GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

GEOSS Task AR-09-01b Architecture Implementation Pilot AIP Phase 4, (AIP-4) AIP Task Team February 2011.
GEOSS Task AR-09-01b Architecture Implementation Pilot AIP Phase 4, (AIP-4) AIP Task Team February 2011.
GEOSS Architecture Implementation Pilot, Phase 3 - Call for Participation - George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC December.
GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
GEO Task AR Architecture Implementation Pilot, Phase 2 (AIP-2) Kickoff Workshop NCAR Mesa Laboratory September 2008.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
GEOSS Task IN-05 Architecture Implementation Pilot AIP-5 Point of Contact: George Percivall Open Geospatial Consortium (OGC) March 2012.
Hervé CAUMONT OGC Interoperability Program Team
Successful Implementations for SBAs using GEOSS Interoperability Arrangements George Percivall The Open Geospatial Consortium Jay Pearlman, IEEE Nadine.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 4 (AIP-4) Nadine Alameh, George Percivall, Ingo Simonis Open Geospatial Consortium (OGC) GEOSS.
SIF Status to ADC Co-Chairs
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
GEOSS Common Infrastructure (GCI)
Digital Earth Communities GEOSS Interoperability for Weather Ocean and Water GEOSS Common Infrastructure Evolution Roberto Cossu ESA
GEOSS Community Portal Recommendations Team Report.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium Task AR Point of.
Multidisciplinary interoperability To build Operating Capacity Initial (IOC): extend current GEO IP3/AIP-2 interoperability systems in Forest, Biodiversity,
ESIP Air Quality Workgroup and the GEO Air Quality Community of Practice collaboratively building an air quality community network for finding, accessing,
The Multi-disciplinary Interoperability research challenges: EuroGEOSS and EGIDA projects Stefano Nativi National Research Council of Italy (CNR ) GEPW-5.
A Global Agriculture Drought Monitoring and Forecasting System (GADMFS) Meixia Deng and Liping Di.
GEOSS Task AR-09-01b Architecture Implementation Pilot Nadine Alameh, Ph.D. Open Geospatial Consortium (OGC) GEOSS Interoperability.
GEOSS Architecture Implementation Pilot (AIP) 15 th ADC Meeting Brazil February/March 2011 George Percivall Open Geospatial Consortium Task lead AR-09-01B.
Global Earth Observing System-of- Systems (GEOSS) Architectural Framework Doug Nebert FGDC, U.S. Geological Survey February 2008.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
Vision and architecture of GEOSS Information System GEOSS Design and Evolution George Percivall The Open Geospatial Consortium (OGC) GEO Task IN-05 coordinator.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ENV proposal meeting, Geneva, Sep. 24, GCI Presentation Joost van Bemmelen, ESA
GEOSS Architecture Implementation Pilot, Phase 3 - AIP-3 Initial Concepts - Hervé Caumont George Percivall Open Geospatial Consortium GEO Task AR-09-01b.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
GEOSS Common Infrastructure Internal Structure and Standards Steven F. Browdy (IEEE)
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
ADC Portal & Clearinghouse GEO Architecture and Data Committee 2-3 March 2006 George Percivall OGC Chief Architect
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
1 ISO WAF Community Catalog Product Access Servers Registry Clearinghouse(s) GEO Portals Community Portals Users Client Apps GetCapabilities ISO
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
GEOSS Architecture Implementation Pilot - AIP-2 Results - AIP-3 Initial concepts George Percivall Open Geospatial Consortium GEO Task AR-09-01b Task POC.
Reference Architecture and Agile Development Presentation to NASA Standards Process Group Reference Architecture workshop at the ESIP Federation Meeting.
GEOSS Common Infrastructure: A Practical Tour Doug Nebert U.S. Geological Survey AIP-3 Kickoff March 2010.
GEOSS Task AR-09-01b Architecture Implementation Pilot AIP Phase 4, (AIP-4) Ingo Simonis Open Geospatial Consortium (OGC) ADC 17, Salzburg September 2011.
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2) George Percivall, Open Geospatial Consortium GEO Task AR-09-01b Task POC 2 February 2009.
Observation Integration across Disciplines in the GEOSS Architecture Implementation Pilot George Percivall and Bart de Lathouwer The Open Geospatial Consortium.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
Towards a New Phase of GEOSS Implementation : The GEO Work Plan Alexia C. Massacand GEO Work Plan Coordinator
GEOSS Task AR-09-01b Architecture Implementation Pilot AIP Phase 3, (AIP-3) George Percivall Open Geospatial Consortium GEO Task AR-09-01b Task POC ADC.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
GEO Task AR-09-01B AIP-3 Kickoff Workshop Closing Plenary ESA-ESRIN Frascati, Italy March 2010.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot GEO Task AR Team Representatives: - Doug Nebert, USA/FGDC - Larry.
Architecture Implementation Pilot, Phase 2 (AIP-2) presentation to ADC-10 meeting, Stresa, Italy AIP Phase 2 Progress including demonstration of Transverse.
GEO Task AR Team Representatives: Doug Nebert, USA/FGDC
ESA-ESRIN Frascati, Italy March 2010
George Percivall, Open Geospatial Consortium
George Percivall Open Geospatial Consortium
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
GEO Task IN-05 Architecture Implementation Pilot, Phase 5 AIP-5 Kickoff Workshop UNEP Geneva 3-4 May 2012.
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
GEO Architecture Implementation Pilot
Workplan for Updating the As-built Architecture of the 2007 GEOSS Architecture Implementation Pilot Session 7B, 6 June 2007 GEOSS Architecture Implementation.
GEOSS Architecture Implementation Pilot, Phase 2 (AIP-2)
George Percivall September 2008
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
GEOSS Architecture Implementation Pilot, Phase 3 AIP-3 Initial Plans – Drought Scenario - presentation to ESIP - George Percivall, Open Geospatial Consortium.
GEOSS Future Products Workshop March 26-28, 2013 NOAA
Geospatial Service Architecture Viewpoints
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP

GEOSS Architecture to meet Societal Needs Access and Processing Web Services Reusable Components Reusable Components Service Oriented Architecture Data Sharing Principles Implementation Data Sharing Principles Implementation Harmonization of data, metadata & products Interoperability across registries

GEO Task AR-09-01b Architecture Implementation Pilot Advance Societal Benefit Areas by piloting new process and infrastructure components for GCI and the broader GEOSS architecture Demonstrate and document results to inform GEOSS Development Baseline progress “fostering interoperability arrangements and common practices for GEOSS”

Operational Capability Operational Capability User Needs, Scenarios User Needs, Scenarios Design, Develop, Deploy Design, Develop, Deploy ADC activities including: Architecture Implementation Pilot (AIP) Task AR-09-01b GEOSS Common Infrastructure (GCI) Task AR-09-01a support persistent implementation requirements SBA Tasks, UIC, CBC, STC A process, elaboration of GEOSS Architecture

AIP Evolutionary Development Phases has piloted the GEOSS 10 Year Plan Architecture AIP-1 –Kickoff: June 2007 –Result: "Core" Architecture defined most of the GCI IOC – Architecture Workshop AIP-2 –Kickoff: September 2008 –Result: SBA implementations of common cross- cutting architecture AIP-3 –Kickoff: March 2010 –Result: Enabled data sharing and network building in GEOSS SBA communities

Architecture Progress and AIP-3 Results Bold vision endorsed 5 years ago Architecture vision has now been demonstrated Ministers should invest in their agency’s developments consistent with GEOSS plan

DevelopmentActivities Kick-offWorkshop Call for Participation ConceptDevelopment PersistentOperations(AR-09-01a) Participation ArchitectureDocumentation Updates for each step Baseline AR-09-01b Architecture Implementation Pilot Evolutionary Development Process Operational Baseline and Lessons Learned for next evolutionary spiral Continuous interaction with external activities AIP Development Approach

GEOSS Architecture Implementation Pilot, Phase 3 (AIP-3) Build on GCI and Community Services Refine SBA Scenario process Results in time to support Ministerial Summit “fostering interoperability arrangements and common practices for GEOSS”

AIP-3 Focus Areas Technology Areas –Services Use Cases –Data Harmonization –Data Sharing –Semantics SBAs addressed –Energy –Disaster Management –Climate Change and Biodiversity –Water Drought –Health: Air Quality

AIP-3 Working Groups and Leaders Disaster Management –Didier Giacobbo –Arnaud Cauchy Water: Agricultural Drought –Will Pozzi –Stefano Nativi –Liping Di –Brad Lee Health: Air Quality –Stefan Falke –François Marques Biodiversity and Climate: Ecosystem evolution and Arctic SDI –Doug Nebert –Stefano Nativi Energy: Environmental Impacts –Lionel Menard –Isabelle Blanc End-to-End Engineering –Nadine Alameh –Josh Lieberman –Larry McGovern Data Harmonization –Herve Caumont Data Sharing Guidelines –Steve Browdy Vocabularies and Semantics –Cristiano Fugazza –Roberto Lucchi –Masahiko Nagai

AIP Reusable Process for SBA Integrators Scenarios: end user view of the value of GEOSS –Focused on topics of interest to a community –Occur in a geographic Area of Interest (AOI) –Steps in a scenario are mapped to Use Cases Engineering Use Cases support SBA Scenarios –Use cases for discovery, data access, etc –Utilize Standards & Interoperability Arrangements Reusable service oriented architecture –Leverages ‘operational domain value’ through interoperable services

Architecture Viewpoints Information Viewpoint Computational Viewpoint Engineering Viewpoint Implementation/Development Viewpoints in “Reference Model - Open Distributed Processing (RM-ODP)” ISO/IEC Technology Viewpoint Enterprise Viewpoint Community Objectives Business aspects: purpose, scope and policies What for? Why? Who? When? Information sources and models What is it about? Types of services and protocols How does each bit work? Solution types: distribution infrastructure How do the components work together? Implementation system: hardware, software, distribution With what? Abstract/Best Practices

GEOSS Information framework GEOSS SoA Information Viewpoint

Components deploy Services GEOSS Clearinghouse GEO Web Portal GEOSS Common Infrastructure Components & Services Standards and Interoperability Best Practices Wiki User Requirements Registries Main GEO Web Site Registered Community Resources Community Portals Client Applications Client Tier Mediation Tier Community Catalogues Alert Servers Workflow Management Processing Servers Access Tier GEONETCast Product Access Servers Sensor Web Servers Model Access Servers Test Facility Mediation Servers

AIP coordinates with other GEO Tasks DI-09-02: Multi-Risk Management DI-06-09: Use of Satellites for Risk Management WA-06-02: Droughts, Floods and Water Management WA-06-07: Water Resource Management BI-07-01: BON EN Energy Enviro. Impact HE-09-01: Info Systems for Health HE-09-02: Monitoring and Prediction for Health US-09-01: User Engagement DA-06-01: Data Sharing Principles DA-09-01: Data Management DA-09-02: Data Integration and Analysis DA-09-03: Global Data Sets AR-09-02: Interoperable Systems for GEOSS AR-09-04: Dissemination and Distribution Networks

EC FP7 Projects Participating in AIP Current in AIP-3 –EnerGEO, –EO2Heaven, –EuroGEOSS, –GENESIS, –GIGAS, –GIS4EU, –SAFER, –UncertWEB New contributions possible: –ISTIMES - DM –DEWFORA- Drought –ENDORSE: "Energy Services for GMES" - fp7.euwww.endorse- fp7.eu –GeoViQua –GLOWASIS - Water –(Current GCI call)

GEOSS AIP Phase 4 (AIP-4) SBAs: Increasing implementation of GEOSS with CoPs Data: Foster access to EO Priority Observations consistent with Data-CORE and Interoperability Arrangements. GCI: Utilize the agreed components baseline DRAFT Schedule and Priorities

References GEO –earthobservations.orgearthobservations.org GEO Architecture Implementation Pilot – GEOSS registries and SIF –geossregistries.infogeossregistries.info George Percivall Nadine Alameh