Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.

Slides:



Advertisements
Similar presentations
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
Advertisements

Heavy Concrete Construction Formwork
MY1C Series Rodless Cylinder
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Mech assemblymay MuTrFEE Assembly Procedure Mechanical.
NTOF11 Hg System Design Status Van Graves Tony Gabriel, Phil Spampinato Collaboration Meeting – Princeton University Apr 2005.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
XFD – XF Engineering Group October 20, 2005LCLS Undulator Alignment and Motion System1 Precision and repeatability of cam-shaft system in both directions.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
LCLS Undulator Alignment and Motion Review 1 LCLS schematic view LCLS Undulator Alignment and Motion Review.
LCLS Prototype Undulator Design LCLS Prototype Undulator Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Stephen Milton 12 Jan IDR of Undulator System Fixed Supports 12 Jan
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
General idea of a couple of check rod system and adjustments
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
B ASEPLATES S LIDE S HOW. Anchor Bolts are positioned and placed in the concrete before it cures. Plastic caps are placed over the anchor bolts to protect.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
IMMOBILE ACCESS FLOOR SYSTEM  The immobile access floor system is a product which is suitable for different official places. The material.
From Left to Right: Adam York, Brian Brink, Betty Jo, Mitchell Greene, Marshall Noble. (NOT PICTURED): Stephanie Jacobs Project.
Tracking Integration Challenges Y. meeting 2013/9/25.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
1 BROOKHAVEN SCIENCE ASSOCIATES S.Sharma 10/11/2006 NSLS-II Mechanical Subsystems Accelerator Systems Advisory Committee Review October 10-11, 2006 Sushil.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
ELENA Support system 6/11/2014 Antti Kolehmainen on behalf of WP Support system
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
Geoff Pile Single Undulator Test and Integration 12 th October2006 LCLSLCLSLCLSLCLS Single Undulator Test and Integration Geoff Pile.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
C OLUMNS S LIDE S HOW. Columns are brought in with a crane and placed on over their respective base plates and fastened once they are plumbed, tie down.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Warm Vessel Leveling Islands (Piers)
MICE Partial Return Yoke Mechanical Design
SPARC Review Committee Meeting
BASEPLATES SLIDE SHOW.
COLUMNS SLIDE SHOW.
LARP Phase II Secondary Collimator RC-0 and RC-1
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Valve stem “gag” mechanism
Neutron guide Shielding Concept
Fixed Support Design & Testing
DOE Review of the LCLS Project (SLAC) October 24-26, 2006 Single Undulator Test and Integration Geoff Pile.
Replace Timing Belt 300 Hours.
Presentation transcript:

Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma and Brian Rusthoven

2 General Design 18” Support Tube 1½” Support Plates Sand Filled 3” Wool Fiber Insulation 1½” Anchor Bolts

3 Alignment Features Cam Mover Support Pocket 1” Beam Direction Movement 1” Transverse BDM Removable Z Axes Guides

4 Preliminary Installation & Alignment Plans Align Grouting Plates at Lattice Locations –Available Adjustment ± ½” (12.7 mm)

5 Preliminary Installation & Alignment Plans Anchor Grouting Plates at Lattice Locations

6 Preliminary Installation & Alignment Plans Add Grout under Grouting Plates at Lattice Locations

7 Preliminary Installation & Alignment Plans Rough ±5mm position Support Stands on Grout Plates –Final position later from MMR numbers

8 Preliminary Installation & Alignment Plans Fill Support Stands –Add Silica sand to stand pipe –Cap Stand with Cap Plate –Add 3” Fiber wool Insulation to stand

9 Preliminary Installation & Alignment Plans Magnet Measurement Room Loosely attach CAM Movers to CAM Support Plates using the alignment grooves that utilizing the tight machined tolerances of the CAM Housing

10 Preliminary Installation & Alignment Plans Magnet Measurement Room Position Girder on CAM Movers to Specifications Required –Secure CAM Movers to CAM Support Plate –Record dimension between CAM Support Plates for use in final stand positioning

11 Preliminary Installation & Alignment Plans Precision position Support Stands on Grout Plates using dimensions obtained from MMR measurements and CAM Mover Support plate grooves.

12 Preliminary Installation & Alignment Plans Final Installation Using dimensions obtained from MMR measurements position CAM Mover Support plate sub-assembly on support stands and precision position using plate mover mechanism.

13 Preliminary Installation & Alignment Plans Final Installation Install Undulator Assembly on CAM Movers using Girder Cart.

14 Preliminary Installation & Alignment Plans Final Installation Remove CAM Support Plate moving mechanism and install Earth Quake Restraints

15 Preliminary Installation & Alignment Plans Elevation Adjustment Guides Elevation adjustment guides are to be installed prior to lifting the support for height adjustment.

16 Preliminary Installation & Alignment Plans Elevation Adjustment Guides After the Elevation adjustment guides are installed the Air Jack system can be used to remove most of the weight from the stand.