Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
Fermilab Accelerator Complex in the Near Term: Muon Physics Program Eric Prebys Accelerator Physics Center FNAL.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Eric Prebys Representing the “Mu2e Task Force”: Steve Werkema Jim Morgan Vladimir Nagaslaev Chuck Ankenbrandt Vladimir Shiltsev Ioanis Kourbanis *Mu2e-doc-1911.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
Muon Campus Controls Update Brian Drendel 8/6/13.
Mu2e WGM 9/15/2010 R. Ray Mu2e Project manager. L2 Systems and Managers R. Ray - Mu2e WGM2 1.2 Accelerator S. Werkema FNAL 1.3 Conventional Construction.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Storage Rings Group Meeting Steve Werkema 24 March 2010.
Delivery Ring AIP Jerry Annala Dec 12, µ Scope Beam line aperture improvements Beam line aperture improvements Beam line power supply upgrades Beam.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Mu2e Experiment and Issues Rick Coleman, Fermilab RESMM’12, February 2012.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
Project Overview Ron Ray Mu2e Project Manager Fermilab Sept. 26, 2008 Preliminary Director’s Review of mu2e Fermilab.
Mu2e WGM 10/20/2010 R. Ray Mu2e Project manager. Why does the building have to go in the middle of a road? R. Ray - Mu2e WGM2.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Mu2e Meeting, April 2, 2008 E Prebys Toward a Proposal Key Points  In order to start money flowing, we need to pursue CD-0 (“Statement of Mission Need”)
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Mu2e Mu2e CD-2 Review Template Eric Prebys Extinction October 21-24, 2014.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
What we have now – the Pbar source 1 1/23/2013 J. Morgan.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Mu2e Meeting, FNAL, September 15-16, 2006 E Prebys 1 Radiation and Slow Extraction Issues* (work in progress) Eric Prebys, FNAL/AD.
NuMI PS Specs June 2001 S. Childress Page 1 NuMI NuMI requirements are for a very large fraction of the available Main Injector intensity over a period.
Brian Drendel January 24, Mu2e News Beam Delivery and Requirements Beam Intensity & Loss Measurements  DCCT  Toroids  Ion Chambers  Wall Current.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Mu2e Accelerator Independent Design Reviews (IDRs) Steve Werkema Muon Department Meeting 17 December 2015.
Ioanis Kourbanis 01/23/13 RR AIP 1. Requirements Provide proton beam with the proper time structure from the Recycler to the muon campus for the g-2/mu2e.
Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
Neutrinos from Stored Muons STORM physics with a μ storage ring.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Brian Drendel October 31, This talk  Beams-doc private/DocDB/ShowDocument?docid=4474https://beamdocs.fnal.gov/AD-
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Mu2e Ron Ray Mu2e Project Manager Jan. 11, Scope of Mu2e Project R. Ray - Mu2e Overview 2 Design, construct, and install the Mu2e detector, modify.
Beam Transport and Storage Rings Design Review November 17, 2010 J. Morgan.
Jayakar Thangaraj Fermilab Accelerator Advisory Committee November 7-9, 2011 PROTOPLASMA: Proton-driven wakefield experiment at Fermilab.
P-981 Antimatter Gravity Experiment: Accelerator Augmentations and Civil Construction Dr. Gerald P Jackson Hbar Technologies, LLC
Status of FMS Refurbishment
Electron Collider Ring Magnets Preliminary Summary
Presentation transcript:

Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems

Mu2e Accelerator Organization S. Werkema2 2 Mu2e Accelerator S. Werkema V. Nagaslaev (Deputy) FNAL 2 Mu2e Accelerator S. Werkema V. Nagaslaev (Deputy) FNAL 2.01 Project Management S. Werkema V. Nagaslaev (Deputy) FNAL 2.01 Project Management S. Werkema V. Nagaslaev (Deputy) FNAL 2.02 Recycler I. Kourbanis FNAL 2.02 Recycler I. Kourbanis FNAL 6/15/ Transport to Storage Rings J. Morgan B. Drendel (Deputy) FNAL 2.03 Transport to Storage Rings J. Morgan B. Drendel (Deputy) FNAL 2.04 Storage Rings J. Morgan B. Drendel (Deputy) FNAL 2.04 Storage Rings J. Morgan B. Drendel (Deputy) FNAL 2.10 Target Station R. Coleman FNAL 2.10 Target Station R. Coleman FNAL 2.11 Operations Prep. B. Drendel FNAL 2.11 Operations Prep. B. Drendel FNAL 2.07 RF Systems J. Dey FNAL 2.07 RF Systems J. Dey FNAL 2.05 Radiation Safety A. Leveling FNAL 2.05 Radiation Safety A. Leveling FNAL 2.08 External Beamline C. Johnstone FNAL 2.08 External Beamline C. Johnstone FNAL 2.09 Extinction E. Prebys FNAL 2.09 Extinction E. Prebys FNAL 2.06 Resonant Extraction L. Michelotti FNAL 2.06 Resonant Extraction L. Michelotti FNAL All level 3 managers have been named

Significant Issues Antiproton Source service building shielding Antiproton Source service building space Costs higher than expected Human Resources 36/15/2011S. Werkema

Service Building Shielding 6/15/2011S. Werkema4 Original Service Building Shielding Cap Shielding design criteria Shielding design criteria: < 1 mRem/yr to public at 175 m (considered negligible). 500 Need an overall reduction factor of >500 relative to the existing shielding. * Shielding Cap Shielding Cap: additional ~160X (from MARS simulations in progress) Require Require additional factor of 4 to 5 from: interlocked detectors, eberm, or long detectors (Total Loss Monitors) *Assumes total beam loss of 2%. Work in progress: MARS simulations to calculate shielding factors are in progress FNAL Accelerator and ES&H personnel are studying the possible use of eberms and TLMs at Fermilab

Service Building Space Service building space requirements are still being compiled g-2 service building space requirements not known Need more space in AP30 and AP50 5 Some of the equipment that will be required for the Accumulator injection kicker. Not shown: Fluorinert skid, electronics racks. 6/15/2011S. Werkema

High Costs Much work on BOEs remains. Total Accelerator Systems cost is not yet known. Total will be much higher than Accelerator + Target estimate for the Mu2e proposal ($21.74M includes base & contingency) –Having difficulty determining what went into this estimate Several big ticket items with costs greater than expected: kicker magnets, pulsed power supplies, beam absorbers, RF, extraction septum, PS heat & radiation shield Likely service building expansion or construction 66/15/2011S. Werkema

Personnel Issues Received temporary engineering support from AD/ME, AD/EE, AD/Instrumentation, and Tech. Div. for BOEs –Big effort – much accomplished –Work still in progress The issue of long term mechanical and electrical engineering support remains Radiation Safety level 3 manager (Tony Leveling) is over committed (Pbar Target station, JASMIN, Mu2e) Many AD people associated with Mu2e are still primarily working on Collider Run II Possible loss of one level 3 manager in coming months 76/15/2011S. Werkema

New People Gerry Annala (AD/TeV) Help Carol Johnstone with external beamline Coordinate overall accelerator mechanicals systems development (cooling, vacuum, magnet stands, etc.) Curtis Baffes (AD/ ME Support) Target station integration engineer Ron Moore (AD/TeV) Assistant Division Head/Coordination of Mu2e and g-2 86/15/2011S. Werkema

What’s Going on Now Big effort to finish BOEs Several changes must be made to the CDR MARS simulations for service building shielding studies Planning for beam studies that need to be done before the beam goes off in September. Trying not to think about g-2 Run II (complete on September 30) 96/15/2011S. Werkema