5/26/20161 Wellhead Protection A Pennsylvania Perspective Options for Municipalities in Carbon County, Pennsylvania Mr. Brian Oram, PG Professional Geologist,

Slides:



Advertisements
Similar presentations
Community Land-Based Wastewater Disposal in Pennsylvania Prepared by: Mr. Brian Oram, PG Wilkes University
Advertisements

Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Roamingwood Wellhead Protection Capture Zone Prepared by: Mr. Brian Oram, PG, MS Mr. Bill Toothill, MS Wilkes University Geo Environmental Sciences and.
Upper Providence Township Stormwater Management MS4 Program.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Prepared by: Earth Data N.E., Inc. August 19, 2008.
The Proper Location and Construction of a Residential Water Well.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Groundwater Resource Management- Carbon County
Water Issues Related to Marcellus Gas Drilling Activity Water Issues Related to Marcellus Gas Drilling Activity Bryan Swistock Water Resources Extension.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Paradise Stream Watershed Assessment – Preliminary Data Gap Evaluation Principle Investigator/ Presented by: Mr. Brian Oram, PG, PASEO Co-PI’s: Dr. Dale.
Paradise Stream Watershed Assessment Data Gap Evaluation Principle Investigator/ Presented by: Mr. Brian Oram, PG, PASEO Co-PI’s: Dr. Dale Bruns & Mr.
Engineering Hydrology (ECIV 4323)
Jefferson High School Compton Creek Research Project UCLA and Los Angeles Waterkeeper Funded by the Environmental Protection Agency.
Water Systems Mrs. Bader. Water Systems In this exercise, you will learn more about what makes up a watershed, track the movement of water through the.
Wellhead Protection Strategies: Keys to Success Prepared by: Mr. Brian Oram, PG, Licensed Driller, PASEO B.F Environmental Consultants and Wilkes University.
When It Rains, It Drains An overview of Stormwater Management.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Water Resources Chapter 13. Questions for Today  Why is water so important?  Does everyone have access to clean and healthy water  Describe the three.
Water Cycle and Watersheds
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Marcellus Gas Drilling and Water Resources PA’s abundant water resources - a blessing and a concern Bigger rigsMore wastewaterMore waterMore disturbance.
Planning for Groundwater in Lafayette County August 2, 2006.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
New Hampshire’s Public Water Systems Climate Change Challenges 2014 Annual Meeting Robert Scott, Commissioner, New Hampshire Public Utilities Commission.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
10/15/20151 Ground Resource Management Luzerne County, Pennsylvania Mr. Brian Oram, PG Professional Geologist, Soil Scientist, PASEO, Certified Geothermal.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Movement of water Precipitation driven by gravity Evaporation driven by solar heating and wind Transpiration driven by solar heating, wind, root pressure,
SUPPLY, RENEWAL, AND USE WATER RESOURCES. HOW MUCH IS AVAILABLE? 97.4% is salt water 2.6% is fresh water Locked in ice caps and glaciers Polluted Salty.
Water Resources A river runs through it…. Water: The Universal Solvent One of the most valuable properties of water is its ability to dissolve. This makes.
Engineering Hydrology (ECIV 4323)
Drought and Water Supply Issues in. Water Supply Concerns Reduced supply - droughtIncreasing demand.
Water Resources Chapter 13. Questions for Today  Why is water so important?  Does everyone have access to clean and healthy water  Describe the three.
An Overview of our Community’s Stormwater Management Program
AOM 4643 Principles and Issues in Environmental Hydrology.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
 A large mass of moving ice. (frozen water)  A measure of the amount of dissolved salts in a given amount of liquid.
Picture this… You turn on your faucet to get a drink of water, but it is brown and stinks! You keep it running in hopes of “flushing” it out, but it doesn’t.
Chapter 7.2 (cont.) Groundwater as precipitation hits the ground, it may either (a) soak into the ground (infiltration) or this water has two alternatives:
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Location and construction of water wells
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
WATERSHEDS AND POLLUTION. What is a Watershed? A watershed is simply: an area of land where runoff collects and then is a water supply to a large lake.
WELLHEAD PROTECTION AND LAND USE “It’s Cheaper to Prevent Contamination”
An introduction to Private Water Systems
The Dane County Regional Hydrologic Study. Conceptualized groundwater flow system for Dane County Source: Bradbury and others, 1999.
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
Penn state recommends…
Engineering Hydrology (ECIV 4323)
Homeowner Responsibility
Water Cycle and Watersheds
Lab Director, Center for Environmental Quality Wilkes University
Human Effects on Hydrosphere Quality
Lab Director, Center for Environmental Quality Wilkes University
Fire Effects on Water September 27, 2006.
Human Activity and Ground Water
Human Activity and Ground Water
Human Activity and Ground Water
Comprehensive Land Use Planning and Zoning
Engineering Hydrology (ECIV 4323)
Homeowner Responsibility
Engineering Hydrology (ECIV 4323)
Presentation transcript:

5/26/20161 Wellhead Protection A Pennsylvania Perspective Options for Municipalities in Carbon County, Pennsylvania Mr. Brian Oram, PG Professional Geologist, Soil Scientist, PASEO, Licensed Well Driller Lab Director, Center for Environmental Quality Wilkes University Environmental Engineering and Earth Sciences Wilkes Barre, PA

5/26/20162 Presentation Sponsors Carbon County Groundwater Guardians C-SAW Program - Consortium for Scientific Assistance to Watersheds Program PA Association of Environmental Professionals Pocono Northeast Resource Conservation & Development Council Wilkes University

5/26/20163 Center for Environmental Quality Non-profit/ equal opportunity employer, is operated and managed, within the Environmental Engineering and Earth Sciences Outreach Programs Environmental and Professional Education and Training Applied Research Community and Business Outreach Programs Website:

5/26/20164 Components of the Water Cycle First The Ins Solar Energy Input Precipitation Condensation Well Injection Irrigation The Outs Evaporation Transpiration Infiltration Percolation Runoff Groundwater Flow Surfacewater Flow Well Pumping

5/26/20165 The Water Cycle Powered by the Sun- Solar Power

5/26/20166 Precipitation Types of Precipitation Natural Rain Snow Ice Hail Condensation/ Dew Man-Made Irrigation Wastewater Applications

5/26/20167 Interception Infiltration / Percolation Canopy Interception Percolation Infiltration Infiltration- Movement Water Into Soil Percolation - Water Movement Through the Soil

5/26/20168 Evaporation / Transpiration Evapotranspiration Evaporation- Driven by Thermal Gradient and Moisture Difference Stomata

5/26/20169 Runoff / Overland Flow When Rainfall Rate Exceeds Infiltration Runoff is Generated Low Infiltration Causes - Overland Flow- Loss Organic Material Uncontrolled Runoff Causes Erosion

5/26/ Groundwater Zone of Saturation

5/26/ Primary Aquifers in PA

5/26/ Well Geology

5/26/ Surfacewater & Groundwater They Are Related and Connected ! Local Water Divide Leak Confined Aquifer

5/26/ Groundwater Moves Slowly- feet per year

5/26/ Induced Recharge or Artificial Discharge Pumping Well - Artificial DischargeArtificial Recharge- Septic Systems

5/26/ Why Be Concerned about Groundwater Quality / Quantity ? In Carbon County - 45 % of residents serviced by private wells. Private Wells are not regulated by the PADEP or EPA Groundwater helps to maintain and sustain recreational areas and habitats, i.e., streams, lakes, wetlands, and most surfacewater features. Over withdrawal or groundwater mining can impact existing and future uses. Improper planning can result in groundwater contamination, which can cause a financial burden on individuals, business, and other entities in the County.

Bedrock Fractures and Fractured Zones High Yielding Well Fractured Zone Lower Yielding Well

5/26/ # of homes served by private water systems Avg. Change in homes served by private water systems per year % of all homes served by public water % of all homes served by private water system County Bradford13,44316,86520, Carbon6,59412,23517, Lackawanna9,95212,74515, Luzerne19,99424,66229, Monroe21,12937,24653, Pike9,44116,87524, Sullivan2,1474,7277, Susquehanna9,42315,21221, Tioga9,12611,88814, Wayne9,91319,09728, Wyoming7,2368,65710, Region118,398180,209242,

5/26/ Keys to Groundwater Resource Management and Planning Local or County regulations related to land-use, zoning, and wellhead protection. Well Siting, Drilling, and Construction Standards Groundwater Availability Analysis for Proposed Subdivisions or Proposed Expansions of Unregulated Water Systems. Community Education and Outreach Developing a Well Ordinance as part of the Act 537 Plan

5/26/ Groundwater and Surfacewater Withdrawals (Who does what?) Depending on the size of a project or proposed use, the use of water for consumption or withdrawal may be regulated and permitted by the local PADEP and River Basin Commissions with feedback from the other state and federal organizations. Local agencies can not allocate water. PADEP and River Basin Commissions are not a local or county planning agency – they are state/federal permitting agencies. PADEP Permits and Regulates – Public Water Systems or consumptive water users. River Basin Commissions are typically involved with consumptive use or withdrawals starting at 20,000 gallons or 100,000 + gpd. PADEP and River Basin Commissions do not contact local planning, but require local planning approval before permits.

5/26/ PADEP Regulates Monitors, and, Oversees the following: 1. Public Water System – has 15 service connections and services at least 25 individuals for 6 months during the year (This could be as few as 7- 3 bedroom homes). 2. Bottle Water Operations, Bulk Water Haulers, and Water Vending Machines

5/26/ PADEP Permits / Regulates Public Systems In Carbon County, Public Systems service only 55 % of the population.

5/26/ Why Private Well Owners Need Some Help ! A USGS survey found that 70% of private wells were contaminated. This contamination could result in acute or chronic health concerns. Over 45 % of Carbon County citizens use private wells.

5/26/ Problem in Pennsylvania Is the Lack of State and Federal Regulations and Local Support / Education Currently No Federal Or Pennsylvania State Regulations Related to Private Water Well Construction. – Pennsylvania one of 2 states that has no private water well construction standards, via regulation. – PA does not really have a comprehensive certification program for drilling contractors and operators. – Many local agencies do not have, require, or promote well ordinances, water availability analysis, water conservation, or water reuse. Great Opportunity for Grass-root Efforts !

5/26/ Protect Your Water Source Things a Citizen or Community Can Do Periodically Inspect Drain Surface Water Away Install Sanitary Seal and Proper Well Construction Annual Testing Maintain Records Start a Community Based Groundwater Education Program Carbon County Groundwater Guardians Proper Abandonment Chemical Storage, Disposal and Use Groundwater or Water Availability Analysis as part of Planning Proper Well Location Septic System Maintenance Recycle used Oil and Participate in Hazardous Chemical Disposal Programs Well Ordinance

5/26/ Protect Your Water Source Things Local Agency Can Do Zoning and Planning Process that includes a Groundwater Availability Analysis. Developing a Well Water Ordinance and Linking the Well Water Ordinance to Act 537 Planning (possible assistance with operating cost through Act 537 funding) Developing Well Construction Standards and Encouraging Groundwater Recharge (Low Impact Development and Stormwater Recharge Systems) Start or Support a Community Based Groundwater Education Program (Carbon County Groundwater Guardians, County Conservation District, and other partners)

5/26/ Importance of Groundwater Analysis and Planning Protect the health, security, and well-being of the current residences and water users. Protect the environmental and recreational activities that rely on surfacewater – Groundwater and Surfacewater are linked. Protect long-term economic growth by properly managing are resources. Evaluate projects to make sure that proposed densities or demands do not exceed the natural recharge capacity of the site or establish artificial recharge systems, such as: stormwater recharge and land-based wastewater disposal.

5/26/ As the area is converted from a natural woodland, grassland, or forest into developed lands, the amount of groundwater recharge decreases. Source: Dr. Dale Bruns, Wilkes University Less recharge

5/26/ Why Conduct a Groundwater Availability Analysis ? A preliminary desktop assessment could help to identify potential impacts on existing uses or other regulated facilities during the planning process and existing problems within the community. Desktop assessments can be used to develop site-specific criteria for well construction for unregulated projects and long-term sustainability. For larger projects, a preliminary analysis may compile enough information to show that a more comprehensive site-specific analysis would provide sufficient data to show if the withdrawal is sustainable. Helps to provide a proactive means of managing groundwater and water resources and helps to ensure the long-term reliability, quality, and sustainability of the system. The groundwater system helps to sustain the water cycle during droughts.

5/26/ Because of increased impervious areas, over-pumping of groundwater sources, stream base flows will decrease. Deep recharge could be reduced by 90 to 95% Source: Mr. Paul DeBarry, PE,Borton-Lawson Engineering Post Development Pre-Development

5/26/ Courtesy May, U of W Hydrology Under Natural Conditions

5/26/ Courtesy May, U of W Developed Conditions

5/26/ When Should a Groundwater or Water Availability Analysis As part of planning and local approvals for new subdivisions or expansion of unregulated water systems, the applicant would conduct a groundwater availability analysis. For the Carbon County area, the analysis should be requested when the proposed density is greater than 1 edu per acre or when the project is proposing the use of a central wastewater disposal system with a stream discharge and not a land-based wastewater disposal system. Groundwater availability analysis and hydrological description should be conducted by a licensed professional geologist. The initial desktop assessment should include a view of published and readily available data. Where the desktop evaluation indicates the potential for over-pumping of the aquifer, insufficient yield, poor water quality, or withdrawal of over 80 % of baseflow, the local regulations could require a more comprehensive hydrological analysis that could include the installation of test wells and conducting a short-term pumping test.

5/26/ Example Desktop Analysis Pre-Development 100 acre Forest Area Annual Rainfall – 45 inches Evapotranspiration – 24 inches Mean Annual Recharge – 12 ac-inches/year Drought Year Recharge – 7 ac-inches/year Normal Year Recharge Rate 100 acres * 12 ac-in/yr * gal/ac-in= 32,584,800 gallons per year or 89,273 gallons/day or 893 gpd/acre Drought Year Recharge Rate 100 acres * 5 ac-in/yr * gal/ac-in= 13,757,000 gallons per year or gallons/day or 376 gpd/acre Site capacity may be limited based on drought year recharge rate. The density should be greater than 1 acre per edu.

5/26/ Example Desktop Analysis Proposed Post-Development Impervious Area - Roofs /Driveways – 20 acres Impervious Area - Roads/ Lawns 10 acres Mean Annual Recharge – 12 ac-inches/year Drought Year Recharge – 5 ac-inches/year Water Demand – 85 units * 275 gpd= 23,375 gpd Density = 1.17 acres per edu Normal Year Recharge Rate 70 acres * 12 ac-in/yr * gal/ac-in= 22,809,360 gallons per year or 62,491 gpd 624 gpd/acre Drought Year Recharge Rate 70 acres * 5 ac-in/yr * gal/ac-in= 9,503,900 gallons per year or 26,038 gpd 260 gpd/acre Project is not groundwater mining, but demand is over 80% of drought year baseflow. WWTP 100 acre Parcel

5/26/ Test Well Analysis Individual Well Approach 1. Develop a Well Construction Standard for the Project. 2. Identify Geological Boundaries. 3. Install a number of test wells to confirm aquifer yield and quality. For example, a project with 85 units it may be advisable to install 4 to 5 test wells. 4. Document yield of each well and water quality. 5. Document direction of groundwater flow. 6. Conduct a short pumping test on one or more of the wells to simulate average daily withdrawal. 7. Monitor off-site wells. Site capacity may be limited based on drought year recharge rate. The density should be greater than 1 acre per edu.

5/26/ Test Well Analysis Community Approach Delineate Geological Boundary, Conduct a Fracture Trace Analysis and prepare a Predrilling Plan for Submission to PADEP for Review. 85 units * 275 gpd = 23,375 gpd (avg demand) 23,375 * 2 = 46,750 gpd (peak daily demand) 46,750 gpd * (1/12 hour/pc ) ( 1hr/60 min) = 64.9 gpm (peak demand) If formation typically has yields of 30 gpm, the system will require at least two production wells. Predrilling Plan for Submission to PADEP for Review. Drill wells to PADEP Standards and Conduct a Preliminary Pumping Test to Confirm Yield and Monitor a Number of Private Wells.

5/26/ Test Well Analysis Modeling Well Approach 1. Develop a Well Construction Standard for the Project. 2. Identify Geological Boundaries. 3. Use a Groundwater Model to simulate the installation of 85 wells with a withdrawal equivalent to peak daily demand.

5/26/ Additional Options for Local Agency Developing Water Well Ordinance that provides construction standards and an initial water quality and yield analysis. Developing Well Construction and Placement standards – beyond a minimum isolation distance from land-based wastewater systems, what about hazardous chemicals, manure storage, stormwater facilities, floodplains, etc.

5/26/ Why an Ordinance? Primary reasons for the ordinances included: Improper Well Construction Incidents of Well Contamination – Improper Siting – Interconnection with Contaminated Site – Induce Contamination – Lack of Grouting – No Testing Requirements to ensure potability Overuse of the Groundwater Aquifer. Online Directory of Model Ordinances

5/26/ Well Construction Specs Jackson Township, Monroe County, PA Casing must be 18 inch above grade Must use a sanitary well seal 19# casing must be at least 40 feet in length and 10 feet into bedrock (does not say the bedrock should be firm) All casing must be threaded and coupled or if welded, a certified welder must weld it. Annulus must be grouted with neat cement grout, Promix cement grout, or concrete grout to within approximately 5 feet of the top of the casing. Well must be disinfected – this does not mean long-term disinfection treatment, but shock disinfected.

5/26/ Well Construction Specs Paradise Township, Monroe County, PA Casing must be 24 inch above grade or the 100- year flood level of record Must use a sanitary well seal 19# casing must be at least 50 feet in length and 10 feet into bedrock (does not say the bedrock should be firm) Annulus must be grouted with bentonite grout. Well must be disinfected – this does not mean long-term disinfection treatment, but shock disinfected.

5/26/ Well Construction Specs Ryan Township, Schuylkill County, PA Casing must be 12 inch above grade Casing wall thickness must be at least inch (13#) Must use a sanitary well seal Casing must be at least 40 feet in length and 10 feet into bedrock (does not say the bedrock should be firm) Annulus must be grouted within 24 hours with bentonite grout or Neat cement grout (No disturbance – 2 hours bentonite and 48-hours cement). Well must be disinfected – this does not mean long-term disinfection treatment, but shock disinfected.

5/26/ An Ungrouted Residential Well A Properly Grouted Well

5/26/ Standard Well CapSanitary Well Cap Allows entry for insects and small animalsSealed to prevent contamination Well Construction Options for Private Wells

5/26/ Poor construction can affect drinking water quality for well user and regional well users Poor construction can contribute, promote, and facilitate pollution and contamination of the groundwater aquifer Proper construction can prolong the life and yield of the well Why Care About Well Construction ?

5/26/ A Properly Constructed (Sanitary) Residential Water Well Has: casing that extends at least 15 feet into firm bedrock or 40 feet below ground, whichever is greater casing of adequate wall thickness (meet PADEP Requirements Community Water Supplies- recommend 19#) a driveshoe on the bottom of the casing annular space should be grouted and casing should have a sanitary well cap. casing at least 12 inches above grade and 3 feet above flood elevation.

5/26/ Well Isolation Distances MONTGOMERY COUNTY HEALTH DEPARTMENT INDIVIDUAL WATER SUPPLY WELL CONSTRUCTION SPECIFICATIONS (partial listing) Delineated wetlands or floodplains (25 feet) Surface waters (25 feet) Storm water Systems (25 feet) Spray Irrigation/ Septage Disposal (100 feet) Farm silos / manure storage (200 feet) Septic Systems (100 feet) Septic Tanks/Holding Tanks (50 feet) Chemical Storage/Preparation Area (300 feet) More Information at

5/26/ Presentation Sponsors Carbon County Groundwater Guardians C-SAW Program - Consortium for Scientific Assistance to Watersheds Program PA Association of Environmental Professionals Pocono Northeast Resource Conservation & Development Council Wilkes University

5/26/ Wellhead Protection A Pennsylvania Perspective Options for Municipalities in Carbon County, Pennsylvania Mr. Brian Oram, PG Professional Geologist, Soil Scientist, PASEO, Licensed Well Driller Lab Director, Center for Environmental Quality Wilkes University Environmental Engineering and Earth Sciences Wilkes Barre, PA