Church Roof Repair 09/07/2014. Reason for Meeting Bylaws give Council authority to authorize repair. Council wants to keep congregation informed of actions.

Slides:



Advertisements
Similar presentations
Cathedral of the Immaculate Conception Project Information Session.
Advertisements

St Swithun’s Open Meeting 30 th June What is the state of the church? ( Hint, look around you) The architect’s report identified some urgent issues.
St Michael Parish Financial Report FY-09 (Mid Year) By St Michael Finance Council.
REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:
Lakewood School District REFERENDUM SEPTEMBER 30, 2014.
2010 Draft Municipal Budget
Tank Inspection and Maintenance Leo Yuskus, Senior VP Haley and Ward, Inc. WHY IS THIS IMPORTANT.
COMMUNITY ASSOCIATION BUDGETING DeLeon & Stang, CPAs and Advisors Allen P. DeLeon, CPA Janet Gorden, CPA LUNCH-N-LEARN.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
Finance 101 Thompson-Nicola Regional District tnrd.ca Hospital Districts City of Kamloops kamloops.ca.
o Why are we meeting?  Repair of steeple o Current problems o Recent history of repairs o Why must steeple be repaired? o Where do we go from here? o.
March 30, 2014 Congregational Meeting. Faithful at 50 Ad Hoc Finance Team Faithful at 50 Ad Hoc Finance Team – came out of Stewardship Team. Composed.
What Is EIFS Exterior Insulation and Finish Systems (EIFS) is a multi-layered exterior wall system that is composed of foam board insulation that.
Add your company name and logo to this slide.. Roof Repair After a Snowstorm How do I repair my roof? Selecting a roofing contractor Before making repairs.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
2015 Challenge £40,000 for Roof Replacement and Repairs = £32,000 Lady Chapel Roof Fund + £8,000 Roof Risk Fund.
 Complete failure of the roof membrane, as stated by GAF consultant from Trinity ERD  Elastomeric roof material did not completely adhere.
Collaboration Services (ViTS/VoTS) Maintenance Policy Kathy Hatley/CSO.
Downtown Parking Study City of Meriden Prepared by Fuss & O’Neill.
REGARDING RESERVES.  The operating budget for your association is prepared every year to project the next years expenses and determine the amount of.
Public Lighting – Victoria Presentation to Public Forum Craig Madden and Nick Innes Networks 22 June 2015.
3. The Roof Has Problems If the roof has water damage, it may be caused by old or damaged shingles, or improper flashing. It's cheap and relatively easy.
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
Constellation House Condominium 2009 Annual Meeting of Unit Owners April 18 th, 2009.
FAR PART 45 – Government Property
Master Policy and Unit Owner Policy June 11, 2015 Insurance.
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Church Finances Rectory.  Cost of building our New Church ~$8,000,000  Balance due as of was $1,979,201  $2,200,000 Swap Loan Terms ◦ Balloon.
LBT Q Engineering Review MCSC Mount Control System.
Space Coast Communities Association Cocoa Beach, Florida September 19, 2015 COMMUNITY ASSOCIATION BUDGETING.
2015/ 2016 General Fund Budget MIDDLE BUCKS INSTITUTE OF TECHNOLOGY MARCH 9, 2015.
Creating Capital Reserves CREATING CAPITAL RESERVES Glenn Wood Keith Matthews Tim Cool.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
FY Budget Presentation to Board of Finance March 17, 2014 Government Center Kevin Murray, Operations Manager Parks & Facilities.
2013 Business Planning Process. Business Planning Process Guidelines Budget Preparation Preparation of Business Plans Management Review Presentations.
Long-Term Program and Budget Planning Presentation to Session October 27,
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Working together for housing solutions First Nation Housing On Reserve Section 95 Housing Program Overview Pine Creek First Nation – October 13, 2015.
2016 Budget October 19, Budget Parameters County Commissioners request that the UCBDD maintain the same annual budget. The amount in reserve.
PRIIA 209 Equipment Capital Working Group Ron Pate, Director Cascades Rail Corridor and Washington State Department of Transportation Rail Division.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Chart A Pool Usage – Public Programs Before/After School 9/201310/201311/201312/20131/20142/20143/20144/20145/20146/2014 AM Laps
Littlerock Fire Station June 11, pm.   History of HOA Dues  Where Our Dues Go  FOD Expenses in $s  Where Our Dues Will Go  Summary Agenda.
Facilities Projects FILLMORE UNIFIED SCHOOL DISTRICT OCTOBER 6, 2015.
Managing Asbestos Cement Products in Your Home John Howell, Senior Toxicologist, Environmental Health Directorate.
North America Chapter of BIT Sindri Alumni Association presents Neil Pundit, President and Treasurer Association Treasury Report for
CITY COUNCIL OCTOBER 18, 2011 Central Park Gazebo Replacement.
PTA Treasurer Ensure the unit’s financial records are audited according to the bylaws before assuming his or her duties; Ensure the filing of the unit’s.
University Budget Process Stability of revenue sources compared to most businesses Role of financial statement- financial accounting at one point Operational.
Concho River Improvements February 18, River Improvements Project Consideration of approving matters related to Concho River improvements: Review.
A roof is an essential component of any building. It is the roof that protects the building from extreme climates such as rain, snowfall and wind. It.
 A car Jack  A wrench  A flat surface Put the car into park and apply the parking brake.
Simple Maintenance Can Prevent Water Damage Claims.
PROPERTY MANAGEMENT.
Caryl School Open Hearing March 26, 2007.
ADDRESSED, IT GETS WORSE.
Capital & Revenue T.
Foster Communications Coliseum roof update
Cathedral of the Immaculate Conception
Regulatory Compliances and Financial Controls for MCSTs
Cathedral of the Immaculate Conception
Lindleys Mill, Prospect Place, Sutton In Ashfield
Energy Savings Performance Contracts
Subsidy Surplus, Operating Reserve, and Replacement Reserve Funds
Lake Orion Community Schools Board Presentation
The projects in the following pages have been identified by our Building & Grounds Commission made up of local architects, engineers, contractors and finance.
Reserve Balances Update
Sidewalk Maintenance Program
Presentation transcript:

Church Roof Repair 09/07/2014

Reason for Meeting Bylaws give Council authority to authorize repair. Council wants to keep congregation informed of actions of this magnitude.

Areas of Concern

Wind Damage

Capstone Caulk

Cost of Repair North roof replaced in Still under warranty till No action required years of life expected. Main roof was installed in 1988 with rework done in Wind Damage requires replacement of entire roof. $25.2K to remove old and install new. – If deteriorated deck is found under the old roof, it will be handled as time and material. Parapet capstone and counter flashing for both roofs requires removal of old caulk and replacement with metal cap. $9K Total $34.2K

Plan Insurance has paid $ 8.5K for wind damage. Balance $25.7K. We will use current funds on hand to pay for remaining cost of repair. – Council has been frugal with expenditures in the past and has funds on hand to cover the remaining cost of the roof repair. We will Maintain $6K in building fund for emergent requirements. More formal maintenance plan will be instituted to help budget for future requirements. (i.e. Sprinkler system and elevator inspection/repairs) A capital campaign will be held in the future to raise funds for other building requirements as necessary at that time.