DCS 6.03.2007 T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week 5.04.07 T.Karavicheva and the T0 team T0 DCS Answers to.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

The Detector Control System – FERO related issues
T0 offline status Alla Maevskaya Institute for Nuclear Research, Moscow 8 October 2007 ALICE offline week For T0 group.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Progress report Collaboration meeting 23-SEP-2009
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Status of NA62 straw electronics Webs Covers Services Readout.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
LKr status R. Fantechi.
T1 Electronic status Conclusions Electronics Cards:
TPC Detector Control System
R.TIEULENT - ALICE Offline Week
Presentation transcript:

DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team

KEY dates –Commissioning on surface: “C” part of the detector is at CERN and was checked last October. The “A” part will arrive to the lab at CERN from Finland mid March –Detector installation in UX: 30 March – 4 April for “C” part. No access till August, when the “A” part goes down (planned Aug). –Accessible for DCS: for tests in June, fully in August (DCS Commissioning )

T0-C is at CERN ready for installation T0-C T0-A T0-A arrived at CERN yesterday

SUB-SYSTEMS TO COMPLETE –HV/LV PVSS: Implemented in PVSS 3.1 and tested with final hardware. Already ported to 3.6, to be tested with the hardware. Action: Tatiana with her student FSM: Follows HMP and V0 design. Waiting for HW from repair. Target date: end February. Action: Tatiana. HW: –mainframe: delivered one week ago, but was broken (no boot screen). Returned to pool, no estimate for the repair time yet. Tatiana will check the status (DCS Commissioning )

Status [HV/LV] Hardware: SY1527 mainframe – in Lyon 3 x A1733N Power Supply Units –was tested by Electronics pool. A1733N are in T0 lab being tested -2 x A1533 LV Power Supply Unit, 6x10V/2.7A was received at CERN some days ago Software: 1. Use PVSS 3.6 t00_dcs project updated to 3.6 Framework FSM updated to 3.6 ALICE UI 3.0* 2. Upgrading software version From PVSS V3.1 to PVSS V3.6 done at home Institutes, not yet tested with final hardware. 3.Will be tested during the March *) Start testing

(DCS Commissioning ) –FEE fast PVSS: DIM server connected to PVSS was used for tests in October. DIM server will be upgraded in February; final PVSS implementation depends on delivery of electronics (7 different types of modules) but will be ready before installation. Action: Tatiana and her student. Not yet done( Electronics production not yet completed)

Status [ Fast electronics ] Delivered at CERN: -A2818,V2718 Orded: 2 NIM crates with power supplies (PS) PS: Wiener Power supply UEP22 (300W), ( +/-5V / 17A, +/-12V / 3.4A, +/-24V / 3.4A). - Crate: Wiener 5U NIM crate Crate UEN03 12 slot card cage. 2 VME crate PS: Wiener 0P Power- Supply U (+5V/100A, +/-12V/10A). – Crate: Wiener 0B06.3B5J1: Card-Cage 7219 VME64x BIN, Local PSU, 21x6U, RP0 access, Mag tolerant. The crates with PS are expected to be delivered to CERN in March/April Modules: Electronics production not yet completed Ordered: 2 CAEN LED 895B

(DCS Commissioning ) –FEE readout PVSS: not implemented. DIM server required to control DRM via A2818 or Ethernet – the software will be copied from TOF (Pietro Antonioli & Ombretta Pinazza), more details beginning of March. Action: Tatiana FSM: not implemented – target end March – action Tatiana HW CPDM/TRM: modules received from TOF last October, partial setup exists. Final modules to be delivered in March

Status [ Readout electronics ] Delivered at CERN: 2 TRMs, 1 CPDM, A2818 card, T0 Alice box -DRM (prototype delivered at CERN last weekend) was tested in Bologna DRM final version –end of April Ordered : A3486, A1676,A3000(filter) Software for DCS will be provided by TOF group : 1.PVSS project to control ALICE BOX 2. PVSS project to control DRM

Cabling for CAEN Easy 48V service power To power control part of the Easy crates/modul es Propose to add small power supply in same rack as branch controller We will take care of PS and cabling (From Andre Augustinus) Taken care of by DCS In UX racks In CR racks

Status [Laser Calibration] LaserAttenuator Ethernet-RS232 interface (Digi One) Hardware: ready for installation Software: 1. Standard: PVSS FSM PVSS exists, tested with hardware FSM: 1st version exists, but might be modified, depending on the calibration procedure(calibration procedure not yet fixed)

CFD Control (CANBERRA 454) ELMB&DAC for CFD. The versions tested in CERN: PVSS: 3.1 (3.1 with all patches) OPC server for ELMB: (now avaible requires.net Framework 2.0) JCOP Framework: (with installation tool - now avaible: for PVSS 3.1 and 3.0 for PVSS 3.6). ELMB Framework (now avaible: 3.3.3) I will try to update this to newest versions (including PVSS 3.6).

Crate control -L.Wallet will provide tools for VME crate Control. -NIM crate control (the same solution as for CFD) -readout VME crate (TOF solution)

[ T0 FSM Hierarchy ] T0_DCS T0_C FE Laser Calibration HVLV OR Delays CFDs Read-out Crate Control L0 input generator Attenuator TUT0 MPD TVDC TRM DRM NIM Crate 1-12 PMT 1-2 Show box T0_A ScalersVME Crate Read-out crate Device Intellectual Control LEDs

T0 DCS state diagram DOWNOADING OFFSTBY_CONFIGUREDSTANDBYREADY LOCKEDREADY MOVING_READY MOVING_STBY_CONF BEAM_TUNING MOVING_BEAM_TUN CALIBRATING DOWNLOADING GO_STANDBY CONFIGURE (run_mode) CALIBRATE (calib_mode) GO_BEAM_TUN GO_READY CONFIGURE (run_mode) CALIBRATE (calib_mode) GO_STBY_CONF GO_READY GO_STBY_CONF GO_BEAM_TUN CALIBRATE (calib_mode) CONFIGURE (run_mode) LOCK GO_OFF CONFIGURE (run_mode) GO_STANDBY UNLOCK STOP

INTEGRATION WITH OTHER ONLINE SYSTEMS Test in lab with part of DCS, DAQ, TRG will start in March