Understand the Present to Master the Future Johannes Gutleber Future Circular Collider.

Slides:



Advertisements
Similar presentations
Remote Sensing at the service of Natural Disasters Warning: the Contribution of the Supersites Concept Professor Stuart Marsh Co-Chair GEO Institutions.
Advertisements

State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Project Overview 2010 Programme FA: 14 June 2007 Start: 2 Sept 2007 Completion: 31 June 2011 Budget: €10,155,000 (EU), €155,000 (National)
Adaptations to Climate Change in Africa’s Water Sector: Contributions of the World Meteorological Organization Datius Rutashobya Climate and Water Department.
A successful public- private partnership Alberto Di Meglio CERN openlab CTO.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
ITIL: Service Transition
Future Circular Collider (FCC) Study
Rational Unified Process
A key quality attribute of a Future Circular Collider - Availability performance (RAMS) P. Sollander, Thanks to A. Apollonio, J. Gutleber, M. Lamont, P.
Patrick Janot Introduction  TLEP / FCC-ee u Physics, Experiments, Detectors break-out session l Conveners: Alain Blondel, Patrick Janot è Follows six.
Systems Engineering Approach to MPS Risk Management Kelly Mahoney Presented at the Workshop for Machine Protection in Linear Accelerators.
A Communication Strategy for the FCC study James Gillies, Head of Communications, CERN EuroCirCol kick-off meeting, 2 June 2015.
The Evergreen, Background, Methodology and IT Service Management Model
U.S. Department of the Interior U.S. Geological Survey Facing Tomorrow’s Challenges USGS Science in the Coming Decade Dr. Mark Myers Director USGS.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
Integrating aspects of interoperability, policy and governance FRIS: a research information infrastructure in Flanders euroCRIS Strategic Members meeting.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
The FCC Magnet Program: Challenges and Opportunities for HTS
1 Future Circular Collider Study Michael Benedikt CLIC Workshop 2014 Future Circular Collider Study Overview.
Committed to Connecting the World International Telecommunication Union Presentation Brief about ICTs Applications activities Telecommunication Development.
General news LCD monthly meeting Oct 28 th 2013 L. Linssen, CLICdp/LCD monthly meeting, 28 Oct
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
Future Accelerators at the High Energy Frontier
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Johannes Gutleber CERN Directorate of Accelerators & Technology September 22, 2015 H2020 EUCard3 Reliability & Availability Task RAMS Training Topic.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
330 registered participants Closing remarks. 2 Future Circular Collider Study FCC Kick-Off 2014 Discussion of all FCC aspects Refine scope of the study.
CERN Report (II) Rolf-Dieter Heuer ECFA Meeting Frascati 1 July
A successful public- private partnership Alberto Di Meglio CERN openlab Head.
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Alain Blondel TLEP VC TLEP study news.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CERN-US Relations and the LHC Program Rüdiger Voss Head of International Relations, CERN USLUA Annual Meeting, Argonne| November 12-14, 2014.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
A successful public- private partnership Alberto Di Meglio CERN openlab Head.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
A successful public- private partnership Maria Girone CERN openlab CTO.
OTF Business Information Standards and Integration for Sustainability Gahl Berkooz Richard Riff.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
ITIL: Service Transition
Project Cost Management
LHeC Coordination Meeting, 9 June 2017
Aesthetic Devices - Medical Devices Pipeline Assessment, 2015
1st FCC Infrastructure & Operation meeting
Attention CFOs How to tighten your belt and still survive May 18, 2017.
FCC Kick-Off 2014 Future Circular Collider (FCC) study: kick-off meeting & recent progress Frank Zimmermann BE/ABP 22 May 2014 thanks.
FCC summary report March 2015 Washington.
Future Circular Collider
CDR preparation V. Mertens IOWG
Grid related projects CERN openlab LCG EDG F.Fluckiger
Accelerator Reliability Information System
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Future Collider Projects at CERN
Vision for CERN IT Department
The Fuel Cycle Analysis Toolbox
Presentation transcript:

Understand the Present to Master the Future Johannes Gutleber Future Circular Collider

Scope of FCC European strategy update on particle physics “to propose an ambitious post-LHC accelerator project at CERN by the time of the next strategy update” CERN should undertake design studies for accelerator projects in a global context International collaborations to be set up during 2014 are at the core of the study!

Driving Forces What are the fundamental laws that govern nature? What is dark matter? Do supersymmetric particles exist? What are the smallest constituents of matter? ?

Scope of the Study Hadron collider (pp, ions) Lepton collider (e + e - ) Infrastructure determined by hadron 15 T = 100 TeV in T = 100 TeV in 80 km

FCC and OpenLab FCC provides a study case FCC provides framework to establish world-wide collaborations to - understand of emerging technologies - learn using emerging technologies - assess long-term fitness of technologies - identify long-term strategic partnerships FCC identifies future R&D needs FCC has long-term view - conceptual study until recommendations for projects

Study Preparation Team Study coordination M. Benedikt, F. Zimmermann Hadron collider D. Schulte Hadron injectors B. Goddard e+ e- collider and injectors J. Wenninger Infrastructure, cost estimates P. Lebrun Technology Physics and experiments e - p option Integration aspects O. Brüning High Field Magnets L. Bottura Hadrons A. Ball, F. Gianotti, M. Mangano Supercon- ducting RF E. Jensen e + e - Al. Blondel J. Ellis,P. Janot Operation aspects, energy efficiency, safety, environment P. Collier Cryogenics L. Tavian e - p M. Klein Specific Technologies JM. Jimenez Planning (Implementation roadmap, financial planning, reporting) J. Gutleber, F. Sonnemann

Work Breakdown Structure

Computing and Data Services ComputingComputing Networks & Data Transmission Data and Storage Archive & Availability Platforms & Tools SecuritySecurity Decades long data usage, ownership and licensing, format standardization, integrity, storage evolution/obsolescence Volume estimates, future trends, adequate end-user access needs and concepts On-site and off-site needs and constraints, embedded and safety-relevant systems End-user environments, software performance, world-wide infrastructures, ownership and cost models Technology outlook, infrastructure management and provisioning, application workflows, SCADA, DBs, data analytics, Gigascale modelling Cyber-security, regulatory aspects, contributions to risk management database Data Analytics

Study Case Early warning and co-scheduling of preventive interventions Develop availability improving modifications based on observations Establish a model of an accelerator for –Confirmation of expected behaviour in face of faults –Operator training –Design of upgrades and future colliders Achieve high availability and operation efficiency

LHC Availability Estimated 10 hour physics coasts No faults, or down time Observed 6 hour physics coasts Faults and down time mainly in no beam, setup & injection phases

Fault Drivers

Corrective Interventions LHC: 3087 / yr FCC: 12’500 / yr ?

Approach Analyze large quantities of historic monitoring data Confirm suspected correlations Derive prediction laws Detect yet-unknown patterns …followed by in Time Analytics

Study iTA Scale free streaming analytics Raw, transformed, secondary and derived data as input Multi data source “data lake” Timely processing and partial processing to achieve deterministic response

Study Timeline Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 Explore Report Study plan, scope definition Workshop & Review  contents of CDR Release CDR Workshop & Review: identification of baseline Study Workshop & Review, cost model, LHC results  study re-scoping? Elaborate

Contributions to the Study The study is, what people contribute to it Scope can be adjusted on the way Resources need to be estimated together with the study planning team Together, means will be worked out to complete resources according to agreed scope

Phase 1 (2014) Establish international collaborations –involve operation experts from external institutes –Involve IT experts from external organizations (academia and industry) Establish comprehensive catalogue of data analytics use cases for accelerator complex –To be done by operation experts Learn how to do data analytics –Involvement from external academia and industry needed Derive functional and performance requirements catalogue for a data analytics ecosystem that fits accelerator complex and experiment operation –To be done by computing experts

Phase 2 ( ) Understand today’s and emerging data analytics technologies in terms of functions and performance Quantify the functional and performance limitations of today’s and emerging data analytics technologies Formulate scaling laws and identify potential limitations in terms of usability, functions and performances

Phase 3 (2017) Extrapolate from existing functions and performances and their evolution over the next four years to the time frame of an FCC realization phase Derive recommendations for a data analytics ecosystem for future accelerator and collider projects

3. R & D for FCC based on current data Suitable technologies for future machines 1. Validation of models in future LHC runs Better understanding of machine 2. Provide opportunities for HL-LHC Improvement of availability