MaPMT Readout Workshop / Introduction MaPMT Workshop Imperial College 26/27 June 2003 Franz Muheim University of Edinburgh.

Slides:



Advertisements
Similar presentations
1 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim MaPMT L0 Electronics & Photo detector mounts o Report from meeting –at CERN 22 May 2003 and.
Advertisements

Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
Peter Križan, Ljubljana Peter Križan University of Ljubljana and J. Stefan Institute The HERA-B RICH counter.
D.Websdale: RICH Meeting LHCb RICH group meeting: Wednesday 10th November, in B40-SS-C01 at 14:00. Agenda: 1. The Photodetector Panel’s proposition.
CMS Physics Meeting, Dec. 6, Analysis Note on the Validation of the ORCA Simulation of the Endcap Muon CSC Front-end Electronics S. Durkin -- Ohio.
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
1 SciFi electronics meeting – CERN– June 20 th 2011 Some ideas about a FE for a SciFi tracker based on SiPM A. Comerma, D. Gascón Universitat de Barcelona.
University of Edinburgh
Detector Modularity for RICH Upgrade RICH upgrade meeting, Stephan Eisenhardt University of Edinburgh o Motivation o Photon Detectors o Module.
26/06/2003Nigel Smale University of Oxford Introduction The BeetleMA0 back-up solution. A readout chip that complies to the LHCb read out specifications.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
New Developments in Large Area THGEMs & APV Exercise INFN – Sezione di Trieste Carlos Alexandre Fernandes dos Santos 11/December/2014.
1 Beetle xtalk measurements with test pulse at NIKHEF, B1.4 and B1.5 Aras Papadelis.
D.Websdale, LHCC referees meeting, CERN,  Developments since 13 May meeting  Outcome of review on 24 June  HPD planning  MaPMT planning.
Review of Readout for the MaPMTs  Beetle chip (1.2 & 1.2MA0)  results with Heidelberg board RICH meeting, CERN, Stephan Eisenhardt University.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
J.Bibby--Oxford1 LHCb RICH MaPMT Electronics Workshops MaPMT Electronics Schemes. MaPMT Analogue.MaPMT Analogue. MaPMT Analogue-Digital 1.MaPMT Analogue-Digital.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Testbeam Studies of the LHCb Vertex Locator Modules Lisa Dwyer.
Preliminary Results of the Beetle Readout for the MaPMTs  Part 1: as presented on  Achievements since last LHCb week  Common Mode correction.
Development of the RICH Detectors in LHCb S. Easo Rutherford-Appleton Laboratory June 5, 2002 RICH2002 PYLOS, GREECE For the LHCb-RICH Group.
Cherenkov Counters for SoLID Z.-E. Meziani on behalf of Simona Malace & Haiyan Gao (Duke University) Eric Fuchey (Temple University) SoLID Dry Run Review,
Calorimeter upgrade meeting – Phone Conference– May 5 th 2010 First prototyping run Upgrade of the front end electronics of the LHCb calorimeter.
RICH SIMULATION USING GEANT4 S.EASO, RAL OBJECTIVES OF THE SIMULATION. CURRENT STATUS AND PLANS. INTEGRATION WITH LHCb SOFTWARE. SUMMARY.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
work for PID in Novosibirsk E.A.Kravchenko Budker INP, Novosibirsk.
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
Status of the Beetle Readout for the MaPMTs  history of events  documentation of setup  prospects of near future RICH meeting, CERN, Stephan.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Particle Identification in the LHCb Experiment Particle Identification in the LHCb Experiment III LHC Symposium on Physics and Detectors Chia, Sardinia,
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
ASIC Activities for the PANDA GSI Peter Wieczorek.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
M. Sannino for S. Cuneo - I.N.F.N. Genova1 Rich2 MAPMT Housing & Cooling Outdated designs and what is needed to get a final executive design Imperial College.
Beetle Readout for the MaPMTs: First Results from the Testbeam  history of events  documentation of setup RICH meeting, Zürich, Stephan Eisenhardt.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Particle Identification with the LHCb Experiment
Pad HPD Proposal 3 Nov 1999 C. Joram The Pad HPD as Photodetector of the LHCb RICH Detectors  General Design  L0 Electronics  R&D: Results + Future.
Jean-François Genat Fast Timing Workshop June 8-10th 2015 FZU Prague Timing Methods with Fast Integrated Technologies 1.
RICH meeting, F.Muheim1 Proposal for MAPMTs as Photodetectors for the LHCb RICH Franz Muheim University of Edinburgh on behalf of the MAPMT group.
M. Adinolfi – University of Oxford – MAPMT Workshop – Imperial College 27 June Status of the PINT chip M. Adinolfi University of Oxford.
MaPMT Readout with boardBeetle: First Experiences Beetle User meeting, Zürich, Stephan Eisenhardt University of Edinburgh  Testbeam experiences:
5 Gbps J. SMU 1 A Serializer for LAr Front-end electronics upgrade 1.Requirements and design philosophy. 2.Key features of the serializer.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
FPGA based signal processing for the LHCb Vertex detector and Silicon Tracker Guido Haefeli EPFL, Lausanne Vertex 2005 November 7-11, 2005 Chuzenji Lake,
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
1 SuperB-PID, LNF 4/4/2011 MAPMTsSilvia DALLA TORRE COMPASS experience with HAMAMATSU MAPMTs S. Dalla Torre.
Fabio, Francesco, Francesco and Nicola INFN and University Bari
CTA-LST meeting February 2015
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
Calorimeter Upgrade Meeting
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
Christophe Beigbeder/ ETD PID meeting
Multianode Photo Multipliers for Ring Imaging Cherenkov Detectors
on behalf of LHCb RICH Group
Turning photons into bits in the cold
Optical links in the 25ns test beam
Particle Identification in the LHCb Experiment
Particle Identification in the LHCb Experiment
Particle Identification with the LHCb Experiment
Setup for testing LHCb Inner Tracker Modules
The LHCb Front-end Electronics System Status and Future Development
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

MaPMT Readout Workshop / Introduction MaPMT Workshop Imperial College 26/27 June 2003 Franz Muheim University of Edinburgh

2 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Workshop Agenda & Goals o Outline of MaPMT project o Reports/Presentations –MaPMT/Beetle studies –Photo detector integration issues –Possible Readout schemes –Level-1 Electronics, PINT results –Plans for this summer o Define MaPMT read-out project –Produce list of tasks necessary to get job done –Identify conflicting requirements –Prioritise different options (if possible) –Planning of schedules and milestones –MaPMT plans and schedule o Hope for lots of fruitful discussions

3 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim MaPMTs for LHCb RICH o Multianode Photo Multiplier Tubes –Single photo tube containing 8x8 array of 64 dynode chains 2.1 mm pixel size, 0.2 mm gap –Bialkali photo cathode, UV glass window QE = 22 % at = 380 nm o Lenses –with one flat and one curved surface –Increases active area fraction to 85% –effective pixel size 3.0 mm o Readout Electronics –ASIC preamplifier chip with pipeline –Readout architecture L0 & L1 o Mechanics –Photo detector mounts & motherboard –Magnetic field shielding, mu-metal

4 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim MaPMT/Beetle Project o MaPMT R M64 with 8 dynode stages –gain:50000HV 800 V o Front-End electronics –Beetle1.2 chip –single photon equivalent 60 mV(2 mip) –signal / noise ratio40 –analogue or binary readout mode o MaPMT R M64 with 12 dynode stages –gain: 300’000 HV 800 V –Beetle1.2-MaPMT chip with gain adaption –single photon equivalent 30 mV(2 mip) –signal / noise ratio40 –analogue or binary readout mode

5 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim MaPMT Plans & Schedule o Read out the 8 dynode stage MaPMT –with Beetle1.2 in analogue and binary mode –using the Heidelberg board restricted to 12 channels Jan - June 03 o Read out the 12 dynode stage MaPMT –with Beetle1.2MA0 in analogue and binary mode –using the Heidelberg board, restricted to 12 channels April - June 03 o Read out all 64 channels of one or more MaPMTs –with the Beetle1.2/Beetle-MA0 in analogue and binary mode –with Beetle PCBoard July 03 - o Testbeam –Prepare and operate a cluster of MaPMTs in a testbeam, read out with the Beetle1.2 or Beetle-MA0 chip May - Sep 03

6 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Electronic Cost Comparison o Main Inputs –232 modules with 16 MaPMTs, 8 Beetle chips, 1024 channels –220 SFr/optical link, 190 SFr/ 4 copper links 5kSFr/ L1 board o Binary Electronics –232 optical links, 30 L1 boards1250 kSFr o Analogue Electronics –4x1856 copper links, 116 L1 boards2100 kSFr –TDR cost for comparison1600 kSFr –difference to binary 850 kSFr o Digital Electronics –1856 optical links, 78 L1 boards1970 kSFr –difference to binary 720 kSFr –Cost differences are understood –data links costs are rather robust O(  50 kSFr) –optimisation for L1 board necessary O(  100 kSFr) –absolute cost of L0 electronics needs to be reassessed

7 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Major Issues o MaPMT/Beetle studies –BoardBeetleJuly 03 –Testbeam13 Aug - 9 Sep o MaPMT type decision –8 vs 12 dynode stagesSep 03 o Binary vs analogue/digital readout –cost versus risks (common mode, comparator) –only decision possible now is analogue or digital –proposal -analogue or digital as baselineJune 03 o Design of L0 motherboard –includes cooling, on critical path Jan 04 –report from meeting at CERN o Software –Performance studies, robustnessSep 03

8 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Overall Schedule o 1 year old, –produced for June 2002 review, need to update o July 2002Resume design of Beetle chip done o Oct 2002Resume Motherboard design starting now o 1 Mar 2003Choose MaPMTs o Mar 2003Start tendering not started o 1 Oct 2003Place MaPMT Order o Jan 2004L0 F/E Electronics and Motherboard (MB) design completed o Mar 2004Start Photodetector testing o July % of MaPMTs delivered o Jan 2005L0 - F/E Electronics and MB R&D completed o Mar % of MaPMTs delivered and tested o Mar % production and testing of L0 and L1 units o June % of photodetector modules assembled

9 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Status of MaPMT Project o Large effort has started for MaPMT project in 2003 –Measurements of 8-dynode stage MaPMTs signal shape with Beetle1.2 has highest priority –Measurements with Beetle1.2MA0 are promising o More effort is needed –Need to catch up delays, 7 months for L0 Motherboard o MaPMT is baseline –More effort available –Need to re-think organisation of MaPMT project now –Many important decisions need to be taken soon

10 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Backup Slides

11 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Multianode Photo Multiplier MaPMT o Single photo tube containing 8x8 array of 64 dynode chains 2.1 mm pixel size, 0.2 mm gap o Gain: at 800 V o Bialkali photo cathode, QE = 22 % at = 380 nm o UV glass window, was borosilicate,  QE dE increased by 50 % Wavelength [nm] QE [%]

12 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Quartz Lenses o MAPMT active area fraction: 38% (includes pixel gap) o Increase with quartz lens with one flat and one curved surface to 85% o effective pixel size 3.0 mm 400 mrad 0 mrad no lenslens Demagnification (f -d)/f  2/3

13 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim 3x3 MaPMT Cluster Test o Measurements with –MaPMT: HV = -1000V o Data –subtract cross-talk and common-mode –Fit # of photo electrons per event: o Cherenkov ring, 6000 events o Observe in data background n pe = 6.96  p.e. o Expect from simulation n pe = 6.49  0.17 Single channel spectrum

14 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Electronics Costs Electronics Costs o Major cost differences in –data links –L1 boards o L0 Electronics –232 modules –16 MaPMTs, 1024 channels, 8 Beetle chips –4 data links per beetle, 128: 4 multiplexing, 40 MHz clock –cost very similar for all options o Binary Electronics –optical links to L1 board –32 : 1 multiplexing (1bit per data link) –232 optical links, 1 per module (was 2) –costs from John Bibby –cost per optical link 220 SFr, total 50 kSFr –30 L1 boards, 5 kSFr/board, total 150 kSFr –L1 costs reduced by 300 kSFr wrt to TDR

15 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Analogue/Digital Electronics Analogue/Digital Electronics o Analogue Electronics –similar to VELO, with copper links over 60 m –link costs include driver, differential link receiver and ADC(costs from Thomas Ruf) –4 x 1856 links, 190 SFr / 4 links, total data links 350 kSFr –L1 board input: 64 links = 16 cables –116 L1 boards, 5 kSFr/board, total L1 boards 580 kSFr o Analogue/Digital Electronics –similar to Inner Tracker, ADC at outer detector rim –need rad tolerant ADC (15kRad), –costs from Achim Vollhardt –4:1 multiplexing with 8bit ADC –1856 optical links, 252 SFr/link, total data links 470 kSFr –L1 board, input 96 optical links = 6 ribbons –78 L1 boards, 5 kSFr/board, total L1 boards 390 kSFr

16 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Comparator Review o Phone Meeting of Beetle Users –30 April 03 –comparing of notes –digital switching noise, 80 MHz, on analogue lines o Comparator Discussion –closed loop of understanding –small differences resolved –conclusions remain the same –3bits are marginal, –5bits has comfortable margin o Comparator in Beetle1.2 –3 bits, no access to negative offsets o Comparator in Beetle1.3 –5 bits, different sign for Offset and Delta IDAC –will be submitted in June

17 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim Allocation of Personnel o Agreed at RICH group leader’s meetingCERN, 26 Feb 03 o Immediate personnel requirements –Setup of read-out and testing A) and B)Edinburgh –Testing of BeetleMA0 B)Oxford –Production of PCBoard for C)Imperial College –Consulting for A) B) SW,JB,NS,DP –Procurement strategyok –Design of L0 motherboardCambridge, Oxford Genova –CoordinationFM o Additional personnel required in May –Cooling strategyGenova –Higher channel occupancyCERN, Edinburgh –Bleeder board for test beamCambridge –jigsUK/CERN –moulded lenses Genova

18 MaPMT Workshop, Imperial College, 26/27 June 2003 F. Muheim To Do List (on 28 April) o Read-out of 8-dynode MaPMT with Beetle1.2 –(re-)connect MaPMT done –measure analogue spectra with LEDdone –take data in binary modeJuly o Review of electronics cost –binary vs analogue vs digital read-outdone o Comparator review done o Decision on binary vs analogue –cost versus risks (common mode) ??? o Read-out of 12-dynode MaPMT with Beetle1.2 –testing of Beetle1.2MA0done –measure with LED analogue spectra done –take data in binary modeJuly