EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
IDS CERN March 30, 2007 Marco Zito Super-beam work package in the Euro ν DS: status and plans Marco Zito Dapnia-Saclay On behalf of the SB wp team IDS.
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
17 Dec. 2008M. Dracos, EUROnu-WP21 Collector and the SPL Super-Beam Project Marcos Dracos IPHC-IN2P3/CNRS Strasbourg.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
A new design for the CERN to Fréjus neutrino beam Marco Zito (IRFU/CEA-Saclay) For the EUROnu WP2 team NUFACT11 Geneva August 2nd 2011.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
EUROnu Target and Horn Studies Nikolaos Vassilopoulos/IPHC-CNRS on behalf of WP2 1ECFA Review PanelDarensbury, 02/05/2011.
European design study on Neutrinofacilities - Euronu within FP7.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
1 of 12 Stephen Brooks JAI Advisory Board, February 2006  Neutrino Factory Muon Beam Production Studies.
Safety issues for WP2 E. Baussan on behalf of WP2.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
CERN/BENE meeting, July Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg Who.
RAL/ISS meeting, April Marcos Dracos Collection system, horn (work mainly done by Francis Osswald) goals and perspectives suppliers and collaborations.
Neutrino Factory R&D in Europe Rob Edgecock/RAL. Outline Introduction i.e. what has happened since last year European feasibility study Proton driver.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Kaons in the SPL Superbeam Antoine Cazes Laboratoire de L’accélérateur Linéaire.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
A CCELERATOR S ESSIONS S UMMARY D AVE W ARK, I LIAS E FTHYMIOPOULOS Neutrino Strategy Workshop CERN, October 3, 2009 Outline  Show highlights from the.
From the SPL to the 4-target-horn system: Preliminary design of a beam switching yard WP2: Super Beam 4 th EUROν Annual Meeting, Paris, June 13, 2012 E.
WP2 13/07/2011M. Dracos1 Marcos Dracos IPHC-IN2P3/CNRS, Strasbourg.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
EUROnu Super Beam Work package Marco Zito (IRFU/CEA-Saclay) For the WP2 team EURONu Review CERN April
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
Challenges and Progress on the SB Horn Design
IPHC-IN2P3/CNRS Strasbourg
Beam switching yard interfaces
The ESS Neutrino Super Beam and associated large Cherenkov Detector Design Study Lund 2014 M. Dracos.
WP2 (SuperBeam) Targets Status of Work Programme
Target and Horn status report
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
Superbeams with SPL at CERN
Collector and the SPL Super-Beam Project
Superbeam Horn-Target Integration
EURO Conclusions from Cracow meeting
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
The European Consortium working on the ESSνSB project
Presentation transcript:

EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos for providing materials!

EuroNu CERN February 5, 2008 Marco Zito Outline About this workpackage Focusing on the most challenging/crucial problems : –The target - talk by C. Densham –The collector –The target/collector integration –Neutrino beam simulation Participating institutes: IN2P3, CEA/IRFU(previously Dapnia), CCLRC, Cracow U. of Technology Deliverables and milestones -> a CDR for the Superbeam!

EuroNu CERN February 5, 2008 Marco Zito What Euro ν DS Superbeam is about-1 Consider as baseline the SPL to Frejus concept MEMPHYS Far detector feasibility, excavation, engineering is covered by the Laguna DS

EuroNu CERN February 5, 2008 Marco Zito What Euro ν DS Superbeam is about-2 Proton driver and target : many issues in common between Super-Beam and NF Decide to join forces and tackle these problems in this WP The NF WP will focus on the muon front-end The conclusion of this WP will then be incorporated in the SB and NF CDRs

EuroNu CERN February 5, 2008 Marco Zito SPL Important and very positive recent news (see next slides from R. Garoby and F. Gerigk) CDR for SPL available Ongoing work by dedicated team Refinements, R/D, further studies in other frameworks (HIPPI, IA …) Changes to this proton-driver design only from the optimization of the target and collection or from the physics and detector studies

EuroNu CERN February 5, 2008 Marco Zito CERN-AB PAF

EuroNu CERN February 5, 2008 Marco Zito

EuroNu CERN February 5, 2008 Marco Zito

EuroNu CERN February 5, 2008 Marco Zito

EuroNu CERN February 5, 2008 Marco Zito Collector Main challenges: design of a high current pulsed power supply (300 kA/100 μs/50 Hz), cooling system in order to maintain the integrity of the horn despite of the heat amount generated by the energy deposition of the secondary particles provided by the impact of the primary proton beam onto the target, definition of the radiation tolerance, integration of the target.

EuroNu CERN February 5, 2008 Marco ZitoCollectors horns Or solenoid In operation completed built MiniBooNE CNGSK2K (SB) NUMI In operation M. Dracos

EuroNu CERN February 5, 2008 Marco Zito Focusing system: magnetic horn Protons Current of 300 kA To decay channel Hg Target B 1/R B = 0 M. Dracos

EuroNu CERN February 5, 2008 Marco Zito Horn prototype ready for tests M. Dracos

EuroNu CERN February 5, 2008 Marco Zito The power supply Due to the high price go to a modular system and increase small by small the current M. Dracos

EuroNu CERN February 5, 2008 Marco Zito Neutrino Beam simulation Needed to optimize the target, collector, decay tunnel Use modern tools (GEANT 4) and recent data (HARP) Input to the physics work package for the performance evaluation Need to develop in synergy with similar studies in existing SB and in the IDS community

EuroNu CERN February 5, 2008 Marco Zito "Physics" studies to be restarted energy deposition z (cm) P (kW) z (cm) corne corne 2 M. Dracos

EuroNu CERN February 5, 2008 Marco Zito Sensitivity 3.5GeV sin m %CL 95%CL 99%CL Minimum: 13 = 1.2° (90%CL) Preliminary A.Cazes thesis

EuroNu CERN February 5, 2008 Marco Zito Deliverables DeliverableDelivery date (months) Requirements for proton driver 6 Target and Collection design report 30 Target and Collection integration 36 Beam characteristics36 Final report48

EuroNu CERN February 5, 2008 Marco Zito Milestones MilestoneDelivery date (months) Proton driver report12 Prel. Design of Target and Collection 24 1st Target and Collection integration drawings 24 1st Est. of Nu Beam Intensity 24 Final Target and Collection integration drawings 36 Design of target station40 Report on Nu Beam Intensity 42

EuroNu CERN February 5, 2008 Marco Zito Conclusions SuperBeam work package of the Euro ν DS is focusing on the key issues for this project The SPL to Fréjus project is the baseline Excellent news from SPL side Feasibility and conceptual solutions for the target and collector (horn) will be studied A strong European collaboration is ready to contribute to this field