The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.

Slides:



Advertisements
Similar presentations
The Front End Test Stand Collaboration ELECTROMAGNETIC DESIGN OF A RFQ FOR THE FRONT END TEST STAND AT RAL A. Kurup, A. Letchford The RAL front end test.
Advertisements

Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
Front end test stand — WP2
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
MEBT Design Considerations The beam energy in the MEBT is sufficiently low for the space charge forces to have a considerable impact on the beam dynamics.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.
ISIS Accelerator Division
The RAL Front End Test Stand David Findlay ISIS Accelerator Division Rutherford Appleton Laboratory Oxfordshire, UK STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Proposal for the continuation of the Front End Test Stand Accelerator peer review panel August 2011 Alan Letchford STFC, Rutherford Appleton Lab. On behalf.
ESS DTL beam commissioning
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael. A. Clarke-Gayther RAL / ASTeC.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
M. A. Clarke-Gayther RAL/FETS/HIPPI UK-NF 16 th September 2008 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
Alexander Aleksandrov Oak Ridge National Laboratory
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther RAL / ASTeC.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
M. A. Clarke-Gayther RAL/FETS/HIPPI HIPPI th October 2008 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
M. A. Clarke-GaytherRAL/FETS/HIPPICARE-07 October 30 th 2007 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
W. Barth, 8th FAIR Machine Advisory Committee, REPORTS BY NEW PROJECT DIVISION HEADS: “LINAC& Operations” organisation issues tasks and.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
UK Neutrino Factory Conceptual Design
The RAL Front End Test Stand
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
The RAL Front End Test Stand
Progress in the Multi-Ion Injector Linac Design
Status of the Front End Test Stand April 2007.
Optimisation of the FETS RFQ
H- Ion Source Development
LINAC4 commissioning plans etc.
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Multi-Ion Injector Linac Design – Progress Summary
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

The Front End Test Stand (FETS) is a collaborative project, between CCLRC and UK universities, to design and construct a test stand for demonstrating key technologies for the front end of next generation high power accelerators. By working closely with young university teams it is hoped to pass on the wealth of knowledge and experience of CCLRC staff to the next generation of accelerator engineers/physicists. The FETS team has members from ASTeC and ISIS as well as the physics departments of Imperial College London and Warwick University.

Joint Accelerator Workshop 28–29 March 2006 John Back (Warwick) Aaron Cheng (Imperial) Mike Clarke-Gayther (ISIS) Dan Faircloth (ISIS) Simon Jolly (Imperial) Ajit Kurup (Imperial) David Lee (Imperial) Alan Letchford (ISIS) Ciprian Plostinar (ASTeC) Jürgen Pozimski (ASTeC/Imperial) Peter Savage (Imperial) Chris Thomas (ISIS) The FETS team

Joint Accelerator Workshop 28–29 March 2006 Proton beam powers in the MW range are called for in many applications eg Spallation Source Neutrino factory Waste transmutation A big challenge for these future machines is controlling beam loss. Beam loss leads to component activation – component activation hinders hands-on maintenance. Absolute loss levels in the new machines (1 – 10 MW beam power) must be similar to that on ISIS (160 kW beam power). Fractional loss must therefore be reduced by orders of magnitude.

Joint Accelerator Workshop 28–29 March 2006 A significant source of beam loss in circular accelerators (synchrotron/accumulator/compressor) is trapping. Some of the beam is not trapped by the RF. Untrapped beam leads to loss.

Joint Accelerator Workshop 28–29 March 2006 Chopping the beam in the linac can lead to near 100% trapping efficiency. Chopping the linac beam gives little or no beam in the gap.

Joint Accelerator Workshop 28–29 March 2006 The linac macro pulse is composed of beam bunches at the linac RF frequency – typically 100s MHz. Few ns Unchopped beam Chopper pulse Chopped beam Partially chopped bunches lead to loss in the linac Chopper pulse must rise between linac bunches To achieve perfect chopping a very high speed (<2 ns) chopper is required

Joint Accelerator Workshop 28–29 March 2006 The purpose of the RAL Front End Test Stand is to demonstrate high quality chopped beams of H - ions. 60 mA 3 MeV up to 2 ms pulse length up to 50 pps repetition rate The RF frequency choice is important and was the subject of prolonged discussion. Too high and perfect chopping isn’t feasible. Too low and it’s not a credible demonstrator for future machines. A high power source must be available.

Joint Accelerator Workshop 28–29 March 2006 A frequency of 324 MHz has been chosen for FETS. A suitable high power pulsed klystron is available off-the- shelf from Toshiba - E3740A, 3 MW peak power. A klystron has been ordered for delivery in the 3 rd quarter of 2006.

Joint Accelerator Workshop 28–29 March 2006 FETS main components: High brightness H - ion source. Magnetic Low Energy Beam Transport (LEBT). High current, high duty factor Radio Frequency Quadrupole. Very high speed beam chopper. Comprehensive diagnostics.

Joint Accelerator Workshop 28–29 March 2006 Ion Source FETS will use the world leading ISIS H - Penning type ion source. This source routinely produces >40 mA in 250  s pulses at 50 pps. An extensive ongoing development programme will increase the duty factor and fully characterise the beam. Dan Faircloth Peter Savage Chris Thomas

Joint Accelerator Workshop 28–29 March ms 35mA beam at 50Hz Recent work has succeeded in producing 1.2 ms, 35 mA pulses at 50 pps.

Joint Accelerator Workshop 28–29 March 2006 A series of Oxford university student projects has resulted in energy spread measurements of the H - beam.

Joint Accelerator Workshop 28–29 March 2006 A pepper-pot system will measure the beam emittance as a function of position downstream of the source. Provides data for the LEBT design and information about space charge/neutralisation.

Joint Accelerator Workshop 28–29 March 2006 Magnetic LEBT A 3 solenoid magnetic LEBT is being designed, based on the one successfully used on the ISIS RFQ pre-injector upgrade. An electrostatic LEBT has been rejected due to the close proximity of the caesiated ion source. John Back

Joint Accelerator Workshop 28–29 March 2006 Optimisation of the magnetic design is nearing completion.

Joint Accelerator Workshop 28–29 March 2006 An initial beam optics design has been completed. Further optimisation will be carried out based on the results of the pepper- pot measurements.

Joint Accelerator Workshop 28–29 March MHz RFQ A 0.5 m, 324 MHz 4-vane RFQ cold model design is almost complete. Machining tests have been successfully completed in Aluminium. The cold model contains all the significant features of the final 4 m long design. Cold model production will start very soon – delayed by machine tool problems at IC. Tests of the brazing technique were completed successfully. Aaron Cheng Ajit Karup Alan Letchford Peter Savage

Joint Accelerator Workshop 28–29 March 2006 Final optimisation of some details – such as the vane end cut-aways – is all that remains to be done. A 4 rod RFQ design is also being investigated.

Joint Accelerator Workshop 28–29 March 2006 A computer controlled bead pull system is under development to perform cavity field measurements on the cold models

Joint Accelerator Workshop 28–29 March 2006 An initial beam dynamics design has been completed for the FETS 324 MHz RFQ. Negligible emittance growth and 94% transmission for a 60 mA beam. Further optimisation is expected.

Joint Accelerator Workshop 28–29 March 2006 High speed beam chopper A novel tandem chopper technique has been developed at RAL to overcome the conflicting requirements of fast rise time (< 2ns) and long flat-top (up to 100  s). A ‘fast’ chopper creates a short, clean gap in which a ‘slow’ chopper can switch on. The fast pulser is limited in flat-top but can switch between bunches. The slow pulser cannot switch between pulses but can generate the required flat-top. Giulia Bellodi Mike Clarke-Gayther Frank Gerigk Ciprian Plostinar

Joint Accelerator Workshop 28–29 March 2006 A state of the art fast switch developed for RAL has achieved ±1.4 kV with rise and fall times less than 2 ns.

Joint Accelerator Workshop 28–29 March 2006 Adjustable L-C trimmer Adjust cable lengths to change delay A trimmable helical structure with adjustable delays replaces the more ‘typical’ meander line.

Joint Accelerator Workshop 28–29 March 2006 Three chopper line optics designs are under investigation. A short line keeps the emittance growth low but makes chopping harder and requires some challenging technology. A long line is ‘easier’ but controlling the emittance is more challenging. The short ‘ESS’ solution will require novel, compact, high gradient quadrupoles and DTL- like cavities. Hybrid permanent and electromagnetic quads are being investigated.

Joint Accelerator Workshop 28–29 March 2006 Diagnostics David Lee Jürgen Pozimski (Christoph Gabor) Accurate diagnostics are essential for FETS to be successful. In addition to more usual diagnostic devices, non-destructive laser stripping techniques will be employed. Photo detachment Detection of distribution Charge separation                    “no” momentum transfer I(t,y,x)-> 2 D profile, transv.  magnetic dipole I(t,y)-> profile, long.  (TOF)

Joint Accelerator Workshop 28–29 March 2006 SNS laser beam profile monitor system.

Joint Accelerator Workshop 28–29 March 2006 IAP Frankfurt laser transverse emittance measurement system.

Joint Accelerator Workshop 28–29 March 2006 Timescales A fairly aggressive schedule has been set: Ion source commissioned by beginning LEBT commissioned by end RFQ commissioned by end MEBT/Chopper commissioned by mid-end Diagnostics commissioned in parallel. A tough timescale to meet for our small group and dependent on appropriate resources.