1 Alpha Magnetic Spectrometer – 02 Phase III Flight Safety UPS Overview Jan 12 2010 John A. Heilig ESCG/Jacobs.

Slides:



Advertisements
Similar presentations
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Advertisements

Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Battery Safety and Design Manual for Payloads presented by Jerri S. Ling September 13, 2004 presented by Jerri S. Ling September 13, 2004.
Circuit Analysis and Troubleshooting A Six Step Procedure Created by Jimmie Fouts Houston County Career Academy for.
NEXT GENERATION LITHIUM ENERGY STORAGE.. COMPANY OVERVIEW Research & Development/Sales/Distribution/Manufacturing Product Development Auxiliary power.
ELECTRICAL SAFETY ISSUES DISCUSSION WITH SHUTTLE SMALL PAYLOADS PROJECTS (a.k.a. HITCHHIKER)
Magnet and Magnetic Fields Phase III Flight Safety Review January 12, 2010.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Space Cowboys. Mission Overview Objective – Accurately measure flight parameters including ambient and skin temperatures, pressure, acceleration, spin.
Charge Controllers Charge Controller Features Charge Controller Types
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Care and Feeding of Rechargeable Batteries Introduction Rechargeable (or secondary) Can be charged and discharged many times, versus one time use of "primary"
Overview of the 1.
As presented to July Battery Management Systems for Electric Vehicles.
National Highway Traffic Safety Administration U.S. Proposal on BMS Functionality-In Use Brian T. Park Safety Engineer.
For Electric Vehicles Team Members: Pramit Tamrakar - EE Jimmy Skadal - EE Hao Wang - EE Matthew Schulte - EE William Zimmerman - EE Advisor: Ayman Fayed.
Lesson 9: Electrical Components
Noah Garcia-Galan *Some information in this presentation comes from outside sources.
Designing Solar PV Systems (Rooftops ). Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing Solar.
1 wp4 – Technical Issues for payload integration within the Nacelle for High Altitude flight Budapest 24/11/04 Marco Bobbio Pallavicini Carlo Gavazzi Space.
PRBA – The Rechargeable Battery Association
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
From Research Prototype to Production
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
Morehead State University Morehead, KY Prof. Bob Twiggs Power Systems Design
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
Basic Electric Circuits Chapter 18. Circuit Components.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Alpha Magnetic Spectrometer Alpha Magnetic Spectrometer – 02 Phase III PSRP / SRP Electronics Summary January 12, 2010 Timothy J. Urban / ESCG / Barrios.
Dec07-02: Prototype Parking Meter Phase 8 Bret Schuring: Team Leader Pooja Ramesh: Communications Wilson Kwong, Matt Swanson, Alex Wernli.
1 Washington, Sept 29th, 2014 Informal working group: Large Lithium batteries testing RECHARGE & SAFT.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
Senior Design II Final Presentation December 1, 2009.
TA Station Power Team Meeting, 11/10/2015. Autonomous Power System – In the field Why Lithium? -Significant weight and volume savings (41.9Wh/lb vs 21.25Wh/lb)
Senior Design II Midterm Presentation September 29, 2009.
Halliday/Resnick/Walker Fundamentals of Physics
Payload Safety Review Plan and Issues Leland D. Hill.
Composite Overwrapped Pressure Vessels
Mid Semester Presentation. Team Members Chapman, Jonathan Duties: Recharging Circuit Major: Electrical Engineering Dang, Quoc Duties: Power Circuit, Website.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
May07-02: Parking Meter Clint Hertz: Team Leader Austyn Trace: Communications Nick Hollander Christian Baldus.
Mid Semester Presentation February 24, Team Members Chapman, Jonathan Duties: Recharging Major: Electrical Engineering Dang, Quoc Duties: Cell Monitoring.
Power Supply System Discussion Topics Steve Virostek / John Joseph LBNL Spectrometer Solenoid Workshop May 10, 2011.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
Final Presentation April 13, Team Members Chapman, Jonathan Duties: Recharging Major: Electrical Engineering Dang, Quoc Duties: Cell Monitoring.
HVAC System Controls part 2 1 Heater controls Electrical: – Wiring diagrams – Blower controls Conventional circuits Multiplex circuits – Actuators Vacuum.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Copyright© 2005 Avaya Inc. All rights reserved Avaya UPS Training powerware.com/avaya.
HiRate Energy Overview and Storage Energy System Introduction 1 Mark Lin, CEO.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
MICE Spectrometer Solenoids Step IV running
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Dec06-02: Parking Meter Ryan King: Team Leader Kristen Goering: Communications Justin Smith John Scapillato.
Common Problems with Performance/Testing of Batteries
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Lithium Ion Battery Safety
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
SAE battery safety standards committee UPDATE January 23, 2019
Series and Parallel Circuits
Presentation transcript:

1 Alpha Magnetic Spectrometer – 02 Phase III Flight Safety UPS Overview Jan John A. Heilig ESCG/Jacobs

2 Alpha Magnetic Spectrometer – 02 Uninterruptible Power Supply (UPS) The UPS system consists of a redundant set of Lithium-Ion batteries (2 independent 8 cell units) To ensure mission success during loss of ISS power or communication, the UPS battery provides control power to the payload for: –Watch-dog timer/control circuit –Quench monitoring –Initiation of quench heater 45A pulse –Nominal ramp-down at the end of the eight hours. –CPVS Solenoid valve operations Are sized for a minimum of 8 hours of operation, plus assisted quench operation / ramp down

3 Alpha Magnetic Spectrometer – 02 Uninterruptible Power Supply (UPS) Battery is designed to meet: –NSTS B, “Safety Policy and Requirements For Payloads Using the Space Transportation System” –NSTS B ISS Addendum, “Safety Policy and Requirements For Payloads Using the International Space Station” –JSC 20793, “Manned Space Vehicle Battery Safety Handbook” JSC EP3 Battery Safety Form – Rev C

4 Alpha Magnetic Spectrometer – 02 CAB to UPS Block Diagram

5 Alpha Magnetic Spectrometer – 02 UPS Battery

6 Alpha Magnetic Spectrometer – 02 Uninterruptible Power Supply Components

7 Alpha Magnetic Spectrometer – 02 UPS Battery “Bricks” (old cells)

8 Alpha Magnetic Spectrometer – 02 UPS Battery Management System (BMS) BMS is a radiation tolerant circuit that monitors and maintains a series string of eight Li-ion battery cells, with a nominal output voltage of 32VDC. The battery is monitored for unhealthy temperature and/or electrical conditions, upon which the system reacts to protect the cells. –Automatic Cell Balancing –Thermal Monitoring –Over-discharge Monitoring –Short Circuit Protection –Cell Over-voltage Monitoring BMS consists of three PCBs: –Master Control Board –QTY 2 Monitor/Equalizer boards

9 Alpha Magnetic Spectrometer – 02 UPS BMS Electronics

10 While in testing by AMS-02 Collaboration personnel, the QM UPS suffered a catastrophic failure due to improper test setup and monitoring. After a failure investigation with the AMS-02 collaboration testing partner, MIT pulled the contract for continued assembly and testing of the UPSs and awarded it to Yardney Technical Products, the original battery cell manufacturer and a leader in the field. Alpha Magnetic Spectrometer – 02 Current Status

11 Upon receipt of the 4 remaining UPS units, an incoming inspection by Yardney noted that multiple cells in the units shows signs of decreased capacity. No obvious cause could be determined by observation or testing of the UPSs, BMSs, or cells. It is strongly suggested the cause of the cell capacity issue was improper handling and storage before being received by Yardney. Alpha Magnetic Spectrometer – 02 Current Status

12 Due to the low capacity, the decision was made to remanufacture identical cells to repopulate the entire set of flight and flight spare UPSs (8 cells x 4 units) and perform Protoflight testing on these cells. This cell design was Qual and Acceptance tested originally per L , Qualification Test Report for the Alpha Magnetic Spectrometer-02 (AMS- 02) Uninterruptible Power Source (UPS) NCP25-3 Lithium- ion Cells Per LiTP-6208 Test Dates 1~05 to 2/17/05, Rev. -, Dated 3/11/2005 The four (4) UPS units, 2- FL, 2- FS are being assembled now and will be fully flight certified. During integrated testing of the Flight Spare units, issues were discovered with one FET and resistance drift on thin film resistors on the BMS circuits. Components replaced. Alpha Magnetic Spectrometer – 02 Current Status

13 Alpha Magnetic Spectrometer – 02 Current Status

14 Alpha Magnetic Spectrometer – 02 Current Status NCP25-3 AMS-02 Cell Score for Unit Grouping

15 Alpha Magnetic Spectrometer – 02 Current Status Flight Spare and Flight Unit UPSs are currently in assembly and Test at Yardney. Uncertified ( partially ) Flight Spare units will be used at ESTEC for TVT testing FS units will be replaced with fully certified Flight units upon arrival at KSC. FS units will be returned to Yardney to complete Flight certification Delivery of two (2) FS units is expected Jan 15 and two (2) Flight units will be delivered to KSC by the end of Mar ‘10.

Full details of the UPS are included in the Safety Data Package –Section Cryomagnet Control and Signal Conditioning (CCSC) –Section Cryomagnet Self Protection (CSP) –Section CSP Uninterruptible Power Source (UPS) –Hazard Report 13 –Battery Failure (Leakage/Rupture) Alpha Magnetic Spectrometer – 02 Conclusion