1 Modeling Needs and Considerations for Energy Efficiency Ex Ante and Ex Post Savings Estimates Workshop: Energy Modeling Tools and their Applications.

Slides:



Advertisements
Similar presentations
2010 HPRCT Presentation – Optimized Human Error Evaluation June 23 rd, 2010 Presenter: Terry J. Herrmann, P.E. Associate, Structural Integrity Associates.
Advertisements

SSC-NM0053 Determination of Greenhouse Gas Emissions Reductions Based on Whole- Building Simulation of Building Mitigation Efforts Using eQUEST/DOE-2.2.
Using computer simulations to assess energy and carbon reductions in building CDM projects Joe Huang March 14, 2011.
Software Analysis Tools
Design of Experiments Lecture I
DOE-2 Overview and Basic Concepts. Background  US public domain programs from 1970s Post Office program; NECAP (NASA energy- cost analysis program);
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
Lectra Manufacturing Expertise Optimize the use of material.
SMARTe: Improving Revitalization Decisions Sustainable Management Approaches and Revitalization Tools – electronic (SMARTe) Leipzig Baldwinsville, NY.
University of Liège Faculty of Applied Sciences Thermodynamics Laboratory Workshop “Commissioning and Auditing of Buildings and HVAC Systems” Use of a.
Pathway to Net-Zero Energy Commercial Buildings Gregory B. Stark, P.E. National Renewable Energy Laboratory UNL Net-Zero Energy Workshop.
Program Overview Alan Shedd, Touchstone Energy 9/28/10.
The Saga Continues: Measure Interactions for Residential HVAC and Wx measures Regional Technical Forum April 23, 2014.
+ Impact Evaluations and Measurement and Verification First we will focus on ‘Gross Savings’ Determination - savings determined irrespective of why 1 Kentucky.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Building Technologies Program. FLEXLAB Background LBNL responded to a 2009 RFP for ARRA funds to develop a facility that: o Develops new test methods.
Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
Lecture 7: Building Modeling Questions Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to the National.
Energy Calculations Dr. Sam C M Hui
Principle of Functional Verification Chapter 1~3 Presenter : Fu-Ching Yang.
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
What is Project Cost Management?
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
This document is proprietary to Project Consulting Group, Inc. and contains confidential information which is solely the property of Project Consulting.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
An Approach to Adjust ERCOT’s Long-Term Load Forecast for Utility Energy Efficiency Programs Jay Zarnikau Frontier Associates LLC June 10, 2013.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
EER Analysis Results Regional Technical Forum March 18, 2014.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Phoenix Convention Center Phoenix, Arizona Building Performance Using DOE’s Energy Modeling Tools For Retrofit Planning Using DOE’s Energy Modeling Ecosystem.
PAGE 1 Sustainable Buildings 2030 © 2008 THE WEIDT GROUP Building Energy Benchmarks THE WEIDT GROUP.
Deemed Savings Methodologies Reid Hart, PE Associate Director, Technical Research July 2009 – Regional Technical Forum.
Variable Speed Heat Pumps Provisional UES Proposal Presentation to the Regional Technical Forum September 18, 2012 Presentation by Kacie Bedney, Bonneville.
Today’s Lecture Covers
Building Simulation Model In this lecture, we are interested in whether a simulation model is accurate representation of the real system. We are interested.
PJM©2015 Updates to PJM Load Forecast Model OPSI Annual Meeting October 12, 2015 Tom Falin Manager – Resource Planning
Selective Overview of R&D to Improve Energy Simulation Philip Haves LBNL CPUC Workshop: Energy Modeling Tools and their Applications in Energy Efficiency.
Sustainable Laboratory Design: Challenges and Solutions
HDM-4 Calibration Henry Kerali Lead Transport Specialist The World Bank.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 7: Lighting and daylighting.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Working Towards Better Savings Estimates for HVAC and Weatherization Measures Regional Technical Forum September 16, 2014.
Demand Forecast Deviations Working Group Presented to: Stakeholder Advisory Committee Presented by: Pat Doran January 24, 2007.
ALEJANDRA MEJIA JULY 2, 2015 Commission Guidance on DEER and Ex Ante Development.
RTF New Homes Subcommittee February 11, 2016 Next Step Homes Update.
1 Summary of Reviews: Workpapers Approved by the California Technical Forum Part 2 Meeting: California Technical Forum January 28, 2016 Jeff Hirsch/Kevin.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
5 September 2002AIAA STC Meeting, Santa Fe, NM1 Verification and Validation for Computational Solid Mechanics Presentation to AIAA Structures Technical.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Mohit Singh-Chhabra, Josh Rushton RTF Presentation March 15, 2016 New Homes Standard Protocol Update.
1 How good are building simulation models? Comparing simulated and actual building energy consumption at the circuit level Brock Glasgo, PhD Student Engineering.
Formation of a Market Analysis Subcommittee Charlie Grist and Jennifer Light RTF Policy Advisory Committee February 19, 2016.
TGDC Meeting, Jan 2011 VVSG 2.0 and Beyond: Usability and Accessibility Issues, Gaps, and Performance Tests Sharon Laskowski, PhD National Institute of.
Agenda » General Methodology » Approaches to Key Issues
Project Cost Management
EPA04 T3.2 Reduced order models for Building Interzonal Transport
Considerations for Optimal Monitoring Program Design
Constructive Cost Model
Fix it or Forget it? Dealing with Troubled Projects
What is Project Cost Management?
Usability of In Situ Generated PDFs for Post Hoc Analysis
Software Analysis Tools
Presentation transcript:

1 Modeling Needs and Considerations for Energy Efficiency Ex Ante and Ex Post Savings Estimates Workshop: Energy Modeling Tools and their Applications in Energy Efficiency September 18, 2015 Jeff Hirsch Consultant - CPUC Ex Ante Team September 18, 2015

Is Building Simulation Needed? Yes, sometimes – It can assist in obtaining estimates When whole building/environment interactions are important  Weather variations, HVAC and other component interactions When detailed component variations are of interest  Insufficient lab or field data is available to directly estimate performance variation 2

Is Building Simulation Needed? No, sometimes – It can get in the way When interactions can be “added” with “sufficient” accuracy When “sufficient” monitoring data (lab and/or field) is available to characterize performance in a separate model (simplified or complex) When component level “what if” variations are not needed or the data isn’t available to support the estimates 2

Considerations for Building Modeling Prototypes of typical buildings or site specific models Significant data requirements for envelope, lighting and plug loads, HVAC, process, controls and operation, weather Calibration data – whole building, enduse for sufficient period(s) to capture full variation of annual use Time and money, expertise 3

Considerations for Building Modeling Modeling tool choice Similar accuracy and reliability of components being examined and the interacting components that significantly impact comparative energy use Details of components being studied are modeled accurately, the inputs allow complete description of technology variations and outputs allow verification of calibration Debugging and updating of tool is possible and timely; expertise is available Effort level and cost for full project is manageable 5

Biggest Challenges Looking Forward Availability of sufficient calibration data –Understanding of variability of performance –May require both laboratory and field work –Can take a lot of time and money Development of new component models –Identifying measures of interest and requirements for model capabilities –Facilitating “production use” by wider community 6