Page 1 International Future Energy Challenge Integrated starter/alternator topic IFEC ‘07.

Slides:



Advertisements
Similar presentations
Hazards Of Electricity
Advertisements

Beckett Energy Systems
Robot Construction, Wiring, and Safety SSI Robotics September 7, 2013 Capitol College.
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
Technician’s Version “How To Test” The Vehicle Base System of Shared Current Paths for Voltage Drop Left click the mouse to advance. Demo.
RULES FOR THE 2013 SOLAR CAR CHALLENGE. Important Dates September 1 to January 31 - “Intent-to-Race” Form This notifies Race Officials of your team’s.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
Troubleshooting Aircraft Charging Systems ( Alternators/Reciprocating Engines) by Herb Spenner.
Section 4: Electric Motors
Proper Use of Extension Cords Proper Use and Electrical Hazard Awareness for Extension Cord Users Module 2.
Indian Institute of Technology Hyderabad THE BENCH SAW BRAKE SYSTEM ATUL S VIVEK ME12B1004 JOPHIN GEORGE JOSEPH CH12B1010.
1 – Electrical Hazard Recognition EFCOG Electrical Safety Subgroup May 2015 Electrical Safety Month 2015.
GO ORDNANCE !!! ORDNANCECORPS 1 Troubleshoot the DC Electrical Control System on the EPP III.
DEBUGGING TECHNIQUES. Wiring Type of wire to use Solid core for breadboard Multiple-strand for flying leads and connections to power supply unit (PSU)
Electricity & Electronic Systems SAFETY. When are Safety Glasses required? All students and visitors MUST wear safety glasses at any time there is any.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Charging System tests & Voltage information Checking the charging system with just a volt meter.
 Recognize the scope and structure of the OSHA standards.  Identify the common electrical hazards in long term care settings.  Discuss electrical safety.
LABORATORY ELECTRICAL SAFETY Discussion topics: Electrical shock hazards Identifying hazards Research apparatus/ systems Proper emergency procedures Electricalfor.
Module 1A: Safety and Health Alexander MacFarlane.
Electrical Fundamentals
Occupational Safety and Health Course for Healthcare Professionals.
Charging System Service
Abstract In 2008 President Geoffrey introduced the Live green program which called for environmentally conscious living. In light of this initiative, it.
How PC Power Supplies Work If there is any one component that is absolutely vital to the operation of a computer, it is the power supply. Without it, a.
Chapter 19 Charging Systems.
8th RESS IG IMMA contribution RESS-8-9. IMMA L6/L7 contribution IMMA has decided to provide the global expertise on L6/L7-vehicles at WP29 to address.
8/10/20151 THE BASICS OF INFRATECH HEATER CONTROLS.
General Lab Safety ece445 Spring 2013 Dane Sievers.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
Lesson 10: Aircraft Electrical Systems
Health and Safety. The Health and Safety at Work Act 1974 An Act to make further provision for securing the health, safety and welfare of persons at work,
Pages  In this PowerPoint, write down everything that is RED!!
SFC UPSHAW POWER GENERATION EQUIPMENT Preventive Maintenance & Troubleshooting.
© Business & Legal Reports, Inc Alabama Retail is committed to partnering with our members to create and keep safe workplaces. Be sure to check out.
Technician License Course Chapter 5 Amateur Radio Equipment Lesson Plan Module 12: Power Supplies and Batteries & RF Interference (RFI)
MUEV Phase III By: Kevin Jaris & Nathan Golick. Introduction Petroleum is a finite resource. Demand for clean energy is driving the increase in the production.
Practical Electricity. Recap…  5 important formulae: Q = Charge (Coulomb) I = Current (Ampere) t = time (second) V = Voltage or potential.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Functional Requirements Generate an AC current Supply an output of 500 to 1000 Watts Supply power to the Coover Hall grid Turn off in high wind speeds.
Page 1 A message from the sponsor IEEE Industrial Electronics Society, 2009 International Future Energy Challenge.
Course ILT Safety Unit objectives Identify safety issues and hazards in the computer environment Identify ways to avoid injury and strain when working.
General Lab Safety ece445 Fall 2015 Dane Sievers Presented by Scott Carney.
Proper Use of Extension Cords
DEVELOPMENT OF LABORATORY MODULE FOR SMALL WIND TURBINE CONTROL SYSTEM (Phase V) Advisor/Client: Dr. Venkataramana Ajjarapu Group MembersPosition on Team.
Computer Hardware Technology
Wind Turbine Design and Implementation. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Unit 2: Fire Safety and Utility Controls
General Lab Safety Ece445 Dane Sievers Edited and presented by Scott Carney.
The two types of electricity used in mining are: “AC” or alternating current and “DC” or direct current.
Avoid _____________ _____________ _____________ _____________ _____________ _____________.
Altivar 32 So slim, So smart!
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
UTH-65A VER. CAUTIONS ! PLEASE USE THE OUTLET PREPARED BY A QUALIFIED SERVICEMAN AND MUST CONFIRM IT BEFORE APPLY[SING AN ELECTRIC CURRENT.
1 Welcome Safety FIRST FIRST, Safety ) >>Do not work>Do not work
Your Classroom is Full of Hazards!...Let’s Fix It. Presented by James Hernandez
Safety matters needing attention
Installation of Non-Required Equipment
Circuits Lab Introduction
Fire Safety and Utility Controls
Safety Meeting Topics Standby Generator Safety
Click anywhere to get started…
A. Touching both terminals with the hands can cause electrical shock
PSS verification and validation
Electrical components and systems
Parker domnick hunter. Safety of Electrical and
Presentation transcript:

Page 1 International Future Energy Challenge Integrated starter/alternator topic IFEC ‘07

Page 2 l Encourage development of technologies to bring dramatic improvements to low-cost 4-Q ASMD for integrated S/A application. l Incorporate practicality, manufacturability, affordability into competition process l Improve undergraduate education through development of innovative team-based solutions to complex problems Program Vision

Page 3 Technical Goals Figure 1. Functional Block Diagram of Test Set up

Page 4 Technical Goals It is very important to have proper mounting and accurate alignment for safe operation of the whole set up. MUT mounting dimension should be in accordance with NEMA 56 frame size for foot mounting configuration. MPC test set up shall have matching dimensions to couple MUT confirming NEMA 56 frame size with foot mounting configuration. It is very important to observe these dimensions and verify that MUT dimensions match NEMA 56 frame size because any deviation may cause the MUT not to mount on MPC test set up. Such a situation may lead to being unable to test the MUT. Mechanical Interface

Page 5 Technical Goals Figure 2. Electrical Interfacing

Page 6 Technical Goals Assuming screw type terminal strips on prototype, these connections will be flying leads without any termination with appropriate cable size suitable to the power ratings. Please notify us immediately if competition specifications are otherwise for these electrical interfacing. DC bus voltage monitoring and control and brake IGBT/MOSFET are part of the prototype.. Input power supply shall have a current limit set to 20 ampere in order to protect against higher current under any adverse situation. Electrical Interface:

Page 7 Technical Goals Speed profile for testing

Page 8 Technical Goals Test Methodology There are three key areas of qualitative assessments: Capability to start under 30 Nm load as starter Reach the speed up to 3000 RPM as starter Smoothly transition from starter to generator and charge the batteries at 3000 rpm

Page 9 Technical Goals Durability Test At the end of the day, all qualified hardware will be tested for durability. Fan blades may be mounted on the shaft to provide a nominal load. The motor will start from rest. The set up will be observed for 10 minutes to ensure safety and then will be left to run for about 30 minutes at the least. There will be no measurements/data acquisition/monitoring of these systems during durability test. The only protection to the set up will be the individual circuit breaker on the input power supply to each UUT. Finalists are recommended to verify their set up for such continuous run during their trials to ensure everything runs as planned at the time of final competition.

Page 10Judging l Judges will be experts from machine/drive industry l Design, operating documentation, test results, presentation, final report (including cost analysis) all considered l Development of point structure requires team participation

Page 11 Rule Issues l Repair or maintenance work on hardware on site must be approved by judges l Units with major failures or obvious severe shipping damage may not be approved for testing l Once at MPC, hardware may not be taken off site l Appeals of rulings can be made to full judging committee – their decisions are final l Teams must follow safety regulations established by MPC and IFEC.

Page 12Prizes l Highest in team scoring will have detailed cost evaluation by industry experts l Expected prizes include $10k grand prize, and several category prizes ($5k/prize). l There is an design innovation award for creativity in design and control of ASMD. This award will be presented at IECON 2009 (Portugal). in design and control of ASMD. This award will be presented at IECON 2009 (Portugal).

Page 13 A Few Points to Remember l Suggested Policy Points: l Students to work at least in pairs. l When full ac wall potential is in use, a faculty member or TA must be present. At least two people must be present. l No food or drink at lab benches.

Page 14 A Few Points to Remember l Shock hazards exist in any labs. l Most likely problems are with spilled drinks or careless wiring. l Loose clothing and neckties are a problem when motors are used. l It only takes a watt to make small parts hot. l Often metal cases are live.

Page 15 A Few Points to Remember l Serious power electronics work – l Safety glasses l Fire extinguishers l A safety plan, to include circuit protection

Page 16 A Few Points to Remember –Turn power off when making circuit changes. –Keep a tight, neat setup. (It is safer, easier to debug, and just plain works better.) –Treat part cases as live or hot. –When in doubt, shut power off. –If it doesn’t work, it probably isn’t the instrument.

Page 17 A Few Points to Remember l Equipment damage is a common safety issue. l Problem areas: –Grounding. Students often don’t understand limitations of grounded probes or sources. –Ratings. Do instrument ratings match the signal?