U.S. DOT T3 Webinar Mobile Device Technology TCRP Synthesis 91 April 10, 2012 Case Study LeeTran – Lee County, FL Mike Horsting, AICP 1.

Slides:



Advertisements
Similar presentations
Metro Transit INTELLIGENT TRANSPORTATION SYSTEMS (ITS)
Advertisements

Presented by: Chakman Choi, Baradhwaj Hariharan, Uday Sankar Kandolath Date: 4/3/07.
Real-Time Passenger Information Systems
Jeremy Siviter, IBI Group, Project Manager May 18th, 2011
PARK IT HERE! Real-Time Parking Information in Uptown Charlotte PARK IT HERE! Real-Time Parking Information in Uptown Charlotte Presenters: Cole Dagerhardt.
T RANSPORTATION D ISADVANTAGED B EST P RACTICES & T RAINING W ORKSHOP “ Maximizing ITS investments to reduce operating costs and provide the best possible.
Metro Transit Operations Improved Through Technology.
North Florida AACEi. Project History July 18, 2011 – Phase I FFGA signed at Florida Hospital ceremonies Nov. 3, 2011 – FDOT purchased the corridor from.
Introduction of FUTÁR System. Basic data of FUTÁR System Devices to be installed The investment cost of project: EUR Vehicle consolidated with.
Mobility Management Increasing Independence for Community Members.
WMATA Bus ITS Project Update Transit Signal Priority Briefing to the Traffic Signals and Operations Working Group April 21, 2005.
Human Centred Design of a smart phone alert application for drivers Annie Pauzié, Ifsttar/LESCOT, France
Copyright © 2014 Pearson Education, Inc. 1 Managers from across organizations are involved in developing and acquiring information systems Chapter 5 -
Enterprise Fleet Management Mobile Resource Manager - MRM.
Where’s My Shuttle? (.com) By David Mora and Matt Russell.
Effective Utilization of Advanced Public Transportation Systems (APTS) Technology 19th Annual Transportation Disadvantaged Best Practices and Training.
Chapel Hill Transit Want to know where your bus is?
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
1 Mobility Management in Rural Environments October 21, :45 – 3:15 p.m.
Transit Traveler Information CEE582. Fixed-Route Central ControlCustomer Information Wireless Data On-Off Load Data Radio/ Message and AVL Transmission.
Center for Urban Transportation Research | University of South Florida Technology Session: 21 st Annual Transportation Disadvantaged Best Practices and.
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
Civitas Workshop –Effective solutions for green urban transport 24 April 2012 Athens Alan Lewis, TTR on behalf of: Lars Elgaard Thomsen, Public Transport.
Creating Enormously Wireless Urban Transit Systems An overview of Red Ball Internet TRAX: Advanced GPS Tracking, Fleet Maintenance and On-Board Connectivity.
Evolving TSP to meet the needs of the ITS community 1.
CS410 - BLUE GROUP Final Presentation communicate2Me.
Server Virtualization: Navy Network Operations Centers
Leveraging Technology to Increase Ridership and The Passenger Experience Jeff Lougheed Regional Manager Trapeze Group Mississauga, Ontario - Canada.
Train Derailment & GPS Tracking with TransitVUE ® IDS and TPIS.
ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems? Carol Schweiger, Assistant Vice President ITS Georgia Annual Meeting.
The Role of ITS in Communicating with Transit Riders Carol Schweiger, Assistant Vice President ITS America 2007 Annual Meeting June 5, 2007.
Bus Management System in SEOUL Metropolitan Area.
THE MILESTONES OF MASS TRANSIT CS 410 Blue Group communicate 2Me.
One Call Transportation Services One Call Transportation Services Building on a Network.
Transportation Services Budget February 4, 2010 Josh Davis, Director 1.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
Intelligent Transportation System (ITS) Project Update TAC - July 21, 2015 Nick Perfili, FCDOT Department of Transportation.
Department of Transportation Transit Rebranding New Brand Identity City Council November 4, 2013.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
Data to Go: Mobile Device Serve Up Real-Time Transit Data Talking Technology and Transportation (T3) Webinar ITS Professional Capacity Building Program.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Communicating with Travelers Unit 8: Improving Transit Quality.
ITS PCB T3 Webinar October 21, 2008 Montgomery County, Maryland Advanced Transportation Management System Automated Parking Information System Operational.
Open Transit Data: Meeting Customer Needs Or – Where the Data Meets the Road Dan Overgaard Supervisor, Systems Development & Operations King County Metro.
PRE-PROPOSAL MEETING RFTA Solicitation No Automated Vehicle Locator (AVL) & Computer-Aided Dispatch (CAD) System and Related Services.
Security and the National ITS Architecture ITS America 2003 Session 19: The State of the Practice: ITS and Homeland Security May 19, 2003 Minneapolis,
EXPERIENCE | Transportation Adding Value for Economic Development Presented to: KCADC Economic Development Alliance September 29, 2006 Mobile Device Technology.
Rod Weis, Texas A&M University Lana Wolken, Texas A&M University Joe Richmond, University of North Texas Operating Your Own System Versus Contracting.
Michele Mueller Senior Project Manager Applying Intelligent Transportation Systems to Cross Border Issues TC / FHWA Regional Roundtable Mike Barnet Senior.
The Challenge  Traveler information offerings are evolving very rapidly  User expectations, technologies, and roles are all in motion  Agencies need.
Click to edit Master text styles 12/17/ Click to edit Master text styles 12/17/ Tom O’Neill Technology Department March 13, 2013 Discussion.
Vehicle Management And Tracking Software
Bus Detection Device For The Passenger Using GPS And Gsm Application Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Seamless Public Transportation Through ITS Louis F. Sanders Director, Technical Services American Public Transportation Association.
The Tale of The COMET: UPDATE – January 2015 Robert A. Schneider, PhD Executive Director of The COMET.
Camden County Travel Management Coordination Center Project Update Camden County WIB Board Meeting – March 26, 2008.
Traffic Management System Status Update February, 2008.
BIC 2013 National Conference Presented By: Tim Quinn, Executive Vice President Date: 27 October, 2013 Time: 15:00 to 16:00 Social Media, Accelerating IT.
Comprehensive Operational Analysis (COA) Collier Area Transit February 8, 2012 Report Findings and Recommendation s.
Real Time Bus Information Walt Lenz, Safety & Security Manager Cyndi Raskin-Schmitt, Manager of Communications Pinellas Suncoast Transit Authority St.
Indianapolis Public Public Hearing – Proposed 2014 Budget Thursday, August 15, 2013 Transportation Corporation.
Transit Technology Hampton Roads Transit. Hampton Roads Transit (HRT) provides public transportation for six cities in the South Hampton Roads region:
Partnering with Clients & Paratransit Providers for Brokerage Success.
About Blacksburg Transit Started in 1983 Grown from 8 buses to 46 Grown from 3 routes to 12 Operator staff has increased from 26 part-time operators to.
Microtransit Pilot In Sacramento
My Experience Procuring Intelligent Transportation Systems (ITS)
My Experience Procuring Intelligent Transportation Systems (ITS)
RTC RIDE Service Improvement Recommendations
GREAT TRANSIT RIDER EXPERIENCE
Presentation transcript:

U.S. DOT T3 Webinar Mobile Device Technology TCRP Synthesis 91 April 10, 2012 Case Study LeeTran – Lee County, FL Mike Horsting, AICP 1

Presentation Outline ► Lee County Background ► Situation and Need ► Identified Solution ► Technology Procurement and Installation ► Trouble-shooting ► Results and Benefits 2

Who is LeeTran? ► Lee County Transit – Fort Myers, FL ► County-wide bus route network ► 18 bus routes ► Bus fleet of 61 ► 3.1 million annual passenger trips ► Traditional transit rider and tourists 3

Where is Lee County? 4

Fort Myers Beach Dreaming… 5

Fort Myers Beach Reality… 6

Stakeholders ► Town of Fort Myers Beach ► Lee County Transit ► Lee County Department of Transportation ► State of Florida Department of Transportation 7

Identifying the Problem ► Tourism Destination  Great beaches and warm, sunny winters ► Island Community with Limited Access ► Significant to Severe Congestion ► Limited Parking ► Driver Behavior ► Limited Transit 8

Identifying the Needs ► Additional Passenger Information  Number one passenger request  Reduce the guessing  (When will the trolley be here?) ► Manage Congestion ► Give Transit the Advantage ► Reduce Road-Rage 9

Packaging a Solution ► Intelligent Transportation Systems  Real-Time Passenger Information  First at stops, then mobile devices ► Increase Capacity by Reducing Headways ► Dedicated Transit Lane over Bridge ► Free Parking ► Marketing Campaign ► Luggage / Gear Racks 10

ITS Requirements ► Web-based and Cost effective solution ► Real-Time Information must be:  80% accuracy for 10 minute predictions  90% accuracy for 5 minute predictions ► Vendor support for changes and upgrades ► LED displays at four key stop locations ► Expandable to other routes, vehicles and information mediums 11

Solution Procurement ► Solicitation - RFP ► Evaluation Criteria:  Stability  Recent Experience  References  Technical Proposal  Software Requirements  Price ► Initial 5 year contract with vendor 12

Functional Diagram 13

Installation and Testing ► Vehicle Installation ► LED Displays at Stations  Power Sources ► Initial learning period 1-2 months  Off-season time period  Quick accuracy  One route ► Test Launch and Monitor Monitor 14

Initial Information Sources ► LED Displays  Arrivals and Current Time ► Internet  Arrivals and Interactive Map ► SMS (phase II)  Text 15

Deployment ► Training  Dispatchers and Supervisors  Operators ► Marketing and Advertising  Brochures  Variable Message Boards ► Monitoring into Winter Season  Field Observations 16

Reality ► Seasonal Congestion too Severe ► Software Miscalculations ► Vehicles “Dropping-out” ► Inaccurate Predictions ► Operational Frustrations ► Solar-powered Signs 17

Fixing Reality ► Schedule-based Predictions ► Headway-based Predictions  “Loop Jobs” ► Accuracy Achieved 18

Expansion ► Added Information via Mobile Device ► Two additional routes  Entire beach zone ► Entire dedicated fleet installation ► All stops  Stop ID numbers 19

Pushback/Results ► “Our customers don’t use smart phones” ► SMS Text messaging ► Website ► Smartphone ► Alerts 20

Overall Improvements ► Improved Customer Satisfaction  No more guessing at 4 major stops ► Business Owner Satisfaction  Customer information  Extra business ► Accurate Real-time Information ► Positive customer feedback ► Ridership increase of 32% 21

Additional Benefits ► Dispatch  Vehicle location monitoring  On-time performance ► Additional Customer Information  Service Advisories and Delays  Planned service changes 22

Cost, Time, Staffing, Budgeting ► Initial procurement of $60,000  Hardware  Installation  First year operating costs ► Annual operating costs of $12,000 ► Lowered wireless costs after 5 years ► TIME! 23

Thank You! Mike Horsting, AICP 24