Managing Environmental Aspects An Integrated FMEA Approach.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Risk Management an Element of Loss Control
Job Hazard Analysis I. Speaker’s Notes:
TUR Planner Course Session 1 Introduction to Toxics Use Reduction and the Toxics Use Reduction Act.
Risk Management Introduction Risk Management Fundamentals
Objectives Terminal Objective
Job Hazard Analysis. © Business & Legal Reports, Inc Session Objectives Identify the purpose of JHA Recognize the benefits of JHA Understand the.
Action 1: Mission/task analysis Action 2: List Hazards Action 3: List Causes STEP 1 IDENTIFY THE HAZARD STEP 2 ASSESS THE RISK Action 1: Assess hazard.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
GENERAL IDEAS IN AIR POLLUTION CONTROL
SRC/OAS Project Environmental Performance Presenter: Julia Louise Brown.
NRMCA Green Star Certification
ECONOMIC EVALUATION OF POLLUTION PREVENTION PROJECTS CHAPTER 11.
Fermilab Environmental Management System (EMS)
ISO EMS CONTRACTOR OVERVIEW May /26/10ISO EMS CONTRACTOR OVERVIEW TRAINING ISO EMS OVERVIEW TRAINING Contents What is ISO
Introduction to Pollution Prevention
Developing a Chemical Risk Management Program
Hazard Identification and Control Courtesy of the Public Education and Conferences Section Oregon Occupational Safety and Health Division (OR-OSHA)
Environmental Awareness
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Aspects, Impacts, and Significant Aspects
Copyright The Solution Foundry. All rights reserved. WELCOME TO ENVIRONMENTAL ASPECTS 101.
The most precious commodity in your organisation?
W504 - Management of asbestos containing materials.
PHILOSOPHY OF ACCIDENT PREVENTION
INTRODUCTION. Department Policy The Department of Environmental Protection recognizes that it has the obligation to provide for the health and safety.
Risk Analysis for Engineering Design J. M. McCarthy Fall 2003 Definitions Hazard Analysis Hazard Analysis Report Example for Mini Baja Nationally Recognized.
Hazard Analysis/Prevention and Safety Management
Ship Recycling Facility Management System IMO Guideline A.962
Business Crisis and Continuity Management (BCCM) Class Session
Basics of OHSAS Occupational Health & Safety Management System
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
DESIGNING FOR SAFETY CHAPTER 9. IMPORTANCE OF DESIGNING FOR SAFETY  In the near future, the level of safety that companies and industries achieve will.
OPERATIONAL RISK MANAGEMENT
Liability Issues for TRIO Programs Managing Your Project’s Risk.
Risk Benefit Risk Management SSG MACK.
September 2002 (Version 1) CIWMD Training and Risk Assessment.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY.
Division of Risk Management State of Florida Loss Prevention Program.
Environmental Management System (EMS) Development For Pork Producers September 13, 2001 Barb Satler Pork EMS Project Coordinator NC Division of Pollution.
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
Environmental and social management accounting Lecturer : yvonne Jan 21 st 2014.
EMS Fenceline Factors that will define the scope of each NAA location’s EMS –Physical size of your location –Research mission of your facility –Self-supporting.
National Corporate Training Pty Ltd0. Topics Follow safe work practices Maintain personal safety standards Assess risks Follow emergency procedures National.
Quality Assurance and Risk Management Services, Inc. 
CATASTROPHIC (I) Loss of ability to accomplish the mission or mission failure. Death or permanent total disability (accident risk). Loss of major or mission-critical.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
JOB HAZARD ANALYSIS “THE TOOL” Presented by: A. Quentin Baker Director of Safety, City of Burlington.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
EFFECTIVE ACCIDENT/INCIDENT INVESTIGATION 15 FEBRUARY 2013 PHILIPPINE ASSOCIATION OF SAFETY ENGINEERS -QATAR- -QATAR- COMMITTEE ON SAFETY EDUCATION 2013.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
OTF Business Information Standards and Integration for Sustainability Gahl Berkooz Richard Riff.
Train When it Rains: Risk Assessment. What is Risk Assessment? Risk assessment is the process of recognizing possible harm from exposures which could.
Ranjan kumar Assistant Manager CCL,Ranchi
ESSA Grading Criteria Can the finding lead to a mishap?* No
SYSTEM SAFETY AND THE TECHNICAL AUTHOR
Civil Air Patrol BASIC LEVEL OPERATIONAL RISK MANAGEMENT
Air Carrier Continuing Analysis and Surveillance System (CASS)
Environmental Health and Safety (EH&S) Supplier Awareness Training
ISO 14001:2015 Identifying Aspects And Impacts
ISO 14001:2004 Aspects And Impacts
Unit I Module 3 - RCM Terminology and Concepts
SELDOM (D) Remotely possible; could occur at some time
Presentation transcript:

Managing Environmental Aspects An Integrated FMEA Approach

Why do we Assess Risk? It’s our job Ensure compliance Protect our assets Balance our concerns Drive improvement

Why Integrate? Incorporate risk as part of “big picture” Common tools provide for: – Decreased Training Needs – Increased Skill – Improved Interaction More Eyes = More Opportunities for Improvement

When we don’t integrate… Conflicting information in different areas We risk focusing on trees instead of the forest We may initiate projects with conflicting goals We may find ourselves competing for vital resources

Goals for this Session: Identify potential environmental impacts using a process approach Analyze environmental risks in light of multiple business objectives Define appropriate control measures Formulate strategic improvement projects

Borrowing from the Quality Toolbox “Go with the flow”- process flow diagrams Find the flaws - FMEA Create a game plan - SOPs, etc. Summarize Controls - Control Plan Reduce Risk - CI Process …Review & Repeat!

Process Flow Diagrams What do we have? (inputs) Where/Why? (process) What’s left? (outputs, waste) How do we control? Who do we train? How can we reduce?

Assess the Risk - FMEA Lay out the process steps Identify hazards and effects for each action Assess the risk = Severity / Probability Summarize Controls Prioritize Actions - the power of FMEA

Karen’s Kwik Lube Welcome to the Kwik Lube Krew! Your job today will be to: – Map the Kwik Lube process – Identify potential environmental impacts – Assess their various risks – Draft a game plan for improvement Let’s Begin…

Process Map - Reminders All inputs captured (information, materials, tools, equipment) All steps clear All outputs captured (final product, information, wastes) The cross-functional model

Identifying Hazards/Aspects Aspects can include any solid, liquid or gas added to, used in, created by, or left over as the result of a process that has the potential to impact the environment Aspects must include elements that may not be under our direct control, but over which we can be expected to have an influence (e.g., work of contractors, etc.). Consider plans for process changes and improvements

Identifying Effects/Impacts Impacts May Include: emissions to air releases to water or land use of raw materials or natural resources use/emission of energy creation of waste Safety would include motion, energy, chemicals, etc.

Severity ScoreEffect Severity – Environmental Impact 10 CatastrophicIrreparable damage to environment or living beings 9 CriticalSpill, release, incident resulting in major remedy costs, fines, prison 7 SignificantSpill, release, or incident resulting in moderate remedy costs and/or potential fines 5 MarginalSpill, release, or incident resulting in minor remedy costs, no penalties 3 MinorEnvironmental impact not regulated / no potential to exceed requirements 1 PositiveProvides net environmental benefit

Severity - Other Elements ScoreEffect Severity – PersonnelSeverity – Property 10 CatastrophicMultiple DeathsCatastrophic damage to equipment 9 CriticalDeathMajor damage to equipment / Significant delay 7 SignificantMajor injury, disabling illness Minor damage to equipment / Significant delay 5 MarginalLost time injury or illness Equipment damage unlikely / Minor delay 3 MinorMinor Injury, First Aid, Near Miss Equipment damage improbable 1 PositivePromotes / improves health None

Severity - Other Elements ScoreEffect Severity – Resource Consumption/Waste Generation Severity – Public Concerns 10 Catastrophic Destruction of resources or uncontrolled release of hazardous waste resulting in irreparable damage Regulatory intervention, shut-down of operations 9 Critical Endangerment of resources or uncontrolled release of hazardous waste repairable over a number of years Permanent public disfavor / disruption to operations 7 Significant Resource consumption exceeds industry standards. Waste streams of excessive quantity and/or hazardous nature. Public protest / disruption to plant operations 5 Marginal Resource consumption at or below industry standards. Waste reduction / lean efforts have minimized waste streams. Public disfavor 3 Minor Resource consumption at or below industry standards. Waste streams are recycled or reused. Public concern (local) 1 Positive Provides resource recoveryImproves Public Perception

Probability RankingEffectProbability 10Frequent Occurrence almost certain in exposure interval 9Probable Quite likely to occur in exposure interval 7Occasional May occur in exposure interval 5Remote Not likely to occur in exposure interval 3Improbable So unlikely it can be assumed occurrence may not be expected 1Impossible Redundant/fail-safe engineering controls in place

Risk = S x P Probability SEVERITYSEVERITY High 9 7 Med 5 3 Low 1

Controls Controlling Conditions – Engineering Controls – Pre-treatment Systems – Housekeeping Controlling Behavior – Controlled Practices (SOPs, Work Instructions) – Training & Communication – Behavior Modification

Control RankingEffectControl 10 Almost Impossible Control is non-existent, non-functioning, or impossible to achieve 9 Slight Control is subject to human error or misuse, no supervision provided. Includes general awareness training. 7 Low Control is subject to human error or misuse; activity is supervised. Includes general awareness training. 5 Medium Engineering controls isolate risk during proper use (e.g., guarding), no verification measures in place. 3 High Engineering controls isolate risk during proper use (e.g., guarding), verification measures in place. 1 Almost Certain Interlocks or other measures prevent the bodily contact with hazard at all time.

RPN Risk Prioritization Number S x P x C – Multiplication helps stratify hazards Relative Measure of Risk - relies on: – Well-defined criteria – Consistent Application

Determining Significance Define the criteria – Severity – Risk Avoid “lines in the sand” Continual improvement should drive change

How can we improve? Focus on THE PROCESS – Modify process to change or eliminate step – Reduce Severity – Reduce Probability – Institute or Improve Control Use ALL the tools - P2, Lean, 6-sigma, 5-S Ideas??

Integration Cross-functional Approach Adding Safety Adding Quality – Process versus Product Continual Improvement Programs

Questions??