The Quality Assurance and Reliability Testing (QART) Lab at CERN A. Honma, CERN PH/DT 26 April 2010CMS Upgrade Meeting, A. Honma1  Purpose of Lab  Lab.

Slides:



Advertisements
Similar presentations
Eija TuominenHIP Detector Laboratory October Helsinki Institute of Physics DETECTOR LABORATORY National infrastructure to support Finnish research.
Advertisements

Electrical and thermal testing at Glasgow and Liverpool.
ATLAS Module building at Glasgow
Wire Bonding Quality Issues
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
Mechanical Risks to Tracking Detector Bond Wires A. Honma, CERN PH/DT  Brief intro to wire bonding  Physical contact damage  Vibration and shock from.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
3D PACKAGING SOLUTIONS FOR FUTURE PIXEL DETECTORS Timo Tick – CERN
WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.
GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 1/9 PH-DT Status of Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Quality Assurance and Reliability of Silicon Trackers A. Honma, CERN PH/DT 3 June 2013A. Honma, 2013 Talent Summer School1  Quality Assurance and Reliability.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
A. Honma, CERN  Module production: definitions, scope  Industrialization: What do we mean?  Possibilities for automation and outsourcing  Automation.
Some real-life experiences that highlight the importance of quality and reliability issues for CERN projects A. Honma, CERN PH/DT 4 July 2013A. Honma,
Detector and Front-end Electronics Issues: Qualification and Reliability Testing A. Honma, CERN PH/DT 23 November 2010ESE Seminar1  Introduction  Qualification.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
ALICE Silicon Strip Detector Module Assembly with Single-Point TAB Interconnections 1) Introduction 2) Collaboration 3) ALICE SSD module 4) Assembly phases.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Concept Design for LBNF Far detector (LAr single phase)
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Radiation hard, micro-engineering solutions for thermal management in high energy physics and space applications Diego Alvarez Feito, Julien Bonnaud, Enrico.
Detector building Notes of our discussion
Ti/SS transitions A.Basti INFN-PISA*
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Micro-channel Cooling
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
Quality assurance for CMS Tracker Phase II upgrade 2S modules
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
ALICE PD group meeting Andrea Francescon.
BOND/QART Lab and Pixel R&D
Joint Meeting SPS Upgrade Study Group and SPS Task Force
HO Corrector Magnets: decapole test and future plans
Ideas and Plans on Tracker Module Mechanics Developments
UK RFD Pre-Series cryomodule
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

The Quality Assurance and Reliability Testing (QART) Lab at CERN A. Honma, CERN PH/DT 26 April 2010CMS Upgrade Meeting, A. Honma1  Purpose of Lab  Lab site  Personnel and Equipment  Activities  The DSF and Bonding Lab  Conclusions Outline

Purpose of Lab Was created from the White Paper initiative of the DG in 2007, R&D for LHC upgrades Part of WP6: Interconnect Technology and QA (for LHC silicon detector upgrades) Located in the PH Departmental Silicon Facility (DSF) in Bldg 186 Common QA lessons learned from LHC silicon detector construction should be documented. Avoid mistakes in the LHC detector upgrades and provide infrastructure and expertise to apply QA and reliability testing for the upgrade R&D and construction phases. QA  Planning and procedures common to ANY project. Broader scope for lab: any LHC detector, non-LHC detectors, other CERN projects Reliability Testing has become essential owing to lack of accessibility and long expected life times of detectors and electronics 26 April 2010CMS Upgrade Meeting, A. Honma2 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab

26 April 2010CMS Upgrade Meeting, A. Honma3 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Lab Site CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Location of QART lab is inside B186-R (ground floor) in the Departmental Silicon Facility B186 CMS Tracker Integration Facility Departmental Silicon Facility Bldg 186 High Bay Hall QART Lab CMS Preshower Final Assembly

QART Website: Personnel (2.5 FTE): 1 proj. assoc. (F. Manolescu) – 100% 1 fellow (A. Drozd) – 100% Equipment: Climatic chamber (large volume, fast temp. cycling with humidity control) Thermal cycling chamber (small volume, med. speed, no humidity control) Vibration tester (mono-axial shaker can deliver 10G’s to 10Kg payload) Infra-red thermal imaging video camera High magnification stereo-microscope on probe station with video camera Small aperture permanent magnet with B=0.7T for high mag field studies Die shear tester / bond wire pull tester 26 April 2010CMS Upgrade Meeting, A. Honma4 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Personnel and Equipment CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab 1 physicist (A. Honma) – 30% 1 technician (I. McGill) – 20%

+60°C -30°C +20°C 65 min TOTEM hybrid thermal cycle 26 April 2010CMS Upgrade Meeting, A. Honma5 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Equipment: Climatic Chambers CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Climatic Chamber Temp range: -70°C to +180°C Hum range: 10% to 95%RH Heating speed: 15°C/min Cooling speed: 11°C/min Thermal Cycling Chamber Temp range: -40°C to +180°C Heating speed: 5°C/min Cooling speed: 6°C/min Tests: Thermal cycling Accelerated lifetime Humidity tolerance Cold tolerance Stress screening Environment simulation

26 April 2010CMS Upgrade Meeting, A. Honma6 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Equipment: Vibration Tester CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Mono-axial shaker with control system and analysis tools for Random, Sine, Shock, and Recorded vibration inputs. Can perform: Destructive testing Stress screening Modal analysis Playback of transport and handling vibrations and shocks 30cm x 30cm head expander allows testing of large objects (ex.: CMS silicon tracker module) Accelerometer on silicon sensor Acceleration frequency spectrum

26 April 2010CMS Upgrade Meeting, A. Honma7 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Equipment: IR Video Camera CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab High sensitivity (0.1°K) thermal imaging IR video camera. Expected uses: Identifying hot spots on silicon sensors, thermal run-away conditions(?), … Heat flow study on front-end PCBs and detector modules Many other possible uses … Example #2: Malfunctioning heating loop was easily located on one of CMS Tracker Endcap panels. Example #1: Motherboard of a PC. Frame capture from the video output. 4: Hottest point in frame 1: and 2: User selectable measurement points (3 max) Temperature measurements

26 April 2010CMS Upgrade Meeting, A. Honma8 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Equipment: High Magnification Zoom Stereo-microscope CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab High magnification (up to 320x) needed for silicon sensors (pixel or strips) and for (bare) read-out chips. Stereo needed for 3-D structure identification. Video camera useful if object’s visual aspect has time dependence and for documentation. Possibility to probe the observed object. Example: Poor wire bonding quality can often be spotted from surface details and form of welded bond “foot”. Below: right-most bond foot is heavily over-deformed (flattened). 50μm acceptablemarginal rejected Leica MZ16

26 April 2010CMS Upgrade Meeting, A. Honma9 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Equipment: High Field Magnet CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Motivation: CDF silicon strip detector had broken bond wires from vibration owing to AC current at resonant frequency of wires (10-30KHz) in high B field (1.4T). 0.7 T dipole field using neodymium magnets. Plan to get a small electromagnet with up to 2T Resonant oscillation on bond wire of 3.5mm length found at 6.8KHz. Both ATLAS and CMS have determined the risk of existing bonds to be minimal but have taken precautions to avoid fixed frequency triggers. ATLAS has published an analysis for at-risk bonds in ATLAS silicon detectors. But no known systematic study of effects of wire loop properties and bonding quality on breakage risk. Try to quantify more generally these risks. In agreement with FEA calculations

Activities, Past/Planned All equipment is ready for use by the user community. Although priority is given to the LHC experiments silicon detector upgrade projects, other upgrade projects, other experiments, and other CERN projects can use the lab. Examples of tests done or planned: Thermal cycling done on front-end electronics (CMS, TOTEM, ALICE), sensors/chips (Medipix), standard PCBs (LHC quench protection system, CMS Preshower), small mechanical structures. Tests can be passive or active (users provide control and powering electronics). Accelerated aging (timed heat soak) performed for corrosion (with humidity), metal migration (bond wire pads), oxidation. The IR video camera used for hot spot detection on silicon sensors. We plan to do transport and handling vibration damage studies for silicon detector modules and components. This will include real recordings of transport examples (plane, truck, train) for playback. Continue wire vibration damage studies in magnetic field. 26 April 2010CMS Upgrade Meeting, A. Honma10 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab

The Departmental Silicon Facility (DSF) The QART lab shares clean room space and personnel with the bond lab. The QART lab also uses space in the non-clean DSF areas. 26 April 2010CMS Upgrade Meeting, A. Honma11 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab Bond and QART Lab ATLAS RD50 Technical Rooms and Airlocks Non-Clean Areas Departmental Silicon Facility (2010) RD50 ALICE LHCb and Medipix DSF Clean Room (~270m 2 usable) LHCb CMS ~30m  ~85m  ~65m  Access Way PEG PEPE PG PEG PE PEG P PPE P P=power, E=Ethernet, G=gas lines (N2) Clean room boundary

The Bonding Lab The Bonding Lab is a CERN shared facility which is dedicated to: Ultrasonic wedge wire bonding with aluminium wire. Pull testing of wires (destructive and non-destructive). Die attach (chip and small detector gluing). Encapsulation of wire bonds (new). 26 April 2010CMS Upgrade Meeting, A. Honma12 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab 2 Delvotec 6400 ultrasonic wedge wire bonding machines IJ Fisnar 7300-LF Glue (Encapsulation) dispenser Cammax DB600 die bonder with heated chuck Dage 4000 bond wire pull tester and die shear tester CERN Bond lab did about 20% of CMS Tracker bonding + 100% of Preshower. Now doing sensor, chip and radmon R&D for CMS.

Conclusions Quality Assurance and Reliability Testing (QART) Lab is now equipped with all foreseen major test apparatus. Lab personnel are trained or in training for test equipment. We are able to provide test services (for smaller jobs) or advice and assistance (for larger jobs) to the LHC experiments upgrade projects. We have a resource library and experience concerning quality assurance for detector projects. We are always interested in learning from others experience as concerns quality issues. Reliability testing is a critical step in assuring that the components and the systems that cannot be easily repaired or replaced will be able to function over the required lifetime. Please feel free to contact us for questions, discussions, planning and requests for QA, reliability testing, equipment usage, wire bonding and chip gluing. 26 April 2010CMS Upgrade Meeting, A. Honma13 CERN DSF QART and Bonding Lab CERN DSF QART and Bonding Lab