Illini Central Renovation Work For Mason City Rotary Summer 2008.

Slides:



Advertisements
Similar presentations
Wendover Renovation Presentation Presentation Overview Renovation Stages Before Now After How you will be affected Questions/Concerns.
Advertisements

This is only.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Mill Valley Middle School Modernization Summer 2011.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
West Chester University “Geothermal HVAC System Comprehensive Campus Plan – Phase I” September 16, 2008.
Christian Academy of Lawrenceburg Strategic & Infrastructure Investment Plan Christian Academy of Lawrenceburg Strategic & Infrastructure Investment Plan.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
 Today, the church has 82 members plus a growing number of children and offers 5 Sunday school classes each week for children and adults, as well as.
2014 Bond Issue Projects September 22, On August 5, 2014 the voters of South Lake Schools passed a $25 million bond proposal This PowerPoint will.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
Franklin County Technical School Performance Contract Project.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
Clark County School District Virtual High School and Vegas PBS Las Vegas, Nevada Project of Distinction New Construction JMA Architecture Studios 2010.
SHARON CITY SCHOOL DISTRICT Page 1 of 18. SHARON CITY SCHOOL DISTRICT Page 2 of 18 OPTION 1C – New Building on Case Avenue Site  Building Grades: K-6.
Central Cambria School District Jackson Elementary was built in 1967 and renovated in There are 261 students in Pre-K through grade 5 and we offer.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
”. Glendale High School is one of the cornerstones of what makes Tillsonburg and the surrounding area a special place.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
Trane’s DOE GHP Super ESPC Fort Knox Energy Program
Rogers High School Spokane, Washington The Lee Brockway Award for Renovations High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Walkerton Accommodation Review April 24, 2008 The following most recommended scenarios were reviewed by the Accommodation Review Committee.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Nutrition, Health and Safety Training for Early Childhood Educators.
Western Carolina University Town Hall Meeting May 6, 2003 Chuck Wooten Vice Chancellor for Administration and Finance.
Geothermal Heating & Cooling Digging Deeper for Energy Savings Luann T. Kolstad Business Manager Prospect Heights School District 23.
Community Resource Committee Report to City Council January 15, 2015.
Geary Public School 2010 Bond Issue Vote Tuesday December 14, 2010.
Project Status Project Phasing Questions 2 As of Today Project released for Bid February 7, 2011 Notice of Bid sent to 80+ Contractors on February 2,
Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning.
August 13, 2014 Information Technologies & Resources.
Eden Central School District Board of Education Meeting Eden CSD 2020 Project Update September 16, 2015.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
HENDERSON MIDDLE SCHOOL “The Grand Old Campus” CAMPUS FACILITY ISSUES.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Network Assignment N. Stewart- MEDT 7477 The school used for the networking mapping assignment is Madras Middle School. Madras Middle School is located.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Marietta Center for Advanced Academics: Grades 3-5 IDF This “mini-IDF” connects to the Media Ctr IDF MDF The media ctr. IDF connects everything in the.
Geothermal Energy System Progress Update. Will cut annual energy use by 50% Will reduce carbon dioxide emissions by 25,000 tons per year Will cut water.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
Community Engagement Meeting Taylor Early Childhood September 2, 2015.
Energy Conservation Building Upgrades Alma School District.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
SUMMER INTERNSHIP 2009 John Maxson ‘10. O’Riordan Migani Architects It is a small firm run by Joan O’Riordan and Joseph Migani. We mostly deal with smaller.
21 st Century Classroom Learning Environment Installation Process.
Woodland Public Schools Facilities and Safety Report For September 2016.
Madison Elementary School District
Facilities Focus Group
Building Services Summer 2016 Update
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Grunenwald Science and Technology Building
DIRECTOR OF OPERATIONS
Silver Lake Regional High School
Facilities Modernization Program
2007 Bond Issue Capital Improvement Program
Troy School District Bond Program – Series 1 Construction Update
Troy School District Bond Program – Series 1 Construction Update
Michigan Energy Summit | April 25, 2019
EAST PENNSBORO AREA SCHOOL DISTRICT
Zumbrota-Mazeppa School District Community Survey Results
Minuteman Vocational Technical Regional High School Progress
FY Capital Improvement Program Draft
Presentation transcript:

Illini Central Renovation Work For Mason City Rotary Summer 2008

Timeframe and Schedule This project had been planned for the Summer of 2008 and 2009, but our architectural firm and general contractor (BLDD Architecture Inc. and Felmley-Dickerson) said work could be done in one summer. This project had been planned for the Summer of 2008 and 2009, but our architectural firm and general contractor (BLDD Architecture Inc. and Felmley-Dickerson) said work could be done in one summer. We have moved the start date of school back to September 2 nd (from the 25 th ), but everything is on schedule and should be up and running when students return after Labor Day. We have moved the start date of school back to September 2 nd (from the 25 th ), but everything is on schedule and should be up and running when students return after Labor Day.

Main Campus Facility (Grades K-12) The main facility project was paid for using Health Life Safety Bonds The main facility project was paid for using Health Life Safety Bonds The Health Life Safety Code is the occupancy requirement of the state that all schools must adhere to The Health Life Safety Code is the occupancy requirement of the state that all schools must adhere to

Main Campus Facility cont’d Installation of new ceiling tile and the upgrade of lighting in classrooms, gymnasiums, and lobbies is also included as part of this project. Installation of new ceiling tile and the upgrade of lighting in classrooms, gymnasiums, and lobbies is also included as part of this project.

Main Campus Facility cont’d There will also be the installation of new heating/air conditioning units for the entire K-12 facility. There will also be the installation of new heating/air conditioning units for the entire K-12 facility. This will be a Geothermal Heat Pump System This will be a Geothermal Heat Pump System

Main Campus Facility cont’d 170 total pumps are being drilled behind the school 170 total pumps are being drilled behind the school –60 for the High School well field –110 for the GS/MS well field Wells will be feet deep Wells will be feet deep

Main Campus Facility cont’d Each classroom will have an individual heating- cooling unit with control. Instead of a system of controls for heating from a remote location, each teacher will control the environment from their own classroom. Each classroom will have an individual heating- cooling unit with control. Instead of a system of controls for heating from a remote location, each teacher will control the environment from their own classroom.

Main Campus Facility cont’d All teacher classroom materials, student desks, and other equipment is being stored in the gyms and cafeteria. All teacher classroom materials, student desks, and other equipment is being stored in the gyms and cafeteria. Kevin Meyer and his crew have been very busy this summer and should be commended for their hard work. Kevin Meyer and his crew have been very busy this summer and should be commended for their hard work.

West Campus Facility (serving grades Pre-K and Early Childhood The old catholic church facility will host our Pre-K and Early Childhood class needs. The old catholic church facility will host our Pre-K and Early Childhood class needs. There will be three classrooms and two offices areas. There will be three classrooms and two offices areas.