Project No 2005/LV/16/C/PE/003 Development of water services in Riga, stage III This project helps to reduce economical and social disparities among the.

Slides:



Advertisements
Similar presentations
European Union European Union. European Coal and Steel Community 1952: began with the signing of the Treaty of Paris, establishing the European Coal and.
Advertisements

Operational Programme I – Cohesion Policy Event part-financed by the European Union European Regional Development Fund Evaluation Plan for Maltas.
Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC IWRM in the Sava River Basin – a basis for sustainable development of the region.
Development of Ventspils District Heating System in Latvia 2005/LV/16/C/PE/001.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Cohesion Fund Monitoring Committee Development of District Heating System in Ventspils, Latvia Aivars Jurjāns Director, Project Implementation Department,
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Supervision of the quality of water intended for human consumption by State Sanitary Inspection bodies Małgorzata Kedzierska Environmental Hygiene Dept.
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Indicators achieved in ES Structural Funds activities within the competence of the Ministry of Transport.
STATUS OF CF CO-FUNDED PROJECTS 11 April 2008 AIVARS JURJĀNS Ministry of Environment Head of Projects Implementation Department.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Part-financed by the European Union The new Baltic Sea Region Programme Susanne Scherrer, Director of the Joint Secretariat Rostock/Riga.
The Instrument for Pre-Accession Assistance
Project Implementation Plan and Principal Activities
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
This project is co-financed by the European Union and the Republic of Turkey 1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal.
A new start for the Lisbon Strategy Executive summary Increase and improve investment in Research and Development Facilitate innovation,
Administrative Territorial Reform in Latvia The Ministry of Regional Development and Local Government.
“Remediation of Historically Polluted Areas in Sarkandaugava” Progress from April 2014 till March 2015.
Reformed Partnership and Multi-Level Governance Ana Maria Dobre Political Administrator General Council Secretariat
EU actions on Web- Accessibility Funka Accessibility Days
Modernisation of Signalling System Project No. 2001/LV/16/P/PT/006 EU Monitoring Committee meeting: EC, MoT, MoF, LDz
European Commission –Cabinet of Commissioner Andris Piebalgs EU Energy Efficiency Initiatives Stina Soewarta, European Commission Prague, June 2, 2005.
STEPS FOR FUNDING ELI-NP March 11 st 2011 Dan Cutoiu.
OP Entrepreneurship and Innovations Launching Event in Latvia – 25 September 2007 Ms. Sanda Rieksta EU Funds Managing Authority.
Co-operation within water management sector in Latvia B.Gulbe, CEO, Latvian water and wastewater works association.
WHY IS IT IMPORTANT THAT LOCAL GOVERNMENTS ARE INTERNATIONALLY RECOGNISED IN THE POST-2012 GLOBAL CLIMATE AGREEMENTS The local and regional perspective.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
Public Private Partnership + EU Funds in Poland general overview and the future outlook.
8th Cohesion Fund Monitoring Committee 11 April 2008 Technical Assistance for the Cohesion Fund Management in Latvia No.2005/LV/16/C/PA/001.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
The Essential European Union. First things first… The EU is a Supranational Organization consisting of 28 individual nations. Initially started in 1951.
ХVIII Meeting of the Monitoring Committee of Operational programme “Transport” – 3 June 2015 Pravets.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
SMART SOLUTIONS TECHNOLOGY. Smart Solutions Technology Company Ltd., it is a private company that was founded in 2010 with the main goal in creating.
Sustainable public transport – electric transport development project for the capital.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
JASPERS for CEF Stéphane OUAKI Head Of Unit
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Cohesion Fund Monitoring Committee 11 April 2008.
« Performing Efficient Models of Administration Capacity and Regional Reform in the European Union» European Parliament 15 October 2008 Bruxelles Romanian.
Ministry of Russian Federation of Atomic Energy *** Mining and Chemical Combine Creation of Heat and Power Replacing Source Director General for STC MCC.
Climate Change October Main concepts Climate change – lasting change of some or all characteristics, describing the average weather condition Greenhouse.
The Cohesion Fund in Poland and the Selection System for Environmental Investments Andrzej Guła Institute of Environmental Economics – Poland CEE Bankwatch.
EN Regional Policy EUROPEAN COMMISSION Third progress report on cohesion 17 May 2005 Towards a new partnership for growth, jobs and cohesion.
Eligibility of Administrative Costs in Projects of Structural Funds and Cohesion Fund 1.
Priority Environmental Investment Programme National Workshop Montenegro Priority Water Projects on the PEIP List Budva, 13 th May 2008 Ruslan Zhechkov,
Regional Policy Performance framework review and reserve Jan Marek Ziółkowski Evaluation and European Semester Unit DG for Regional and Urban.
Implementing financial instruments in Slovakia Programming period Martin Polónyi Head of Department for Financial Strategy of Economic Growth.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Marianna Spoialo Head of the Performance Audit Division April 27 th
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
European Union European Fund for Regional Development.
Structural Funds Programming Predeal, Romania
STATE LAW OFFICE AND DEPARTMENT OF JUSTICE
Economic and Monetary Union
Background Legal basis of the TA financing decision: Article 45 of Council Regulation (EC) No. 1083/2006 of 11 July 2006 laying down general provisions.
Supporting Investment in the Mediterranean Region
Luisa PRISTA DG Research and Innovation
Third progress report on cohesion 17 May 2005
Eurostat Task force on victimisation surveys,
COHESION FUND MONITORING COMMITTEE
Ilze Danga Chief Economist of the Budget Division
STATUS OF CF CO-FUNDED PROJECTS
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Presentation transcript:

Project No 2005/LV/16/C/PE/003 Development of water services in Riga, stage III This project helps to reduce economical and social disparities among the citizens of the European Union.

European Commission Decision signed on 21/12/2005 End date of eligible expenditure 31/12/2010 Total eligible expenditure of the project – EUR 69,221, CF funding – EUR 58,838, Absorbed funding ~ 15 % Progress in the project: 4 diesel generators supplied and installed in 2 water pumping stations and 2 sewerage stations. Status of agreements: 6 agreements are signed in the framework of the project (5 for works and 1 for services). In Q it is planned to launch 7 procurements. Implementation of 1 agreement for works is completed. General information

Components to be implemented from project funding 1.Replacement of strategic water supply system valves and creation of water consumption registration zoning 2.Reconstruction of steel pipelines of the water supply 3.Reconstruction of steel pipelines of the strategic water mains 4.Construction of sewage collector on Hanzas Street from KSS 1 to Eksporta Street 5.Construction of sewage collector on Lielirbes / Kalnciema Streets from Dreiliņu Street to K.Ulmaņa gatve 6.Separation of sewerage systems in Teika-Čiekurkalns – reconstruction of "Sirius" rainwater sewage collector 7.Separation of sewerage systems in Teika-Čiekurkalns – construction of industrial sewerage 8.4 diesel generators supplied and installed in 2 water supply pumping stations and 2 sewerage pumping stations 9.Reconstruction of non-pumped flow sewerage ceramic pipes 10.Reconstruction of reinforced concrete sewerage pipelines 11.Expanding water supply and sewerage systems in Šampēteris 12.Expanding water supply and sewerage systems in Dārzciems 13. Technical supervision of agreements on works

Key problems and risks 1.Potential delays in the approved project timeframe:  Reconstruction of reinforced concrete water mains,  Expanding water supply and sewerage systems in Šampēteris,  Separation of sewerage systems in Teika-Čiekurkalns – reconstruction of "Sirius" rainwater sewage collector. 2.Potential solution – extend the deadline for completion of works to 1 June 2010

Timeframe

Increase in cost in the project (price increase) as on 10/04/ /200512/2006 Supply planHYDER evaluation 1Replacement of strategic water supply system valves and creation of water consumption registration zoning 2,189,7653,442,094▲ 2Reconstruction of steel pipelines of the water supply4,749,7445,392,507▲ 3Reconstruction of steel pipelines of the strategic water mains 11,609,37313,223,117▲ 4Construction of sewage collector on Hanzas Street from KSS 1 to Eksporta Street 1,483,8992,389,319▲ 5Construction of sewage collector on Lielirbes / Kalnciema Str.from Dreiliņu Street to K.Ulmaņa gatve 2,099,6805,090,041▲ 6Separation of sewerage systems in Teika-Čiekurkalns – reconstruction of "Sirius" rainwater sewage collector 3,170,8722,821,529▼ 7Separation of sewerage systems in Teika-Čiekurkalns – construction of industrial sewerage 5,150,9891,322,747▼ 84 diesel generators supplied and installed in 2 water supply pumping stations and 2 sewerage pumping stations 867,563962,229▲ 9Reconstruction of non-pumped flow sewerage ceramic pipes 7,322,5836,049,728▼ 10Reconstruction of reinforced concrete sewerage pipelines 6,556,0217,708,299▲ 11Expanding water supply and sewerage systems in Šampēteris 11,149,96211,716,109▲ 12Expanding water supply and sewerage systems in Dārzciems 8,927,8787,545,394▲ 13Technical supervision of agreements on works3,943,3793,681,120▼ 69,221,70671,705,261 +3,4% 10/04/2008+/- Agreements% 7,460,985+57% 14,382, % 3,083, % 6,407,737305% 989,044+14% 13,984,383*+25% 11,622,276*+30% 3,681,120- 7% ,4%

Solutions to increase in costs Upon review of the informative report on increase in costs in EU Cohesion Fund projects the Cabinet of Ministers on 12/02/2008 supported covering the increase in costs of the project “Development of water services in Riga, stage III” in the amount of 30% (EUR 3,117,106.05) SIA “Rīgas ūdens” in cooperation with Riga City Council has supported covering of the remaining 70% of the increase in costs