Damping Rings James Jones ASTeC, Daresbury Laboratory.

Slides:



Advertisements
Similar presentations
Using the real lattice and an improved model for the wake field, the extraction jitter can now be calculated more accurately. Assuming an injection jitter.
Advertisements

LC-ABD2 Work Package 2: Damping Rings Andy Wolski University of Liverpool and the Cockcroft Institute 12 April 2007.
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
BILCW07 - Feb 2007 Global Design Effort 1 RDB S3: Damping Rings R&D Junji Urakawa for Andrzej Wolski (Cockcroft Institute), Susanna Guiducci (INFN-LNF),
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Summary of the two-stream instability session G. Rumolo, R. Cimino Based on input from the presentations of G. Iadarola, H. Bartosik, R. Nagaoka, N. Wang,
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
SLAC ILC Accelerator: Luminosity Production Peter Tenenbaum HEP Program Review June 15, 2005.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Towards a Coordinated R&D Plan for ILC Damping Rings Impedance Issues Andy Wolski University of Liverpool and the Cockcroft Institute 28 September, 2006.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
ALCW at SLAC, January 7, 2004J. Rogers, A Damping Ring Primer1 A Damping Ring Primer J. Rogers Cornell University Linear collider emittance requirements.
Fast Ion Instability Studies in ILC Damping Ring Guoxing Xia DESY ILCDR07 meeting, Frascati, Mar. 5~7, 2007.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
ILC damping ring options and their critical issues 12th July th ACFA MDI/POL/ACC Pohang Accelerator Lab. Eun-San Kim.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
ILC Damping Rings Mini-Workshop, KEK, Dec 18-20, 2007 Status and Plans for Impedance Calculations of the ILC Damping Rings Cho Ng Advanced Computations.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
September 17-21, 2007Workshop on ILC Interaction Region Engineering Design, SLAC IR Vacuum Systems first thoughts Oleg Malyshev ASTeC, STFC Daresbury Laboratory.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
Ion effects in low emittance rings Giovanni Rumolo Thanks to R. Nagaoka, A. Oeftiger In CLIC Workshop 3-8 February, 2014, CERN.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
ILC Damping Rings: Configuration Status and R&D Plans Andy Wolski Lawrence Berkeley National Laboratory January 19, 2006.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
1 R&D Plans for Impedance Driven Single-Bunch Instabilities (WBS 2.2.1) M. Venturini ( presented by M. Zisman) LBNL LCWS07 DESY, Hamburg May 30 - June.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Two-beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
Two beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
Vacuum Problems in the ILC Damping Ring
Status of Fast Ion Instability Studies
CLIC Damping ring beam transfer systems
Collective effects in CEPC
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
CesrTA Experimental Schedule and Priorities
ILC Damping Ring electron cloud WG effort
CLIC damping rings working plan towards the CDR
Status of CTC activities for the Damping rings
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

Damping Rings James Jones ASTeC, Daresbury Laboratory

Personnel ASTeC Oleg Malyshev – Vacuum Studies James Jones – Low emittance tuning studies + Engineering Support Liverpool University Andy Wolski – Low emittance tuning, Vacuum Design 1 RA currently employed looking partially at impedance effects RA – Vacuum Design (LC-ABD 2) RA – Vacuum Design (LC-ABD 2) Larisa Malysheva – Polarisation issues (As part of a wider collaboration)

Damping Rings must provide very high quality, very stable beams ILC DRPEP II LERHERA eSPring-8 Energy5 GeV3.5 GeV27.5 GeV8 GeV Circumference6694 m2199 m6360 m1435 m Average current400 mA2450 mA58 mA100 mA Number of bunches2767 – Particles per bunch2×10 10 – 1× × × ×10 10 Extracted bunch length (rms)6 mm12 mm9 mm6 mm Horizontal normalised emittance8 μm200 μm1000 μm90 μm Vertical normalised emittance0.02 μm10 μm180 μm0.09 – 0.27 μm DR Damping ring parameters are very demanding in terms of beam stability: No operating machine meets all the parameters simultaneously.

Previous Work ASTeC was, and is, committed to damping ring work as part of the EUROTeV framework: Both O. Malyshev and J. Jones have small but significant work packages within this framework EUROTeV WP 3 Task 2 deals with electron cloud issues within the positron damping ring, and mitigation schemes. O. Malyshev was a major contributor to vacuum simulations for this task. EUROTeV WP 3 Task 3 deals with low emittance tuning simulations for the damping rings. The work is coordinated by J. Jones.

Vacuum Simulations Complete simulations of damping ring vacuum systems, including both the dipole induced photo desorption, along with analysis of pump location and speeds Conventional vacuum technology does not allow to reach required vacuum after 100 Ah conditioning NEG coated chamber provides cheapest and simplest vacuum solution for dumping ring: less number of pumps less pumping speed required lower bakeout/activation temperature (180C in stead of C) low SEY to suppress e-cloud effect

Low Emittance Tuning Have a large scale emittance tuning simulation environment for the RDR damping rings. Includes full orbit, dispersion and coupling correction. Models the effects of ATL-like ground motion on the time evolution of the output emittances. None CO Full Initial Correction Only Full Correction every 6 Days

Major issues for beam stability Electron cloud effects in the positron damping rings One of the top priorities for damping rings R&D: already receiving major attention from groups around the world. Ion effects in the electron damping rings Still some uncertainty in likely impact on damping rings performance. Can probably be mitigated with feedback systems and a well-designed vacuum system. Impedance-driven beam instabilities Wide experience from operating facilities; we expect the damping rings to operate in a challenging regime. Long-range wake fields can drive multibunch instabilities, and couple jitter from freshly-injected bunches to damped bunches awaiting extraction. Short-range wake fields can drive single-bunch instabilities, which can appear as emittance increase, or a bursting type of instability. These effects require careful study, with beam dynamics models closely connected to the technical design of the vacuum system.

Using a time-domain simulation code, we studied the coupling of injection jitter to damped bunches in the NLC damping rings. Task 2.1 Goal 1 Evaluate the effects of beam loading, injection/extraction transients and long- range wake fields in the damping rings under a range of operational conditions. t = 0 mst = 10 ms Similar (or stronger) effects are expected in ILC. Studies must include a detailed impedance model (resistive wall and HOMs), lattice model, radiation damping and feedback system. Our present code does include these effects: alternatives may be available (e.g. MULTI-TRISIM).

Task 2.1 Goal 2 Single-bunch instabilities are diverse and complicated. There is a lot of operational experience of these effects, but a good understanding for any given machine generally requires a lot of hard, detailed work. Single-bunch instabilities were a major problem for the SLC damping rings: eventually, the vacuum chamber had to be rebuilt. Evaluate impedance-driven instability thresholds and growth rates. Single-bunch instability in the SLC damping rings. Left: Experimental observation (B. Podobedov, BNL). Right: Simulation (K. Oide, KEK). We shall collaborate with LBNL and SLAC in the construction of impedance models (using technical designs of the vacuum chamber, to be performed in Task 2.2) and the evaluation of the resulting instabilities.

Task 2.1 Goal 3 Lowest achieved vertical emittance (after significant effort) is 4.5 pm in KEK-ATF. The ILC specification is for 2 pm. Develop techniques for low-emittance tuning. Several techniques (orbit/dispersion/coupling correction; orbit response matrix analysis…) work well in simulation, but practical implementation with the necessary accuracy and precision is still extremely challenging. We need to demonstrate a technique that can be routinely applied to a (6 km) ring to achieve vertical emittance of 2 pm on a regular basis. Emittance-tuning using ORM analysis in the KEK-ATF.

Task 2.1 Goal 3 The main facilities used so far for experimental studies of low-emittance tuning have been the KEK-ATF and the LBNL-ALS. The ATF will continue to be available. The main limitation so far has been the availability of personnel. Producing a high-quality beam from the storage ring will be essential for ATF2. Beam time at the ALS is generally available at monthly intervals. The main limitation tends to be the availability of staff to run the experimental studies. There are presently two serious proposals for future damping rings test facilities: CESR-tf could start operations for damping rings studies as early as June HERA-DR could start operations in late In both proposals, low-emittance tuning would be an important part of the programme. Further opportunities are provided by other machines. Light sources, e.g. DIAMOND. KEK-B (proposed damping rings study programme starting in 2009, to include low- emittance tuning). Develop techniques for low-emittance tuning.

Task 2.2 Goal 1 Calculate the average pressure and pressure profile in the damping rings and, in the context of the results of these calculations, evaluate the technology options for the damping rings. Initial evaluations have been performed, as part of the EUROTeV programme, and have indicated the benefits of NEG-coated vacuum chamber. Detailed studies are now needed to evaluate the benefits of NEG-coating, and to produce technical specification for the vacuum system (apertures; antechambers; material and coating; pumping locations; pumping speeds etc.) Vacuum studies must be well-integrated into studies of electron cloud and ion effects. Calculation of the pressure in a section of the ILC damping rings in two different scenarios for the vacuum system, as a function of the spacing between the pumps. Left: Stainless steel tube. Right: NEG-coated tube. (O. Malyshev, ASTeC)

Task 2.2 Goal 2 Determine conditioning rates for NEG coatings under various conditions. We know that: the initial pressure in a NEG coated vacuum chamber activated at 180 C is better by two orders of magnitude than that in a stainless steel vacuum chamber baked in-situ to 300 C; NEG outgassing rates reduce with accumulated photon dose. Data from the ESRF show that this reduction could be up to 2 orders of magnitude; NEG coating simplifies and reduces the cost of the pumping system, and works to mitigate multipacting. In other words, we know that NEG coating is worth using. For the design of the vacuum system, we need to know the photon and electron-stimulated desorption yields: as functions of photon or electron dose, up to very large doses; as functions of photon or electron energy; as functions of NEG activation temperature (from room temperature up to 250 C); after air vent to different pressures (from mbar to atmosphere), to determine whether recovery after an accident requires reactivation. As a result of the experimental studies: we will be able to produce (for the TDR) a vacuum system design optimised for performance and cost, including spacing and required pumping speeds of the lumped pumps; we will gain invaluable experience in the use of NEG coatings under a wide range of conditions.

Task 2.2 Goal 3 Produce technical designs for components in the vacuum chamber in the arcs and straights, and use these designs for developing an impedance model. Technical designs of components in the vacuum chamber are essential for constructing an impedance model. Need to include bellows, flanges, tapers, pumping ports, BPMs, antechambers, kickers and septa… Close collaboration with other technical groups (e.g. instrumentation) is essential. Producing a complete, detailed model is a significant amount of work, but is essential for a reliable evaluation of the impact of collective effects. Calculation of trapped modes in PEP II bellows. Higher-order mode heating is a significant problem for PEP II, and a potential problem for the ILC damping rings. (Cho Ng, SLAC). We will collaborate with LBNL on the technical design, and with SLAC on the impedance modelling.

Task 2.2 Goal 3 The goal of producing a detailed impedance model for the TDR, based on technical designs of the important components, is ambitious. The Damping Rings Workshop at Cornell, September, outlined a staged plan, with specified milestones towards the goal of a complete evaluation of the impedance-driven collective effects. Begin with constructing an impedance model based on scaling components from existing facilities, in parallel with the technical design of the damping rings vacuum. Proceed iteratively to improve the model, using the results of the scaled impedance model to guide the design work, so as to achieve a specified impedance budget. Our proposed work on the vacuum system fits extremely well with the timescales and methodologies. If the hoped-for contributions from other labs (LBNL and SLAC) are not provided, we still make an essential contribution towards a reliable impedance model. Produce technical designs for components in the vacuum chamber in the arcs and straights, and use these designs for developing an impedance model.

Final Words The damping ring work proposed addresses two critical and related issues for the ILC damping rings: Dynamical effects that potentially limit beam quality and stability. Vacuum system specification and design. We will make a leading contribution to the ILC in these areas. The work we are proposing will produce results needed for the TDR on an appropriate timescale. We will collaborate with identified international partners to maximise the benefit of the resources that are available. Vacuum studies have the potential for industrial involvement, and a major contribution (> 13 km of vacuum system) during construction. The tasks are closely connected to other work packages within Cockcroft, for example: Effects of linac wakefields depend on beam stability from damping rings Instrumentation and feedback essential for maintaining stability