributions to cost-benefit analyses Evaluation of load shedding priorities Contribution to contingency planning and minimisation of risks associated to maintenance Setting of standards and reliability and security criteria

8Florence Forum, Florence, 14th December 2010 ‘Regulatory’ use of results Setting proper financial incentives to pursue an ‘optimal’ level of quality (transmission continuity) Provide reference for setting compensations for customer e.g. after large (long) interruptions Contribute to the regulatory approval of investment plans proposed by the network companies Setting regulatory schemes for ‘interruptibility’ service Contribute to monitoring quality of supply and to assess customer expectations; understand VQ phenomena which impact more on customers, in order to prioritise VQ regulatory monitoring/treatment Contribute to monitor/understand customer satisfaction

9Florence Forum, Florence, 14th December 2010 ‘Regulatory’ use of results Performance-based incentive regulation of transmission continuity (an example: rewards and penalties in Italy as determined by ENS) Over-performance reward Under-performance penalty Floor limiting risk Reference level (target): 4% ENS improvement in 4 years

10Florence Forum, Florence, 14th December 2010 ‘Regulatory’ use of results Differentiated rates for distribution Single reward/penalty rate for transmission

11Florence Forum, Florence, 14th December 2010 ‘Regulatory’ use of results Performance-based regulation of transmission continuity is being increasingly implemented in European countries Setting financial incentives: An option is to reflect the results of estimations of the customer costs through survey, taking appropriately into account the complementary presence and impact of more indices e.g. ENS and frequency of interruptions (AEEG, transmission continuity regulation, ) Another option is to define rates in order to stimulate TSO management attention on the costs of disruption to consumers and to encourage a strategy minimising the overall risk (Ofgem, reliability incentive consultation and decision, 2004)

12Florence Forum, Florence, 14th December 2010 CEER GGP conclusions I Customer costs due to electricity interruptions are of key importance in order to set proper incentives for continuity Customer costs due to voltage disturbances are important input when deciding where to focus regulation Society costs should be considered in addition to customer costs, as these can differ significantly NRAs should perform nationwide cost-estimation studies on interruptions and voltage disturbances

13Florence Forum, Florence, 14th December 2010 CEER GGP conclusions II CEER GGP should be used as basis for nationwide cost-estimation studies A pre-study should define objectives, clarify country-specific characteristics, budget and consultancy needs, possible funding partners, timeline for the nationwide cost-estimation study Results and experiences from cost-estimation studies shall be disseminated among interested stakeholders

14Florence Forum, Florence, 14th December 2010 Thanks for your attention Guidelines of Good Practice on customer cost surveys as an input for infrastructure development and its regulation Riccardo Vailati Co-chair CEER/ERGEG Electricity Quality of Supply task force Autorità per l’energia elettrica e il gas, Italy Florence Forum, Florence, 14 th December 2010