BWI Hilton Hotel Thomas Sabol The Pennsylvania State University

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Andres Lepage Steven Stein ROOSEVELT ISLAND SOUTHTOWN BUILDING.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Hershey Academic Support Center Structural Option Shawn Jones Building Analysis of the Hershey Academic Support Center Hershey, PA Shawn Jones Structural.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Kirk Stauffer BAE / MAE - Structural Option Senior Thesis Project Life Sciences Building The Pennsylvania State University University Park Campus.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Hyatt Regency Pittsburgh International Airport Hiro McNulty Structural Option AE Senior Thesis Spring 2006.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
CONDOMINIUM TOWER & PARKING
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Ryan Johnson - Structural Option
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Presentation transcript:

BWI Hilton Hotel Thomas Sabol The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Ali M. Memari Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

Introduction BWI Hilton Hotel 131’ Hotel -11-Stories & Penthouse -203,300 s.f. -280 Guest Rooms -80-Car Parking Below Ground -Aqua Restaurant Hotel Located: Linthicum Heights, Maryland 0.5 miles from BWI Airport Height Restriction: ≈ 290’ from datum Airport Thomas Sabol Senior Thesis Presentations: Spring 2007

Introduction BWI Hilton Hotel “Adjacent Structure” -Framed in Structural Steel Includes: -Main Entrance 8,300 s.f. Double Heighted-Ballroom Pool Area (Epoxy Reinf.) Concrete Thomas Sabol Senior Thesis Presentations: Spring 2007

Project Team BWI Hilton Hotel Owner: Buccini-Pollin Architect: Brennan Beer Gorman Monk Structural Engineer: Holbert Apple Associates MEP Engineer: R G Vander Weil Engineers Geotech Engineer: ECS, Ltd General Contractor: HITT Contracting Inc. Thomas Sabol Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

Existing Structure – Gravity System BWI Hilton Hotel Existing Structure – Gravity System - 9” Flat Slab - 9’x9’x4” Drop Panel Mild Reinforced f’c = 4000 psi - Bay size typical 27’x20’ Ground Floor Framing Columns f’c = 5600 psi Thomas Sabol Senior Thesis Presentations: Spring 2007

Existing Structure – Gravity System BWI Hilton Hotel Existing Structure – Gravity System - 7-1/2” Flat Plate Post Tension f’c = 4000 psi Fe = 295 Kips in E-W - Fe = 24 Kips/ft in N-S Typical Framing Plan 4-11 Columns f’c = 4000 psi Thomas Sabol Senior Thesis Presentations: Spring 2007

Existing Structure – Lateral System BWI Hilton Hotel Existing Structure – Lateral System 12 Shear Walls 3 around each stair Tower 5 around elevator core 1 extends to 2nd Floor - 12” Thick - f’c = 4000 psi Shear Wall Locations Thomas Sabol Senior Thesis Presentations: Spring 2007

Existing Structure – Foundation BWI Hilton Hotel Existing Structure – Foundation - Spread Footings under Gravity Columns Mat Slabs under Elevator Core 36” thick and Stair Towers 32” thick Footings f’c 3000psi - 5” SOG f’c 3500 psi Thomas Sabol Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

Problem Statement BWI Hilton Hotel Height Restriction: ≈ 290’ from datum (Federal Aviation Administration) Air Traffic Disruption of Architecture Same Bay Layout Bottom of Flat Plate Thomas Sabol Senior Thesis Presentations: Spring 2007

$$$ Proposal Goals BWI Hilton Hotel Preserve Architecture Comparable Steel Structure 7-1/2” Post Tension Flat-Plate Hotel Benefit $$$ Redesigned Structure Faster Erection Thomas Sabol Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

Girder-Slab System BWI Hilton Hotel Composite Action through Grouting Transformed Section Thomas Sabol Senior Thesis Presentations: Spring 2007

Girder-Slab System for Typical Floors 4-11 BWI Hilton Hotel Girder-Slab System for Typical Floors 4-11 Designs Goals Comparable Thickness of PT (7-1/2”) Design Parameters - Strength → Live Load: 40 psf - Deflection Design Method - ASD, Girder-Slab Design Guide - Manual Calculations Floors 4-11 Thomas Sabol Senior Thesis Presentations: Spring 2007

Girder-Slab System for Typical Floors 4-11 BWI Hilton Hotel Girder-Slab System for Typical Floors 4-11 Pre-Composite Strength Controls MDL=50 ft-kips - 8” Hollow Core Plank with ¾” Topping - DB8x40 → Ms = 66 ft-kips - “Tree” Column Connection Thomas Sabol Senior Thesis Presentations: Spring 2007

Girder-Slab System for Typical Floors 4-11 BWI Hilton Hotel Girder-Slab System for Typical Floors 4-11 DB Connection to WF “Tree” Column - 23.2 Kips Shear at Hinge - 3/8” Plate w/ 2 – 7/8”ø A325N bolts - “Tree” - WT8x22.5 Fillet both sides & Bevel Weld 52.2 ft-Kips at Column face Thomas Sabol Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

Composite Beam and Slab for Floors G-3 BWI Hilton Hotel Composite Beam and Slab for Floors G-3 Designs Goals - Comparable Structure Design Parameters -Strength →LL: 100 psf -Deflection -Vibration Design Method - ASD - RAM Structural System Ground Floor 2nd Floor 2” LOK-Floor Deck 3” Concrete 3rd Floor Thomas Sabol Senior Thesis Presentations: Spring 2007

Composite Beam and Slab for Floors G-3 BWI Hilton Hotel Composite Beam and Slab for Floors G-3 Deflection Controlled Design - L/240 for Total Loading - ILB≥ 171in4 for Beams - ILB≥ 853in4 for Girders Other Sizes used: - Beams: W12x19, W14x22 - Girders: W16x31,W18x40 Thomas Sabol Senior Thesis Presentations: Spring 2007

Walking Vibrations Checked for Office Area BWI Hilton Hotel Walking Vibrations Checked for Office Area Full height Partitions β = 0.05 Natural Frequencies Beam Mode 10.2 Hz Girder Mode 7.28 Hz Combined Mode 5.93 Hz ap/g = 0.31%g Recommended Limit for Offices: 0.5%g → OK Thomas Sabol Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

Lateral Loads Obtained from ASCE7-05 BWI Hilton Hotel Lateral Loads Obtained from ASCE7-05 Wind Loads Basic Wind Speed 90 mph Case 1 Loading Controlled Equivalent Lateral Force Method Seismic Design Category: B SDS= 0.160 SD1 = 0.085 R= 3.25 (Ord. Steel Conc. Braced Frames) Base Shear 469 Kips Base Shears N-S 191 Kips E-W 543 Kips N Thomas Sabol Senior Thesis Presentations: Spring 2007

Braced Frames Resist Lateral Loads BWI Hilton Hotel Braced Frames Resist Lateral Loads Chevrons & Cross Braces HSS & Double Angles Thomas Sabol Senior Thesis Presentations: Spring 2007

Iterative Process to Design Braced Frames BWI Hilton Hotel Iterative Process to Design Braced Frames Braced Frame #5 Design Controlled by Displacement of H/400 Cross Braces Increased Stiffness by a Factor ≈ 3 Column sizes were Increased Brace sizes were Increased Members Checked for ASD Load Combinations Thomas Sabol Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

Footing Sizes Decrease for Steel Structure BWI Hilton Hotel Footing Sizes Decrease for Steel Structure Footing at Column Line F-5.2 Original Re-designed 1094 Kips 675 Kips Plan 8’-0” 10’-0” 8’-0” 10’-0” 40” Section 29” Decrease in Volume by 53% Thomas Sabol Senior Thesis Presentations: Spring 2007

Footing Sizes Decrease for Steel Structure BWI Hilton Hotel Footing Sizes Decrease for Steel Structure Two other footings were resized: Concrete Volumes Decreased by 50% and 63% Existing Footing Volume: 390 yd3 50% of Existing: 195 yd3 R.S. Means Cost per Footing: $370/yd3 Savings of $72,150.00 Thomas Sabol Senior Thesis Presentations: Spring 2007

Structural Depth Recap BWI Hilton Hotel Structural Depth Recap Girder-Slab system for Typical floors 4-11 Composite Beam for floors ground-3rd Braced Frames resist lateral loads 50% Reduction in Footings. Thomas Sabol Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

Cost Comparison of Systems BWI Hilton Hotel Cost Comparison of Systems Thomas Sabol Senior Thesis Presentations: Spring 2007

Schedule Reduced from Girder-Slab System BWI Hilton Hotel Schedule Reduced from Girder-Slab System Erection of Concrete Structure 189 Calendar days Erection of Steel Structure 144 Calendar days Schedule Reduced by 45 Days! Thomas Sabol Senior Thesis Presentations: Spring 2007

$1,713,150.00 Schedule Impacts on Hotel BWI Hilton Hotel Schedule Impacts on Hotel Average Occupancy: 180 rooms per Night Average Hotel Cost: $211.50 per Room Hotel Opens 45 days Earlier Hotel would Generate a Revenue of: $1,713,150.00 Thomas Sabol Senior Thesis Presentations: Spring 2007

Hotel would Save/Generate: BWI Hilton Hotel Summary of Cost Analysis Hotel would Save/Generate: $1,719,620.00!! Thomas Sabol Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

LEED Certified Hotel Research BWI Hilton Hotel LEED Certified Hotel Research 1st LEED Certified Hilton Hotel LEED strategies: - Buying locally - Dimmable Fluorescents - CO2 monitoring - Recycle Construction Waste Hilton Vancouver Washington 30 People Surveyed Consumers’ Preference Thomas Sabol Senior Thesis Presentations: Spring 2007

LEED Certified Hotel Research BWI Hilton Hotel LEED Certified Hotel Research What does the Consumer want? - Willing to Pay Slightly more - Desirable Location - Information Thomas Sabol Senior Thesis Presentations: Spring 2007

Presentation Overview BWI Hilton Hotel Presentation Overview Introduction Existing Structure Problem Statement/Proposal Structural Redesign: Girder-Slab for Typical Floors Composite Beam for Ground – 3rd Floor Braced Frames Footings Cost & Schedule LEED Hotel Research Conclusions Thomas Sabol Senior Thesis Presentations: Spring 2007

Conclusions & Recommendation BWI Hilton Hotel Conclusions & Recommendation Use Redesigned Steel System Why? Girder-Slab System: - Cuts down Schedule - Comparable to PT floor thickness (1-1/4” thicker) Steel System: Reduces Footing Sizes Overall Savings/Earnings of $1,719,620.00 Thomas Sabol Senior Thesis Presentations: Spring 2007

AE Faculty: Guidance & Patience BWI Hilton Hotel Acknowledgments David Holbert, Holbert Apple & Associates: Providing my Building & Drawings AE Faculty: Guidance & Patience Industry Professionals: Providing Help & Information 5th AE students: Endless Entertainment & Help Family & Friends: Love and Support throughout the years THANK YOU!! Thomas Sabol Senior Thesis Presentations: Spring 2007

BWI Hilton Hotel Questions? Thomas Sabol Senior Thesis Presentations: Spring 2007