WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.

Slides:



Advertisements
Similar presentations
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Advertisements

Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
Florida Water Forum Everglades Restoration June 3, 2011.
The South Florida Watershed
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Comprehensive Everglades Restoration Plan Picayune Strand Restoration Project Janet Starnes, Principal Project Manager Office of Everglades Policy and.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
National Park Service - DOI Everglades National Park Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project.
Bayou Dupont Sediment Delivery – Marsh Creation #3 (BA-164)
 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.
Summary of Work Performed for the South Lee County Watershed Plan Update (2009) Presentation to Bonita Springs City Council By Roger Copp, A.D.A. Engineering,
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Of America’s Everglades & the South Florida Ecosystem the Restoration.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Framework Agreement Principals Meeting #5 March 23, 2015 Everglades Water Quality Restoration.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Lake Okeechobee Regulation Schedule Study Lieutenant Colonel Andrew Goetz U.S. Army Corps of Engineers Jacksonville District Lieutenant Colonel Andrew.
Acme Basin B Discharge Public Workshop May 22, 2002 COMPREHENSIVE EVERGLADES RESTORATION PLAN.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River Management Coordinating Council September 24, 2007 Loxahatchee.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
Water Resources Advisory Commission January 5, 2006.
Herring River Restoration Project “Return of the Tide” Low-Lying Roads 0% Design Public Meeting February 4,
River of Grass Phase I Planning Water Resources Advisory Commission Issues Workshop February 3, 2009.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Water Resources Advisory Commission Lake Okeechobee Committee January 25, 2006 Susan Gray, Ph.D.
PICAYUNE STRAND RESTORATION PROJECT PUMP STATIONS PRELIMINARY DESIGN South Florida Water Management District Water Resources Advisory Committee April 6,
Tracey Piccone, P.E. August 10, 2004 Tracey Piccone, P.E. August 10, 2004 STA-1W Cell 5 Limerock Berm 2003 Outstanding Project of the Year Palm Beach County.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
WRAC Acme Basin B Discharge Project February 2, 2006.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Surveying principles 1 Tooele Valley Groundwater Change Application Guidelines S. Ross Hansen P.E., L.S. Region Engineer 9/7/2011 Tooele Water Users Workshop.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Planning Commission Study Session: Preferred Plan July 23, 2015.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Herring River Restoration Project “Return of the Tide” Concept for marsh level crossing at High Toss Road February 11, 2016 Council on Aging Wellfleet,
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Sustainable Vineyard Practices Replanting Strategies & Economics December 13, 2012 Conditional Waiver of Waste Discharge Requirements Vineyards in Napa.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Presented by Cory Foreman
Manchester’s CSO Program: A Look Behind and a Look Ahead
Integrating Wetlands and Watershed Management: Lessons from the U.S.
Water Quality Protection Zones
Presentation transcript:

WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview

Everglades Restoration Accelerated Projects C-43 (Caloosahatchee River) West Reservoir EAA Reservoir Phase I/Boles & Cross Canals EAA Stormwater Treatment Area Expansion Picayune Strand (Southern Golden Gate Estates) Restoration C-44 (St. Lucie Canal) Reservoir / STA Water Preserve Areas Biscayne Bay Coastal Wetlands Phase I C-111 Spreader Canal

ACCELER8 Achieves Restoration Goals Faster Reduces excess stormwater deliveries to estuaries Provides over half of planned CERP surface water storage Earlier improvements to water quality Provides greater flood control and water supply management flexibility Focuses on CERP projects with Project Implementation Reports (PIR) in progress Provides greater opportunities for improved timing / hydropatterns to the natural system

EAA/STA-2 Expansion Cell 4 Overview

COMPARTMENT B - 9,500 ACRES - PALM BEACH COUNTY COMPARTMENT C -8,800 ACRES -HENDRY COUNTY

EAA STA – COMPARTMENT B INITIAL EXPANSION –STA-2 CELL 4 BUILD-OUT AREAS –NORTH –SOUTH North South

EAA/STA-2 Cell 4 PROJECT PURPOSE & BENEFITS Further improve water quality entering the Everglades Protection Area Develop design/construction sequence to be “flow capable” December 2006 Provide operational flexibility Provide public access opportunities

Purpose of BODR is to provide a platform for consolidation of design concepts that may be presented for technical and stakeholder review with the goal of obtaining comment and ultimate buy-in on the proposed design concept. Key elements of the EAA/STA-2 Cell 4 BODR include: BASIS OF DESIGN REPORT SUMMARY Site Investigations Design Criteria Development Hydrologic and Hydraulic Analysis Project Layout & Evaluation of Alternatives Conceptual Project Features Design Develop Opinion of Probable Cost Supporting Engineering Analysis

EAA/STA-2 Cell 4 DESIGN FEATURES 2,015 acre expansion to STA-2 –Approximately 2.3 miles wide and 2 miles long Submerged Aquatic Vegetation (SAV) –Average water depth 1.25’ to 1.5’ –Operating range 0.5’ to 4.5’

EAA/STA-2 Cell 4 Design Features Optimize the use of existing facilities: –Utilize existing STA-2 inflow infrastructure –Utilize existing STA-2 discharge infrastructure –Modify existing structure G-337A

EAA/STA-2 Cell 4 DESIGN FEATURES Utilize “Lessons Learned” from previous STA construction: –Degrade existing features – fish farm & PSTA cells –Fill ditches running parallel to flow (north to south) –Degrade farm roads running perpendicular to flow (east to west) –Perform preliminary site preparation work to facilitate inundation of interior cell to promote vegetation growth during construction.

Canal corridor between Cells 3 and 4 6 gated inflow control structures (66” RCP) with telemetry and remote operation capabilities 1 outlet control structure will have telemetry and remote operation capabilities. EAA/STA-2 Cell 4 DESIGN FEATURES

EAA/STA-2 Cell 4 IMPLEMENTATION TIMELINE Preliminary Site Survey & Mapping Complete Geotechnical Investigation and Mid-2005 Analysis Report Basis of Design Report April 2005 Comments Received April 2005 Preliminary Engineering June 2005 Intermediate Status Submittal July 2005 Final Plans & Specifications Oct 2005 Construction Start Jan 2006 Cell 4 Flow Capable Dec 2006

Discussion