Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Final Presentation Final Packaged Design.

Slides:



Advertisements
Similar presentations
ECE 477 Final Presentation Team 03 - Spring 2013 Ryan Pawling Spencer Julian Josh Hunsberger Robert Harris.
Advertisements

ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
ECE 477 Final Presentation Team 6  Spring 2010 Digital Sound Projection.
ECE 477 Final Presentation Team ??  Fall 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 10  Spring 2008 Paul Ng Daniel Bixby Matt Ligocki David Collins Paul Ng Daniel Bixby Matt Ligocki David Collins.
Twitch Plays ECE477 ECE 477 Design Review Team 1 − Spring 2015 Hannan Harlan Root Tornquist.
ECE 477 Final Presentation Team 15  Spring 2013 Andrew Batek, Jackson McCormick, Carey Woolet, Justin Lindley.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 F INAL P RESENTATION T EAM 5  S PRING 2013 Tung Lun Loo Xue Yuan Wong Yu Chen Lim Chuan Yean Tan MY ATM.
ECE 477 Final Presentation Team 03  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 FINAL PRESENTATION TEAM 7  SPRING 2013 COST ROBOT ERIC OSBORNE, BRYAN DALLAS, ANDREW LOVELESS, CAROLINE TRIPPEL.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
ECE 477 Design Review Team 2  Spring 2010 Digi-Brush Josh LongCaleb Ayew-ewKatie Schremser.
ECE 477 Final Presentation Team 16 − Spring 2013 Scott Stack Neil Kumar Jon Roose John Hubberts.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Final Presentation Team 7  Spring 2011 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 20  Spring 2013 Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Final Presentation Team 14  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 5  Fall 2009 Left to right: Ben, Dennis, Jacqui, Ian.
ECE 477 Final Presentation Team 21 - Spring 2013 Team Members: Duncan Swartz, Jacqueline Greer, Tom Pansino, Mark Tubergen.
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
ECE 477 Final Presentation Team 1  Spring 2012 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 14  Spring 2012.
ECE 477 Final Presentation Team 18  Spring 2013 Derek Pesyna, Tim Brown, Evan Foote, Doug Wile.
Treasure Chess ECE 477 Team 2 Parul Schroff Environmental Impact Analysis.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
CS-EE 481 Spring February, 2005 University of Portland School of Engineering Project Swift Fox Automotive Accelerometer & RPM Monitor Team Andrew.
ECE 477 Final Presentation Team 4  Spring Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Final Presentation Team 9  Spring 2011 Above (Left to Right): Nick Gentry, Oliver Staton, Vineet Ahuja, and Vinayak Gokhale.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
ECE 477 Final Presentation Team 2  Spring 2010 Caleb Ayew-ew Josh Long Katie Schremser The Digi-Brush.
1 © 2008 RoboRubik ECE 477 Final Presentation Team 11 – Spring 2008 Tyler Heck Dave Bukiet Erik Carron Casey Kloiber.
ECE 477 Final Presentation Team 1  Spring 2013 Zelun Tie Xin Jin Ranmin Chen Hang Xie.
Treasure Chess ECE 477 Team 2 Parul Schroff Software Design Narrative.
ECE 477 Final Presentation Team 3  Fall 2012 Daniel Carolyn Jonathan Mihir Stein McMican Kuntzman Shah.
ECE 477 Final Presentation Team 01  Spring 2010 Mike Wei Jon SchwarzCarlo Mesina Bill Bergquist.
 Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration  Questions / discussion.
V i t a l i s Wireless Biometric Sensor ECE 477 Final Presentation Team 13  Spring 2013 Paste a photo of team members with completed project here. Annotate.
ECE 477 Final Presentation Team 2  Fall 2010 Shannon Abrell Ben Laskowski Andrew Phillips Rob Swanson.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Final Presentation Team 4  Spring 2011 Petra M. Alex B. Alex G. Kim S.
ECE 477 Final Presentation Team 13  Spring 2012 Martin Pendergast, Stephen Edwards, Nick Kwolek, David Duelmler.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
ECE 477 Final Presentation Team 22  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 01  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Final Presentation Team 13  Spring 2008 Varun Srichand Anvesh Madhu.
ECE 477 Final Presentation Team 9  Fall 2009 DART.
<Add team picture or relevant project picture here>
<Add team picture or relevant project picture here>
ECE 477 Final Presentation Team 04  Spring 2010
Treasure Chess ECE 477 Team 2 Brock Caley Sidharth Malik Parul Schroff
ECE 477 Final Presentation Team 8 Spring 2013
ECE 477 Final Review: Team #
ECE 477 Design Review Team 21 - Spring 2013
Treasure Chess ECE 477 Team 2 Sidharth Malik.
ECE 477 Final Presentation Team 4  Fall 2011
Treasure Chess ECE 477 Team 2
ECE 477 Final Presentation Team 2 Spring 2012
ECE 477 Final Presentation Team 3 – Fall 2008
ECE 477 Final Presentation Team 10  Spring 2008
Treasure Chess ECE 477 Team 2 Brock Caley.
ECE 477 Final Presentation Team 4  Fall 2010
ECE 477 Final Presentation Team 1  Spring 2008
ECE 477 Senior Design Group 5  Spring 2011
ECE 477 Design Review Team ??  Fall 2012
ECE 477 Final Presentation Team 15  Spring 2010
ECE 477 Final Presentation Team 13  Spring 2011
ECE 477 Final Presentation Group 10  Spring 2005
Presentation transcript:

Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Final Presentation Final Packaged Design

Outline Project overview Block diagram Design challenges Individual contributions Project demonstration Questions / discussion

Project Overview An electronic chess game that can display possible moves for the chess piece selected by the player RGB LED matrix panel to display the chess board and the current state of the game OLED to display time and number of pieces lost during the game PIC24EP512GU810 microcontroller for display and game logic, dsPIC33FJ128GP202 for voice recognition

Block Diagram

Design Challenges Voice Recognition Power supplies RGB LED matrix panels

Individual Contributions Team Leader – Sidharth Malik Team Member 2 – Brock Caley Team Member 3 – Jeremy Stork Team Member 4 – Parul Schroff

Team Leader - Sidharth Malik Helped with schematics Made the PCB Debugging power supplies RGB LED Matrix

Member 2 – Brock Caley Hardware Selection Packaging Design Packaging Construction PCB Assembly

Member 3 – Jeremy Stork Schematics Prototyping Hardware debugging OLEDs Keypads

Member 4 – Parul Schroff Software - Game logic Peripheral Interfacing OLEDs Keypads RGB LED Matrix

Project Demonstration 1.An ability to correctly output the current state of the game. 2.An ability to select and move a piece on the chess board with voice commands. 3.An ability to show players' possible moves for a piece they have selected. 4.An ability to keep track of in-game statistics such as time and pieces lost during the play. 5.An ability to tell the player when a move is illegal, or when they are in check/checkmate state. Demo Video

Questions