Transmission Planning at the California ISO September 10, 2015.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop.
Phase 2Phase 3Phase 4 Phase 5Phase 6 Phase 1 May – Aug 2007 Sept – Dec 2007 Jan – Apr 2008 May – Aug 2008 Sept – Dec 2008 Jan – Apr 2009 MUS Biennial Planning.
ROLE OF RPS CALCULATOR IN >33% RPS STATEWIDE TRANSMISSION PLANNING? 1.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
What’s Needed for Rational Discussion of Resource Adequacy: A Framework and Some Facts * presented by Kevin Woodruff, Principal, Woodruff Expert Services,
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
Thoughts on Order 1000 and Western Clean Energy Needs Doug Larson September 10, 2015.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company.
Navigating the Challenges Nancy Saracino Vice President, General Counsel & Chief Administrative Officer California Independent System Operator Independent.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
1 Preparation of Six-Year ED Sector Programme Cycle and its 1st biennium Advantages -Real alignment of biennial C/5 (within 6-year ED Programme Cycle)
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
AB 32 Implementation Nuts and Bolts IEP Annual Meeting September 22, 2008 Kevin Kennedy Office of Climate Change California Air Resources Board.
1 Entergy Transmission Planning Summit Transmission Planning Process Doug Powell New Orleans, LA July 8, 2004.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
Page 1 Future Strategy and Work Plan IESBA CAG Meeting September 11, 2013 New York Ken Siong, IESBA Technical Director.
PacifiCorp & CAISO Regional Transmission Organization Presented by Scott Gutting President, Energy Strategies, LLC Independent Energy Producers Annual.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Commission An Overview of the Renewable Energy Transmission Initiative (RETI 1.0) Joint Agency Workshop to Introduce the Renewable Energy.
FERC Order 1000 Drafting team activated April Filing Interregional Coordination Transmission Planning Regions CAISO, Columbia Grid, NTTG, WestConnect Interregional.
1 Entergy Transmission Planning Summit Transmission Planning & Budget Process Doug Powell New Orleans, LA July 10, 2003.
Fish and Game Commission Meeting December 3, 2014 Marine Region 1 Photo: Edgar Roberts.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ColumbiaGrid Updates PCC Meeting October 15,
CALIFORNIA ENERGY COMMISSION Renewable Energy Transmission Initiative (RETI)
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
FERC Order 1000 and its Potential Implications for BCCPG Transmission Providers BCCPG Steering Committee Meeting 20 September 2011.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Source: americans for a clean grid. CAISO - FERC 1000 Update CTPG is now WestConnect- strong relationship Inter-regional key coordinator (public policy.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
LNBA Subgroup: Avoided Transmission Value
Transmission Planning Attachment K Public Input Meeting
Mike Jaske California Energy Commission
Status of the Planning Working Group’s (PWG) Efforts
SEARUC Conference Little Rock, AR June 4, 2007
Transmission Planning Code
Revised engagement approach for draft GTAC
Due Dates subject to change. Watch for dashboard updates.
Convergence Bidding Working Group – 10/22/09
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
KPI and KVI Review Approach & Plan
Presentation transcript:

Transmission Planning at the California ISO September 10, 2015

ISO’s annual transmission planning process relies on state policy and state agency input and aligns assumptions Page 2 March 2016 April 2015 January 2015 State and federal policy CEC - Demand forecasts CPUC - Resource forecasts and common assumptions with procurement processes Other issues or concerns Phase 1 – Develop detailed study plan Phase 2 - Sequential technical studies Reliability analysis Renewable (policy- driven) analysis Economic analysis Publish comprehensive transmission plan with recommended projects ISO Board approves transmission plan Phase 3 Procurement

Transmission planning is coordinated with state processes: Create demand forecast & assess resource needs CEC & CPUC Creates transmission plan CAISO Creates procurement plan CPUC IOUs Final plan authorizes procurement Results feed into next biennial cycle

ISO transmission approvals over last 5 years – over 30 projects/yr until pace slowed in Slide 4 Transmission Plan Capital Cost in $ millions Delaney-Colorado River and Harry Allen-Eldorado

First cycle of CAISO’s biennial FERC Order 1000 interregional planning process begins 2016 Page 5 Four planning regions coordinate evaluation, selection, and allocation of costs of proposed interregional transmission projects (CAISO, Columbia Grid, Northern Tier, and West Connect) Phase 1 Development of ISO unified planning assumptions and study plan Phase 3 Receive proposals to build identified policy and economic transmission projects Mar 2016 Mar 2017 Project Submissions Due Mar 31 Conduct Screening Process Preliminary Assessment Interregional Coordination Stakeholder Meeting Dec 2015 Oct 2017 Jan 2016 Stakeholder Meeting 1 Mar Stakeholder Meeting 2 Sept Stakeholder Meeting 3 Nov Phase 2 Technical Studies and Board Approval Study Plan Addendum Jan 2017 Inform other Relevant Regions and Stop Assessment Move to the next planning cycle Stakeholder Meeting 4 Feb Viable?

The CAISO transmission planning process is well- positioned to play a key role in RETI 2.0 Past coordination on renewable generation development has been effective in identifying transmission needs for 33% RPS Further coordination is in place for load forecasting and forecasting of preferred resources Alignment has evolved and improved between the CAISO, CPUC and CEC processes Page 6