I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Fred Meyer, AF PM&AE 04 February 2010 Air Force Program Management.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Program Management Office (PMO) Design
November 8, 2007 Conference Brief RISC-IQ: Risk Integrated w / Schedule & Cost – Intelligent Quantification Applications for Systems Engineers This document.
Global Congress Global Leadership Vision for Project Management.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Course: e-Governance Project Lifecycle Day 1
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
Degree and Graduation Seminar Scope Management
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Project Management “Introduction to Project Management: Tools, Techniques, and Practices” BA 320 Operations Management.
Management of a Training Program January 12 – 14, 2009.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Effective Methods for Software and Systems Integration
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
Project Management Process Overview
Edward B. Farkas, Managing Director, Project Management Practice
IT Project Management Cheng Li, Ph.D. August 2003.
What is Project Management? How does it affect how you do your job?
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
NIST Special Publication Revision 1
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Department of the Interior CPIC Forum Department of the Interior CPIC Forum Better Control of Cost and Schedule Variance through Earned Value Management.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Applying Business Process Re-engineering
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
1 Alternative EVM Applications Not a One-Size-Fits-All.
Project Life Cycle.
Presented to: NDIA By: Keith Kratzert Date: August 16, 2006 Federal Aviation Administration Improving Program Performance at FAA.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Improving Air Force Scheduling Processes and Tools – A Demonstration.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
Working Draft 1 Integrated Baseline Review Sample Out-Brief Project Name.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Project Management Basics
The Project Plan Plan Your Work, then Work Your Plan
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Continual Service Improvement Methods & Techniques.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Carol Boser and.
Week 2 – Risk Planning & Identification. Risk & Risk Management.
NDIA - ICPM Program Planning and Scheduling Subcommittee Program Planning and Scheduling Subcommittee (PPSS) Initiative Presented by: Ms Lil Vayhinger.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Supplier Management Can’t live with them, Can’t live without them!
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
1 Analyze Top Savings Opportunities Step #7. 2 After completing the screening & sizing tools, you may use the Deep Dive tracker to identify the biggest.
PKB’s IMS “Cheat Sheet” for DoD Program Managers
Chapter 11 Project Management.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Establishing and Managing a Schedule Baseline
Applying Business Process Re-engineering
Mastering Change Control
CIS12-3 IT Project Management
Time Scheduling and Project management
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Fred Meyer, AF PM&AE 04 February 2010 Air Force Program Management and Acquisition Excellence Initiatives

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Today’s Discussion Quick Look Schedule Assessment using Generally Accepted Accounting Principles (GASP) Integrated Baseline Review (IBR) Process Developments 2

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Using the Tools 3 AF PM&AE has begun to use the GASP as a framework for developing quick-look integrated master schedule assessments Concise Easily understood Provides pros, cons and suggested improvements Assigns actions for program office and industry to work collaboratively

I n t e g r i t y - S e r v i c e - E x c e l l e n c e A valid schedule provides reasonable & credible information based on realistic logic, durations, & dates. 1. Complete: The schedule captures the entire discrete, authorized project effort from start through completion. 2. Traceable: The schedule logic is horizontally & vertically integrated with cross-references to key documents & tools. 3. Transparent: The schedule provides visibility to assure it is complete, traceable, has documented assumptions, & provides full disclosure of program status & forecast. 4. Statused: The schedule has accurate progress through the status date. 5. Predictive: The schedule provides meaningful critical paths & accurate forecasts for remaining work through program completion. An effective schedule is useful, helps align time-phased resources, & is built & maintained using a controlled process. 6. Usable: The schedule is an indispensable tool for timely & effective management decisions & actions. 7. Resourced: The schedule aligns with actual & projected resource availability. 8. Controlled: The schedule is built, baselined, & maintained using a stable, repeatable, & documented process. GASP Essential Element Statements

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Complete Schedules represent authorized discrete effort for the entire contract, with essential subcontracted or other external work or milestones integrated yet distinguishable from internal work. Traceable Schedules reflect realistic & meaningful network logic that horizontally & vertically integrates the likely sequence for program execution. Schedules are coded to relate tasks or milestones to source or dependent documents, tools, & responsible organizations. Transparent Schedules provide full disclosure of program status & forecast & include documented ground rules, assumptions, & methods for building & maintaining schedules. Documentation includes steps for analyzing the critical paths, incorporating risks & opportunities, & generating schedule health & performance metrics. Statused Schedules reflect consistent & regular updates of completed work, interim progress, achievable remaining durations relative to the status date, & accurately maintained logic relationships. Predictive Schedules accurately forecast the likely completion dates & impacts to the program baseline plan through valid network logic & achievable task durations from the status date through program completion. GASP Narratives for Valid Schedules

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Usable Schedules produce meaningful metrics for timely and effective communication and tracking and improving performance, mitigating issues and risks, and capturing opportunities. Schedules are robust and functional to help stakeholders manage different levels, groupings, or areas as needed. Schedules are developed and maintained at a size, level, and complexity such that they are timely and enable effective decision-making. Resourced Resources align with the schedule baseline & forecast to enable stakeholders to view & assess the time-phased labor & other costs required to achieve project baseline & forecast targets. Each program is unique & uses varying techniques to load, baseline, & maintain the time-phased resources at levels that are practical & produce meaningful & accurate projections. When resource-loaded schedules are used they enable flexible updates to resource requirements as conditions change. Whether or not resource-loaded schedules are used, cost & schedule data are integrated for internal & external reporting. Controlled Schedules are baselined & maintained using a rigorous, stable, & repeatable process. Schedule additions, deletions, & updates conform to this process & result in valid & accurate results for sound schedule configuration control & maintenance. GASP Narratives for Effective Schedules

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP / 14 Point Assessment Comparison 7

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e GASP Quick-Look Schedule Assessment

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 16 Integrated Baseline Review Challenges The purpose and importance of an IBR is not understood Focus is not on technical issues Often viewed as an Earned Value Management review Not seen as a risk reduction activity “Check the box” mentality PMs do not understand how to evaluate contract planning risks Little or no focus on cost/schedule/technical integration Risks not quantified in dollar terms Fixing the problem requires: Leadership that takes ownership and asks the right questions A consistent and repeatable IBR process with metrics Tailored training for all IBR participants

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 17 Meeting the Challenge Develop an Air Force Integrated Baseline Review (IBR) instruction and training package Provides a consistent IBR methodology Involves all functional experts – engineering, manufacturing, cost, logistics, contracts and EVM Designed as a collaborative process with industry Workshops prior to IBR progressively train teams, increase return on IBR investment and mitigate IBR risks Clearly defined and consistent data call Process and tools includes a contractor self assessment Provides for a comparative quantification of cost, schedule, technical, resources and all management process risks Need industry input and expertise to improve process

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 18 Transforming the Process Focus on results To be effective the process must be Consistent Collaborative Scalable Streamlined

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 19 Teams Program Info Artifacts & Weights Integration Swim Lane Workshops Technical, Schedule, Resources, Cost, Management,& Integration Actions Report Ongoing Actions Data Cleanup; Issue, Risk & Opportunity Discovery IBR Results Actions Library Go No-Go IBR Event

I n t e g r i t y - S e r v i c e - E x c e l l e n c e High-Level Program Information 20

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Team Attendees 21

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Technical Workshop Agenda 22

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Integration Points by Artifact 23

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Technical Swim Lane 24

I n t e g r i t y - S e r v i c e - E x c e l l e n c e IBR Go / No Go 25 Artifacts (Data Call) Readiness Points EarnedPoints earned by providing adequately formatted artifacts 64 Points Possible Maximum points possible given applicable artifacts (Up to 3 Points for each Required Artifact) 117 Readiness Score Quality & Amount of Required IBR Data (% of All Applicable Artifacts) 55% Essential% of adequately formatted Essential artifacts received 58% High IBR Risk Important% of adequately formatted Important artifacts received 50% Supplemental% of adequately formatted Supplemental artifacts received 17% Essential artifacts like the SOW, WBS, IMP drive the basic Go / No-Go decision for conducting an IBR. Important artifacts like a Master Phasing Schedule or supplier-provided IMS Health Metrics drive a GREEN Go decision. Having all of the above PLUS Supplemental artifacts like resource “sand” charts result in a BLUE Go decision.

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Actions Report 26

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 27 Benefits of Air Force IBR Process IBR Panic  IBR Ready  IBR Results Workshops are critical to IBR process success Technical assures we understand requirements and scope Schedule offers opportunities to improve the IMS Resources identifies and aligns staffing, vendors and facilities with schedule and cost Cost determines if budget targets are achievable Management processes assures baseline and management risk are working IBR yields meaningful results by helping to identify and mitigate risks along the timeline that ends with the IBR event and closeout Minimizes surprises & need for additional oversight

I n t e g r i t y - S e r v i c e - E x c e l l e n c e 28 Meeting the Challenge The Air Force, through PM&AE, will be leading the development a DoD IBR Guide to support OSD(A&T) in implementing the recommendations of the Defense Support Team on Earned Value Management Detailed guidance “How to” vice “What is” Focus on technical Risk-based methodology Standardize approach, outcome measures and after review reporting formats Leverage ongoing PM&AE internal IBR instruction Use the best practices from existing Army, Navy and Intelligence Community guidance and instructions