Forecasting Data Center Power Requirements: Tips from the Trenches Frank Bereznay Moses Chu IBM.

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Module – 3 Data protection – raid
Introduction to Using Microsoft Excel and Spreadsheets Click to continue.
International Society for Pharmaceutical Engineering Student Chapter Standard of Excellence Training Program Webinar August 2007.
The C P U In this lesson you will learn about the Press Enter or Click to continue Central Processing Unit.
Forecasting Data Center Power Requirements: Tips from the Trenches Frank Bereznay Kaiser Permanente.
Chapter 1 Computer, Internet, Web, and Basics
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Notes on Report Writing GE 105 : Introduction to Engineering Design.
LAFA Food Distribution July 26, Introduction:
PG&E and Altera Data Center Energy Efficiency Project.
PI Helps Solve NT Server Performance Issues and Network Incidents Or The PI’s Have It.
ELECTRICAL SYSTEMS 21.3.
Systems Analysis and Design 9th Edition
BORIS MILAŠINOVIĆ KREŠIMIR FERTALJ UNIVERSITY OF ZAGREB FACULTY OF ELECTRICAL ENGINEERING AND COMPUTING CROATIA Teaching staff role in students projects.
Component 4: Introduction to Information and Computer Science Unit 1: Basic Computing Concepts, Including History Lecture 1 This material was developed.
Swami NatarajanJune 17, 2015 RIT Software Engineering Reliability Engineering.
Preparing and Using Schematics for Wiring Applications Using Cable
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Data Center & IT Monitoring Use Cases Regional Seminar Series Carolyn.
HIT241 - COST MANAGEMENT Introduction
Network Topologies. The concept of a topology. The basic function of computers on the LAN is to provide the user with an almost limitless set of applications.
Panels and Subpanels. Main Service Panel aka Load Center The Load Center is the heart and soul of a home’s electrical system. It: – Serves as a distribution.
We Design It Replacing Hard Drives Tutorial Seven Easy Steps By: James Landon Carie Jackson Odetta Rodriguez Michelle R. Person Miceala Vega.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
IT Business Continuity Briefing March 3,  Incident Overview  Improving the power posture of the Primary Data Center  STAGEnet Redundancy  Telephone.
Part VII: Special Topics Introduction to Business 3e 18 Copyright © 2004 South-Western. All rights reserved. Using Information Technology.
AFCI Reaction to Utility Events. CenterPoint Energy 35 KV Distribution Capacitor Bank – Switched through an automated system.
Bellringer What happens when you turn the lights on? What allows lights to be turned on and off? Write your answer or draw an explanatory picture for later.
Chapter 6 Organizational Information Systems
IEEE Standard : The Revised PQ MonitoringStandard Randy Collins Chair, 1159 Working Group IEEE Power Engineering Society Winter Meeting New York.
COMP 2923 A2 Basic Green IT Audit Danny Silver JSOCS, Acadia University.
Setting Your Fees Project Cost and Setting Your Fees.
©2013 – JouleX Enterprise Energy Management Quickly identify energy waste Reduce energy usage and costs Lower carbon emissions Agentless, network-based.
Chapter 4: Project Cost Management
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
The Computer System Review Game. Allison turned her computer on, but nothing happened. What is Allison’s computer most likely missing? A. Application.
Component 4: Introduction to Information and Computer Science
9/17/2002 COSYSMO Usage Experience Panel: What is Happening at Lockheed Martin Garry Roedler, Lockheed Martin Engineering Process Improvement Center
11 CHAPTER INFORMATION TECHNOLOGY, THE INTERNET, AND YOU.
Project Cost Management
System Implementation
Measuring Success Chapter 19. The Importance of Measurement “It’s almost inconceivable to invest money in a significant program like communications without.
RTF Update Kevin Smit Kelly Tarp ProCost Version 3.0 Modifications A registered professional engineering corporation with offices in the Seattle,
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Datacenter Energy Efficiency Research: An Update Lawrence Berkeley National Laboratory Bill Tschudi July 29, 2004.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
An Overview of: Generation Connections: Transmission Connection Cost Responsibility Review July
E. Follow-up discussion on Parallel CT clarification per SMOG (e) (H. Perez) SMOG (e) Paralleling of Current Transformers – Connected burden.
(6) Estimating Computer’s efficiency Software Estimation The objective of Software Estimation is to provide the skills needed to accurately predict the.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Metering and Measuring of Multi-Family Pool Pumps, Phase 1 March 10, 2016 Presented by Dan Mort & Sasha Baroiant ADM Associates, Inc.
Copyright 2015 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
QAD Demand Management Patrick Grace, QAD Solutions Consultant September 27th, Fall MWUG Session.
Data Mining for Expertise: Using Scopus to Create Lists of Experts for U.S. Department of Education Discretionary Grant Programs Good afternoon, my name.
Current Electricity and Circuits
LCLS-II Technical Requirements
Visualizing your data effectively
Business System Development
Chapter 1: An Overview of Computers and Programming Languages
Commissioning – Remote monitoring
Consumer technology is creating the smart home
Electrical Systems Electrical Systems
Jonathan Gladstone, P. Eng
Bellringer What happens when you turn the lights on? What allows lights to be turned on and off? Write your answer or draw an explanatory picture for later.
Social Media and Networking for a University
Chapter Twenty One: Electrical Systems
Agenda Why go Mobile? Why Navara? Challenges to going Mobile?
Presentation transcript:

Forecasting Data Center Power Requirements: Tips from the Trenches Frank Bereznay Moses Chu IBM

Agenda Overall Facility Utilization / Usage Profiles Measuring Power Usage at the Equipment Level Reporting and Forecasting Techniques Summary

Facility Overview Two Story Facility Built in the early 1990’s to accommodate mainframe class equipment. 2 UPS Systems Primary UPS (A/B) 2,400 KW Secondary UPS (C/D) 600 KW  Added later 3,500 Items Connected to UPS Systems Equipment Mix Described as typical for today’s Data Center. Newer blade farms creating hot spots for A/C systems

Initial Measurements There were a lot of opinions about the overall utilization profile for the UPS systems, but nobody had hard empirical data. A low tech ‘clip board’ agent was installed and activated at the UPS panels at four hour intervals.

Initial Measurements

Usage Profile by Equipment Type

Measuring Power Usage at the Equipment Level Not as easy as it sounds. Engineers were reluctant to open up the back side of PDU cabinets to attach reading devices. Power cables coming out of the cabinet were not labeled. Similar situation at equipment end of power run.

Measuring Power Usage at the Equipment Level Looked for some equipment documentation on actual power usage. Generally speaking, the documentation only provided rating factors for the circuit breakers. Blade servers were the exception, they provided actual power calculators. Looked online (and the CMG proceedings) for articles providing this kind of information. Came up empty.

Measuring Power Usage at the Equipment Level Pursued two efforts in parallel Captured before and after power readings at the UPS level for any change that projected a 5KW or greater impact Worked with staff at a newer Data Center that had the capability to provide circuit level power usage profiles Developed spreadsheet of findings and created some initial forecasts

Measuring Power Usage at the Equipment Level Initial forecasts tended to underestimate the impact of power events. Part of the learning curve for this type of analysis. A ‘life cycle’ usage profile for equipment types began to emerge from the dual measurement efforts being conducted.

Measuring Power Usage at the Equipment Level

Reporting and Forecasting Techniques All data capture and analysis was done in EXCEL, nothing fancy. Experimented with a variety of reporting techniques before we came up with the final set of reports.

Reporting and Forecasting Techniques

Summary Primary goal of the paper was to share some lessons learned. Power analytics are fairly straightforward. The data can be elusive and difficult to get. The paper contains a table of power factors developed over time.

The End Questions??? Article References Power Monitoring cessId= cessId= Avoid Common Pitfalls when Calculating Data Center Power Loads d80_gci _mem1,00.html?track=NL- 455&ad=718537USCA&asrc=EM_NLN_ d80_gci _mem1,00.html?track=NL- 455&ad=718537USCA&asrc=EM_NLN_