Regulation of Low Level Waste Management

Slides:



Advertisements
Similar presentations
Proposed UK Strategy for the Management of Solid Radioactive Waste from the Non-Nuclear Industry Katherine Mondon – representing the Department of Energy.
Advertisements

Management of the LLW National Waste Programme David Rossiter Head of National Programme.
Introduction to VLLW Disposal Services
Managing Hazardous Waste India-EU Environment Forum Waste Management in the 21 st Century 12 November 2005 Sarah Paul Senior Policy Adviser Hazardous Waste.
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Building pride in Cumbria Do not use fonts other than Arial for your presentations NuLeAF Steering Group 24 October 2012 Nuclear site waste management.
Building pride in Cumbria Do not use fonts other than Arial for your presentations Low Level Waste facilities and proposals in Cumbria NuLeAF seminar 22.
LOW LEVEL RADIOACTIVE WASTE MANAGEMENT Implementation issues – the Governments perspective (DECC & NDA) Bruce Cairns & Matthew Clark 22 nd March 2011.
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
LA LLW Arisings and Capacity Analysis Nuleaf Radioactive Waste Planning Seminar 12 th March 2013 David Rossiter Head of National Programme LLW Repository.
Challenges in LLW Management: a Local Government Perspective Fred Barker, Executive Director, NuLeAF SAFESPUR FORUM 29 April 2009.
Date: 13/06/20071 Sustainable practices relating to decommissioning of concrete structures Presented by Paul Kelly MCIWM Characterisation Land Quality.
Environmental Safety Case and Changes to Waste Acceptance Date: 25th April 2012 Dr Richard Cummings – LLWR ESC Project Manager Presentation to: Customer.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Air Quality and Land Use Planning Land Use Consultants 11 th March 2008 Susanne Underwood.
Pravin Amar Development Planners 14 July 2005, Assagay Hotel, 5pm Applicant: EnviroServ Waste Management (Pty) Ltd. Environmental Consultants Pravin Amar.
Presentation on recent IAEA activities on RWM Y. Kumano WES / NSRW
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
The Environment Agency Alasdair McKellar – PPC/COMAH Regulatory Officer.
Facilities Management Category Management Plan Synopsis Version 1.1 (March 2015)
Implementing NDA’s Strategy - a year on Update to NuLeaf September 2012 Bill Hamilton, NDA Head of Stakeholder Relations.
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
Environmental Impact Assessment (EIA): Overview
Update on progress with development of DS459
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
IAEA International Atomic Energy Agency Senior Regulators Meeting Technical Cooperation Programme Supporting Radiation Safety Infrastructure in Member.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
Overview of the Work Zone Safety and Mobility Rule Module 1.
TM Technical Meeting on the Disposal of Intermediate Level Waste
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
NuLEAF Seminar Developing the Evidence Base – LLW arisings and the need for management facilities 22 nd March 2011 Mervin McMinn – National Waste Inventory.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Slide 1 An Alfred McAlpine plc company. Thursday, 04 October 2007 Land Management Guidance (v2) Philippa Towler.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
Clean-up of former nuclear sites and the role of the Planning regime Jim Cochrane.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
ILW disposal in the UK Presentation at IAEA TM-45865, September 2013 Cherry Tweed – Chief Scientific Advisor.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
IAEA ANSN RWMTG National Workshop: Application of IAEA Methodology and Tools for the Safety Case and Safety Assessment for Predisposal Management of Radioactive.
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Coordination between National Regulators for the Safety and Security of International Shipments of Radioactive Materials between Member States Stephen.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Integrated Waste Management Strategy – preparing for SIII NuLeAF – 29 th January 2015.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
NuLeAF Seminar NDA Integrated Waste Management Strategy Programme update 24 th October 2012.
IAEA International Atomic Energy Agency Technical Meeting on the Demonstration of Operational and Long Term Safety of Predisposal Management Facilities.
RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety TCEU School of Drafting Regulations November.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Requirements for.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
It Is a Moral Issue – Why We Should Say ‘No’ to Nuclear Andrew Blowers Presentation at Thornbury, November 2010.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
1 Introduction to safety case and safety assessment: purpose and content of safety case Ian Crossland Crossland Consulting
Nuclear and Treaty Law Section Office of Legal Affairs
Updating the NRC’s Alternative Disposal Request Guidance Document
NRC’s LLW Regulatory Program: Update of Emerging Issues
NDA Draft Strategy.
Communication and Consultation with Interested Parties by the RB
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Nick Bonvoisin Secretary to the Convention on the
Industry Input on NRC’s Low-Level Waste Program Strategic Assessment
Presentation to the Environmental Health Sub-committee – November 2017
Presentation to the Environmental Health Sub-committee – November 2013
Optimisation in Operational Radiological Protection
Presentation transcript:

Regulation of Low Level Waste Management

This will cover…. Environment Agency role in implementing Government policy Our approach to authorising more flexible routes introduced by the policy – existing landfills and new facilities on or adjacent to nuclear sites Proposals to change authorisations to facilitate LLW transfers for treatment and disposal Regulatory oversight of LLWR’s Environmental Safety Case

Our role in implementing Govt. Policy on LLW Help ensure that it is properly implemented Ensure that plans are informed by assessment of potential radiation exposures and risks Upper limits to exposures and risks are the same for all types of radioactive waste disposal sites Lower levels of controls needed for less active wastes

Guidance – LLW disposal Revised guidance, published Feb 2009 Applies to all near surface disposal: Engineered facilities such as LLWR, near Drigg New facilities on or adjacent to nuclear sites Existing landfills

LLW disposal to landfills, and new facilities on or adjacent to nuclear sites

Government policy 2007 LLW Policy recognised: Disposals from to existing landfills High Volume - Very Low Level Waste (HV-VLLW) Low Volume - Very Low Level Waste (LV-VLLW) Controlled Burial of LLW Disposal to facilities on or adjacent to nuclear sites

LLW disposal to landfill – LV-VLLW LV-VLLW (‘dustbin disposals’) Status quo – well established Non-nuclear origin (hospitals, universities etc.) < 50 m3/y No controls on radwaste aspects after leaving consigning site From research we are satisfied there is no risk to human health or the environment

LLW disposal to landfill – HV-VLLW Not totally new – some small nuclear sites have had this type of disposal route for several years We will treat all nuclear site VLLW disposals as ‘high volume’ Consignor and landfill operator must hold an RSA93 authorisation Radiological impact assessment required for any proposed landfill site A simple assessment, referring to published research, may well suffice If not we would expect proportionate application of our ‘GRA’ guidance If authorised we would set an upper mass/volume limit, but generally would not include conditions on how the waste is managed on site. We will focus on: Adequacy of management systems Records

LLW disposal to landfill – ‘Controlled Burial’ As HV-VLLW except: Activity of any given volume of waste will be higher A more detailed radiological assessment will be necessary, making proportionate use of specialist guidance (e.g. GRA) We may impose additional conditions to ensure impacts are controlled

LLW disposal to sites on or adjacent to nuclear sites Covers a wide range of possibilities: dedicated facility for LLW or disposal with non-active decommissioning waste Above or below HV-VLLW limits Approach likely to be similar to that for ‘controlled burial’: detailed radiological assessment may be necessary proportionate use of specialist guidance (e.g. GRA) we may impose additional conditions in the authorisation

LLW disposal - consultation Landfill site application for disposal Local authority, HSE, FSA (if relevant) Landfill operator must lead on stakeholder liaison - we are happy to support, explaining our role Nuclear site applications for transfers to landfill or on-site disposals - as per our existing arrangements This will change when EPR introduced in 2010

LLW disposals - expectations We want to see appropriate consideration of non-radioactive properties in disposal decisions For significant disposals, particularly from nuclear sites, we want to see an integrated waste strategy considering management options, proximity principle and climate change issues Specific projects must represent the BPEO

LLW disposals – way forward Interest: Three landfill operators are preparing applications for HV-VLLW or LLW controlled burial First application expected soon Information: Further guidance and FAQs on web pages Application forms and radiological assessment guidance drafted Early engagement with landfill operators being sought - we are advising now on content of applications

LLWR developments Authorisation variations to facilitate treatment and disposal Safety case review

LLW authorisation changes - context Nuclear site authorisations only currently allow transfer of waste to LLWR for the purposes of final disposal NDA National Nuclear LLW Strategy LLWR innovation proposals: Encourage segregation at source and offer waste treatment services Short-term handling of small volumes of packaged waste via LLWR Application to transfer metals to Studsvik Metals Recycling Facility for treatment Studsvik Metals Recycling Facility (MRF) opening this summer HV-VLLW disposal to landfills Presumption to early solutions Proximity principle as a point of reference NDA National LLW Strategy development Preserve LLWR capacity by increased recycling, disposal to appropriately engineered facilities and increased application of the waste management hierarchy

LLW authorisation changes - proposals To authorise all nuclear sites in England and Wales: To transfer metals to the Studsvik Metals Recycling Facility for treatment To transfer metals, combustible LLW and HV-VLLW to LLWR for the purposes of transfer elsewhere for treatment or alternate disposal in more appropriately engineered facilities (e.g. landfill) We are currently consulting on these proposals

LLW authorisation changes - overview Future facilities Metals Recycling Facility, Lillyhall (HV VLLW) (combustible wastes) LLWR New route (metals) Transfers for disposal or onward transfer (metals, HV VLLW, combustible wastes New route for all sites (metals) We want to minimise the number of transfers via the LLWR, we will work with operators and other regulators to achieve this Initially we propose not to allow transfers of combustible LLW or HV-VLLW via the LLWR, until a site specific case is made We will place strict volume limits on any HV-VLLW transfers via the LLWR Should other treatment facilities, offering clear environmental benefits, become available we would consider authorising transfers in a similar manner to that proposed for the Metals Recycling Facility We expect operators to continue to seek the best environmental option for wastes - these proposals in no way preclude other options All Nuclear Sites (England and Wales)

LLW authorisation changes - benefits Support application of the waste management hierarchy Encourages moves to waste segregation Encourage transfers to treatment facilities for recycling Supports self-sufficiency for UK Preserve LLWR capacity Regulatory efficiency Cost savings

LLWR Environmental Safety Case - update

Environmental Safety Case - update Requirement of the LLWR authorisation “Design, operation and closure of the facility must be in accordance with the Environmental Safety Case” Last submitted 2002 Currently safe, but Adequate case for continued disposal (beyond Vault 8) not made Updated Environmental Safety Case being developed for May 2011

Environmental Safety Case - progress Ongoing regulatory dialogue addressing key issues such as coastal erosion, site understanding and performance assessment Considerable progress made since 2002 A number of comments and recommendations remain outstanding Delivery of a fully robust and underpinned Environmental Safety Case, addressing all our recommendations by May 2011 will be challenging, but we consider it to be achievable

Environmental Safety Case - implications LLWR are not authorised for disposal beyond Vault 8 (nearly full). Planning permission has been granted for storage in Vault 9 when constructed. We will not authorise further disposals until a satisfactory Environmental Safety Case is produced and will continue to require an acceptable case to be produced for past disposals. Following review of the 2011 updated Environmental Safety Case we will consider and consult on authorisation of further disposals around 2012/3.

Summary The new LLW Policy offers increased flexibility to the UK nuclear industry We need to ensure public confidence in the delivery of LLW management solutions We have prepared guidance on LLW disposal to landfill and facilities on or adjacent to nuclear sites We are proposing to make some authorisation changes to facilitate application of the waste management hierarchy The Environmental Safety Case for the LLWR due in 2011 has implications for future disposals

Clarification questions?