F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.

Slides:



Advertisements
Similar presentations
TECHNICAL TRAINING Mini Chiller Panel Controller V2.0.
Advertisements

Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Condenser supply contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
JE / RA 29/1/021 RAL Evaporative Cooling UK-V Meeting, RAL Wednesday 30th January Julia Easton Talk given by Richard Apsimon.
Detector Cooling Project Thermosiphon Project Status Report
MISSION CRITICAL COLOCATION 360 Technology Center Solutions.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Flooded Screw Chiller FWSF Electronic Expansion Valve Condenser Evaporator Control box compressor Flooded Screw Chiller - FWSF.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
Page 1J. Hourtoule, Electricity contract: scope and forecasted consumption, 16/07/2015 © ITER Organization Electricity Supply Contract: For the ITER Site.
Missionary Electrification in the Philippines
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
Learning, our way Daikin Europe, Consulting sales section1 Understanding Client’s Needs and best Daikin solution.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Potential of electrical trailer cooling during rest periods Analysis of emission and costs.
Michele Battistin Elena Perez Rodriguez 10 November 2010
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
Demineralised water cooling system
IBBelle: Status & Plans
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
He Plant, LN2 Systems and Commissioing
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
the high-voltage network of CERN ToMORROW
Olof Bärring LCG-LHCC Review, 22nd September 2008
CRYOGENICS OPERATIONS 2008 Organized by CERN
ATLAS Thermosiphon Electrical Distribution and Run Modes
Overview on Renewable energy in Bulgaria
EN-CV: P8 systems and Detector Cooling
Low temperature chiller Market Survey
Preventative Maintenance & Service
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Maintenance at ALBA facility: Strategy for the conventional services
ESR2 Process Cycle Design
ESR2 Process Cycle Design
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011

Outline Technical Specifications Invitation to Tender Chiller Configuration – P&ID – Required services Construction Time Schedule 20 October, 2011Thermosyphon cooling workshop §52

Overview of Technical Specifications Two stage Chiller with a cooling capacity of -70°C. Able to run from 20% to 100% of all temperatures set points (from 20 to -70°C). Two Operation regimes: – Normal Operation: -70°C; – Warm Operation: -20°C; Runs with 1 st Stage only (R404a). Air cooled Condenser (independent of cooling water availability). 1 st Stage connected to Diesel Power network. 20 October, 2011Thermosyphon cooling workshop §53

Invitation to Tender Market Survey (x64 companies contacted): – 6x companies were qualified: Angelantoni (it); Cofely Refrigeration (de); GEA Matal / Technofrigo (fr); Johnson Controls (ch); J&E Hall (uk); Telstar (es). Invitation to Tender: – 4x Offers received: Johnson Controls Angelantoni J&E Hall Telstar Best offer from J&E Hall 20 October, 2011Thermosyphon cooling workshop §54

Chiller Configuration Original required configurations: – Configuration A: Three redundant chillers each with a capacity of 50% of total power. – Configuration B: One chiller 100% power chiller with redundant compressors + 2 low power chillers (one of them air cooled). Final configuration by J&E Hall: – Two full power chillers (one with air cooled condenser for warm operation). – The two full power chillers cost half the price of any of the original required configurations. – One chiller has been ordered. The second (redundant) chiller is planned to be ordered in a later stage of the project. 20 October, 2011Thermosyphon cooling workshop §55

Chiller Configuration 20 October, 2011Thermosyphon cooling workshop §56

Chiller Configuration P&ID EDMS October, 2011Thermosyphon cooling workshop §57 1 st Stage R404a Compressor 1 st Stage R404a Compressor 2nd Stage R23 Compressor 2nd Stage R23 Compressor Water cooled Condenser Air cooled Condenser Warm Operation Brine HX Normal Operation Brine HX

Chiller Required Services Normal Operation -70°C): – Water consumption: 101.4m 3 /h – Electrical Power consumption (absorbed Power): 314.4kW – Pneumatic air supply (6bar) Warm Operation -20°C) – Water consumption: Not required – Electrical Power consumption (absorbed Power): 75.2kW (on Diesel) – Pneumatic Air supply (6bar) 20 October, 2011Thermosyphon cooling workshop §58

Chiller N1 Construction Time Schedule Payment plan (total cost = 591,240 CHF): – Contract started: 10% – Design phase completed 20% – Construction of the Chiller 30% – Delivery and Installation at CERN 30% – Commissioning at CERN 10% Time Schedule: – Contract started: 10% Completed (September 2011) – Design phase completed 20% Completed (October 2011) – Construction of the Chiller 30% On going (December 2011) – Delivery and Installation at CERN 30% Planned to January 2012 – Commissioning at CERN 10% Planned to May-June October, 2011Thermosyphon cooling workshop §59

Any questions? 20 October, 2011Thermosyphon cooling workshop §510