WorldSID 5 th TEG ISO WorldSID 50 th Group Summary of Meetings 16 March 2012 London, UK.

Slides:



Advertisements
Similar presentations
Presented by Dr. Tanmay Pramanik Overview of On-Site Team Evaluation.
Advertisements

WorldSID debut for UN / WP 29
51 st GRSP Session Draft new Regulation on child restraint systems Pierre CASTAING Informal document GRSP (51 st GRSP, May 2012, agenda item.
1 Modular Loadwall Side Impacts: Implications for Advanced Sensor Deflection Measures in Dummies John R. Humm N. Yoganandan Frank A. Pintar Department.
Master Schedule Building Presented by the MIS Department Northwest Regional ESD A Quick Overview.
Biorid Task List discussions June 14, 2011 Mike Beebe Paul Depinet Alex Schmitt GTR
Child safety with respect to vehicle protection and booster seats - a proposal for a CRF for children > 4yo 1 Informal document GRSP (55 th GRSP,
50th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal document GRSP (50th GRSP, December 2011, agenda item.
Modular Crane Control System (MCCS)
GTR-7 IWG Meeting 3 – Summary of Decisions and Actions Page  1  Harmonised drawings -Most drawings and tolerance agreed. Completion expected June  Upright.
Impact-Shield Type CRS in JNCAP National Agency for Automotive Safety and Victims ’ Aid Informal document No. GRSP Rev.1 (43rd GRSP, May 2008.
Frank L. H. WolfsDepartment of Physics and Astronomy, University of Rochester Physics 121, April 1, Equilibrium.
Thu Oct 30ILC Positron Workshop, DL1 Positron Target Prototype – Current Status Leo Jenner Jim Clarke, Ian Bailey Ken Davies, Andy Gallagher, Lei Zang.
1 Infrastructure Trial Running a Dress Rehearsal.
The greatest powerpoint presentation game you have ever played!!! Press to start Note: to quit DO NOT press “end show”, but instead play past part one.
GTR9-C-04 History of Development of the Flexible Pedestrian Legform Impactor (Flex-PLI) November 3rd, 2011 Japan.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Head Restraint GTR Status to AC th Session of WP.29 March 2007 Informal document No. WP , March 2007, agenda item II
Presentation to the GRSP December 2001 WorldSID Advanced Harmonised Dummy for Side Impact Martin Page C.E.E.S.A.R. (representing LAB) On behalf of the.
52 nd GRSP Session IWG on draft new Regulation on child restraint systems Pierre CASTAING Informal document GRSP (52 nd GRSP, December 2012,
Update on Pedestrian Leg Testing
Professional Development Programs
Presented by: Insert Name Safety Management Consultant
CO2 Cars Project #2 Land Transportation.
The Narrowband Transition A Primer. Narrowband Transition What is it? What is it? A nation-wide move to new VHF/FM frequencies A nation-wide move to new.
Forty-second session of GRSP December REGULATION No. 94 (Frontal collision) Proposal for draft amendments Proposal submitted by France Informal.
1/11 Proposal on Thorax Injury Criteria to protect elderly occupants February 27, 2013 Jasic.
Proposal for Draft Amendment to Regulation No. 117
Title: Australia’s Proposal for the Development of Pole Side Impact GTR Presenter’s Name: Allan Jonas Economy: Australia 33rd APEC Transportation Working.
Reactive robots UPNA The Public University of Navarra Material for pupils & students.
WorldSID Update Edmund Hautmann BMW Group On behalf of the WorldSID Task Group 36 th GRSP Session Geneva, December 7-10, 2004 Edmund Hautmann BMW Group.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
EEVC WG20 European Enhanced Vehicle-safety Committee 12 th December, 2006 Slide 1 EEVC WG20 and WG12 Rear Impact Test Procedure Development Programme Presented.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
IHRA Side Impact Working Group Status Report GRSP, December 2002
Find the Mindstorms Icon on the computer.. To start a new program click go.
Progress report of TFG 7 “Fire resistance test” Mar 19, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
DTP/DHC update. DTP 13 th to 15 th April, EPA, Ann Arbor Chair: Michael Olechiw (co-chair from India unable to attend) No great advances were made in.
1 Research on Chest Injury Criteria JASIC 54 th GRSP December, 2013 Submitted by the expert from Japan Informal document GRSP (54 th GRSP,
Introduction to Revision of GTR 7
WorldSID 50 th Update Klaus Bortenschlager PDB - Partnership for Dummy Technology and Biomechanics on behalf of the WorldSID Task Group 44 th GRSP Session.
1 MFGT 104 Materials and Quality Compression, Shear, Flexural, Impact Testing Professor Joe Greene CSU, CHICO.
3 rd Meeting of the IWG GTR No. 7 Draft Status Report of the BioRID TEG Bernd Lorenz (BASt) Chairman Geneva,17 th May 2010 GTR
Draft Status Report of the BioRID TEG Bernd Lorenz (BASt) Chairman 51 st GRSP Geneva, 21 st May 2012 Informal document GRSP (51st GRSP, 21–25 May.
WorldSID Update Edmund Hautmann BMW Group On behalf of the WorldSID Task Group 34 th GRSP Session Geneva, December 8-12, 2003 Edmund Hautmann BMW Group.
Common Origination and Disbursement (COD) Open Forum Session 19.
Technical Aspects: Pole Vault Kyle Rutledge Asst. Coach Pittsburg State University.
Evaluation of ES-2 by the Occupant Safety Research Partnership of USCAR presented by Annette L. Irwin representing the Alliance of Automobile Manufacturers.
Progress report of TFG 7 “Fire resistance test” Mar. 3rd, 2016 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
Cases for Reconstruction Programme. CCN0010 Cars: Peugeot 309 (MY 1986) vs. side of Renault 25 (MY 1986) Reasons for repeating: P10 and P3modified were.
WorldSID Update Edmund Hautmann BMW Group On behalf of the WorldSID Task Group 37 th GRSP Session Geneva, May 23 rd -27 th, 2005 Edmund Hautmann BMW Group.
Dynamic Impact Procedures Training Class Sled Test Demonstration July G 44 Ft/sec 10° Left Yaw (CCW) Deformed Floor Single Place Oblique Passenger.
CHAPTER OVERVIEW The Case Study Ethnographic Research
The Transportation Model
WorldSID Positioning Sub-Committee Update
45th GRSP Session Status report of Informal Group on CRS
Closeout OPS 2017 StayTreat.
Design of a Biofidelic, Instrumented 2. 5 Kg Infant Dummy N
Measurement Capabilities of Biofidelic 3.4 Kg Infant Dummy
OICA Feedback on Proposed Test Procedure
Introduction to Revision of GTR 7
Summary of ISO TC43/SC1 WG42 November 2018, Matsue, Japan
Preliminary Hazard Analysis of Bunker
52nd GRSP Session Status report of Informal Group on FI
CHAPTER OVERVIEW The Case Study Ethnographic Research
Tyre Industry workplan proposal to IWG Worn tyres
IWG Worn tyres Tyre Industry work status July 17th 2019
OICA 31st session of GRSP May 2002
IWG Worn tyres Tyre Industry work status July 17th 2019
IWG Worn tyres Tyre Industry work status July 17th 2019
Presentation transcript:

WorldSID 5 th TEG ISO WorldSID 50 th Group Summary of Meetings 16 March 2012 London, UK

The Chairs and members of the 5 th TEG and the ISO 50 th Group wish to thank – Allan McKenzie and the SMMT for providing the room and facilities for the meetings B. Frost for making the connection with Mr. McKenzie and the SMMT Humanetics for providing the WebEx capability The Chairs and members of the 5 th TEG and the ISO 50 th Group wish to thank – Allan McKenzie and the SMMT for providing the room and facilities for the meetings B. Frost for making the connection with Mr. McKenzie and the SMMT Humanetics for providing the WebEx capability Thank you

Both the 5 th and the 50 th groups met in-person and by WebEx Morning and afternoon sessions were held A great deal of information was presented by several laboratories There was insufficient time to absorb and process all of the new information – few decisions were made! An additional meeting in April is planned because there is so much new material to deal with. Both the 5 th and the 50 th groups met in-person and by WebEx Morning and afternoon sessions were held A great deal of information was presented by several laboratories There was insufficient time to absorb and process all of the new information – few decisions were made! An additional meeting in April is planned because there is so much new material to deal with. Overview

Summary 5 th Items A data and presentation archive has been created on the UVa Colab site. Password required Bruce Donnelly is the administrator if interested VRTC biofidelity test data In progress – both ISO and NHTSA biofidelity tests will be conducted. Reproducibility issues between two 5 th dummies, however Left and Right repeatability looks good. A data and presentation archive has been created on the UVa Colab site. Password required Bruce Donnelly is the administrator if interested VRTC biofidelity test data In progress – both ISO and NHTSA biofidelity tests will be conducted. Reproducibility issues between two 5 th dummies, however Left and Right repeatability looks good.

5 th continued TRL testing ISO Biofidelity tests in progress High speed flat wall tests may be too severe? TRL ran at slower speeds This is not unlike SIDIIs biofidelity testing Specific durability concerns with high speed tests: IRTRACC rotation limitations and durability (already resolved by HIS) Shoulder contact with combined lateral and vertical motion (under investigation, may not be problem in crash tests) Pelvis iliac wing contact with S-I load cell (current redesign helped but did not eliminate issue) TRL testing ISO Biofidelity tests in progress High speed flat wall tests may be too severe? TRL ran at slower speeds This is not unlike SIDIIs biofidelity testing Specific durability concerns with high speed tests: IRTRACC rotation limitations and durability (already resolved by HIS) Shoulder contact with combined lateral and vertical motion (under investigation, may not be problem in crash tests) Pelvis iliac wing contact with S-I load cell (current redesign helped but did not eliminate issue)

5 th continued TRL testing – continued Normalization of 50 th and 5 th response using ISO methodology ISO worked well for scaling test severities. ISO worked less well for scaling dummy sizes. ISO did not work well for time components. Preliminary Report on Transport Canada full vehicle crash tests with WorldSID 5 th In some tests the HIC was low but BRIC was high. In other cases the two criteria more closely correlated TRL testing – continued Normalization of 50 th and 5 th response using ISO methodology ISO worked well for scaling test severities. ISO worked less well for scaling dummy sizes. ISO did not work well for time components. Preliminary Report on Transport Canada full vehicle crash tests with WorldSID 5 th In some tests the HIC was low but BRIC was high. In other cases the two criteria more closely correlated

50 th and 5 th Pelvis Flesh Interference Both the WorldSID 5 th and WorldSID 50 th demonstrate contact between bottom rib and pelvis flesh in certain seating positions.

Pelvis Flesh Interference has been evaluated by several groups: EuroNCAP workshop Evaluated WorldSID 50 th Interference can be achieved in certain seating positions TRL Evaluated WorldSID5th Pelvis flesh tucked behind rib (difficult to achieve) Pelvis flesh in front of rib (easier to achieve) Pelvis flesh cut away (possible redesign countermeasure) Both interference conditions did restrict rib rotation. Pelvis Flesh Interference has been evaluated by several groups: EuroNCAP workshop Evaluated WorldSID 50 th Interference can be achieved in certain seating positions TRL Evaluated WorldSID5th Pelvis flesh tucked behind rib (difficult to achieve) Pelvis flesh in front of rib (easier to achieve) Pelvis flesh cut away (possible redesign countermeasure) Both interference conditions did restrict rib rotation. 50 th and 5 th Pelvis Flesh Interference

Pelvis Flesh Interference has been evaluated by several groups: MCW Evaluated WorldSID50th Pendulum tests with flesh in front of pelvis Some restriction of rib rotation Sled tests with interference (planned) Pendulum / sled tests with cut-away flesh (planned) PDB (Daimler) Evaluated WorldSID 50 th Pendulum tests suggested small affect of interference on deflection (approx. 1.5 mm). (rotation not measured.) Pelvis Flesh Interference has been evaluated by several groups: MCW Evaluated WorldSID50th Pendulum tests with flesh in front of pelvis Some restriction of rib rotation Sled tests with interference (planned) Pendulum / sled tests with cut-away flesh (planned) PDB (Daimler) Evaluated WorldSID 50 th Pendulum tests suggested small affect of interference on deflection (approx. 1.5 mm). (rotation not measured.) 50 th and 5 th Pelvis Flesh Interference

Pelvis Flesh Interference has been evaluated by several groups: Humanetics Pending MCW sled tests – will redesign flesh geometry to reduce interference for WorldSID 5 th and WorldSID 50 th. Pelvis biofidelity tests for other reasons (material changes) will wait until geometry is resolved. Pelvis Flesh Interference has been evaluated by several groups: Humanetics Pending MCW sled tests – will redesign flesh geometry to reduce interference for WorldSID 5 th and WorldSID 50 th. Pelvis biofidelity tests for other reasons (material changes) will wait until geometry is resolved. 50 th and 5 th Pelvis Flesh Interference

Summary 50 th Items MCW analysis & testing Re-analysis of thoracic chestband deflection with spinal origin Spinal origin approx. 23% forward of most posterior position Analysis suggests differences in deflection not a great as anticipated. MCW analysis & testing Re-analysis of thoracic chestband deflection with spinal origin Spinal origin approx. 23% forward of most posterior position Analysis suggests differences in deflection not a great as anticipated.

Summary 50 th Items Material Changes Japan Green Project and European Reach Project driving material changes in WorldSID and all dummies: WorldSID blue damping material: OK no changes Ureol ( WS skull and iliac): replacement identified Hyperlast (WS pelvis flesh): replacement needed Vinyl plasticizer: may affect all vinyls, all dummies Material Changes Japan Green Project and European Reach Project driving material changes in WorldSID and all dummies: WorldSID blue damping material: OK no changes Ureol ( WS skull and iliac): replacement identified Hyperlast (WS pelvis flesh): replacement needed Vinyl plasticizer: may affect all vinyls, all dummies

Summary 50 th Items Miscellaneous Tilt sensor Discrepancy with pelvis tilt sensor has been solved by Humanetics Requires changes to mounting block External Dimensions Preliminary procedure is complete. Humanetics waiting for labs to respond with feedback. Miscellaneous Tilt sensor Discrepancy with pelvis tilt sensor has been solved by Humanetics Requires changes to mounting block External Dimensions Preliminary procedure is complete. Humanetics waiting for labs to respond with feedback.

Future Plans Next meeting April WebEx – Doodle invitation May WebEx – 8 May 2012, 7:00AM Eastern US DST Next meeting April WebEx – Doodle invitation May WebEx – 8 May 2012, 7:00AM Eastern US DST