FIRST/Planck 12 December 2000PT - 083921 The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.

Slides:



Advertisements
Similar presentations
ATHENA WFI Meeting Garching, January 28, 2014 Markus Plattner.
Advertisements

The ballistic support of the “SPECTR-RG” spacecraft flight to the L2 point of the Sun-Earth system I.S. Ilin, G.S. Zaslavskiy, S.M. Lavrenov, V.V. Sazonov,
Dr. Mark Price: Spring  We will go through the procedure of a real example of the mission proposal and selection process.  In 1 or 2 lectures.
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
SPITZER SPACE TELESCOPE. The Rationale for Infrared Astronomy reveal cool states of matter reveal cool states of matter explore the hidden Universe.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Thermal Design and Modeling for Infra Red Spectroscopic Imaging Survey Payload (IRSIS) S. L. D’Costa.
Solar Orbiter Payload Working Group Mid-term meeting November 2002, ESTEC 1. PDD Activities - Status of PDD inputs - Discussion of each instrument.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
1 ESAIL proof of concept mission Juha-Pekka Luntama Pekka Janhunen Petri Toivanen.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
Turin. ALTEC. ExoMars Progress Report ExoMars Science Working Team
Twenty years ago IRAS gave us what is still our best view of the mid  infrared sky.
Cryogenics for B-Pol S. Masi, reporting from F.X. Desert L. Piccirillo …. Use SAMPAN as a baseline, and look for improvements/variations.
WISE Wide-field Infrared Survey Explorer asteroids Galaxy ULIRGs brown dwarfs WISE will map the sky in infrared light, searching for the nearest and coolest.
Constellation Orion Visible Light Constellation Orion Infrared Light.
TARANIS a CNES Scientific Mission – C. Bastien-Thiry Workshop on Coupling of Thunderstorms and Lightning Discharges to Near-Earth Space – Corte 2008 TARANIS.
SDW2005, juin, Taormina The Corot Space instrument.
The Universe in the Infrared What is the Spitzer Space Telescope, and how does it work? Funded by NASA’s Spitzer Science Center Images courtesy NASA/JPL.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
IMPRS June Organigram of ESA, in the late 1980s
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Status of the ESA Earth Observation Programmes Dr. Simonetta Cheli Head of Earth Observation.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Dynamic Design: Launch and Propulsion Genesis Launch Vehicle: The Delta Rocket Student Text Supplement.
The Hard X-ray Modulation Telescope Mission
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
DEEP IMPACT The Mission Now
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
Cryogenics for FPP S. Masi Two inter-related issues: –Cryogenic chain for the focal plane (final temperature 0.1K) –Thermal system to radiatively cool.
Viewgraph /12/2000 The FIRST mission: Science objectives and this meeting by Göran L. Pilbratt The FIRST mission: Science objectives and this meeting.
ASTRONOMY 101 LECTURE SUN FACTS. A ball of hot gases Made up of 70% hydrogen 28% helium 1.5% carbon, nitrogen, and oxygen, and 0.5% all other elements.
Henry Heetderks Space Sciences Laboratory, UCB
SPICA / AIV&T issues Spacecraft test program & model philosophy
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
Advanced Studies and Technology Preparation Division 1 SPICA Mission profile M class presentation Paris, 1 December 2009.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Réunion de présentation des besoins 10 Nov Joël MICHAUD French expertise in SiC for large telescopes.
Programs and plans ASI - Observation of the Universe.
FPI related schedule & Model Philosophy Based on spica_AIVT_revC, FPI_review_by_SDR_E Mar. 15 th, 2010 by H. Matsuhara, N. Takahashi, T. Nakagawa.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
LISA News from ESA O. Jennrich LISA Project Scientist.
© 2014 Orbital Sciences Corporation. All Rights Reserved. SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, Welsch.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
Nine Years of Atmospheric Remote Sensing with SCIAMACHY – Instrument Performance Gottwald, Krieg, Lichtenberg, Slijkhuis – DLR-IMF Noël, Bramstedt, Bovensmann,
G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19,
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Date of download: 5/29/2016 Copyright © 2016 SPIE. All rights reserved. Drawing of the Space Infrared Telescope for Cosmology and Astrophysics (SPICA)
The Space Telescope and The Lagrangian Point.  Launch Scheduled for 2018 by European Space Agency  18 Segment Primary Mirror (Gold-plated Beryllium;
Report on Payload and Calibration splinter meeting B. Maffei M. Bersanelli 1CERN May 2016.
Possible italian contributions to the IAXO telescope structure M.Riva.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
JUpiter Icy Moons Explorer (JUICE)
Solar Probe Plus Scheduled to be launched in 2018 Solar Probe Plus will come closer to the Sun than any spacecraft has ever flown - and what it finds could.
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
March ’05 Face to Face Meeting Introduction
Main information on the «WORLD SPACE OBSERVATORY» project
5. Conclusions and future work
THERMAL CONTROL SYSTEM
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST

FIRST/Planck 12 December 2000PT Overview  FIRST/Planck Programme  Mission Description - Orbit  Launch Configuration  Planck Spacecraft  FIRST Spacecraft  Implementation Status

FIRST/Planck 12 December 2000PT FIRST/Planck Programme Two Missions FIRST the fourth Cornerstone Mission of the Horizon 2000 longterm programme of ESA FIRST the fourth Cornerstone Mission of the Horizon 2000 longterm programme of ESA Planck, the third Medium Mission of Horizon 2000 Planck, the third Medium Mission of Horizon 2000 Two Spacecraft Two Spacecraft Three axis stabilised pointing Observatory Three axis stabilised pointing Observatory Low spin sky scanning survey mission Low spin sky scanning survey mission Two Cryogenic Payloads Two Cryogenic Payloads He II cryostat with temperatures down to 1.7 K, coolers down to 0.3 K He II cryostat with temperatures down to 1.7 K, coolers down to 0.3 K Passive cooling to 60 K and coolers down to 0.1 K Passive cooling to 60 K and coolers down to 0.1 K One Launcher One Launcher ARIANE V with single launch for both Spacecraft ARIANE V with single launch for both Spacecraft One Programme One Programme One ESA project team, One prime Contractor, Commonality enforced One ESA project team, One prime Contractor, Commonality enforced

FIRST/Planck 12 December 2000PT FIRST/Planck Project Organisation FIRST/Planck as International Co-operation ESA- Responsibility for the Mission Partners- Principal Investigator Groups - Science teams for both missions - Spacecraft Contractor - Launcher Authority (ARIANESPACE) - Spacecraft and Science Operation Teams Co-Operations- FIRST Telescope (NASA/JPL - US) - Planck Telescope Reflectors (DK - Planck)

FIRST/Planck 12 December 2000PT Mission Description - Orbit Orbit around second Lagrangian Point in Earth/Moon - Sun System 1.5 million kilometres from Earth Transfer trajectories with duration of three months

FIRST/Planck 12 December 2000PT Mission Description - Orbit FIRST Planck FIRST

FIRST/Planck 12 December 2000PT Launch Configuration - The Carrier Characteristics at launch Total Height: 11 m Launch mass: 5300 kg Separation interfaces at Launcher and upper Planck SVM interface Separation of FIRST from Planck upon AR5 command Separation of Planck from AR5 in a standard way

FIRST/Planck 12 December 2000PT Planck Spacecraft Characteristics Survey mission Submillimeter to millimeter (30 GHz GHz) Orbit around L 2 Autonomous operation (21h - 3h) Low spin (1 revolution/minute) Operational lifetime at L2 - two sky surveys Passive cooling to below 60 K Mass: 1450 kg Power: 1200 W Height: 4.5 m

FIRST/Planck 12 December 2000PT Planck Payload Module Characteristics Passively cooled to below 60 K Aplanatic Telescope (1.5m optical aperture) Thermal fluctuations minimised Main components -SVM shield -V-groove shield -Structures - shield support -Telescope Baffle (radiator) Cooler for instruments 20 K H 2 Sorption Cooler 4 K JT mechanical cooler 0.1 K Dilution Cooler

FIRST/Planck 12 December 2000PT FIRST Spacecraft Characteristics Multi user observatory mission Far infrared/submillimeter (  m) Orbit around L 2 (1.5 million km from Earth) Autonomous operation (21h - 3h) 3.5 m Diameter Telescope Operational lifetime at L 2 > 3 years Helium cryostat High accuracy pointing Mass: 3300 kg Power: 1750 W Height: 9.3 m

FIRST/Planck 12 December 2000PT FIRST Payload Module Characteristics Liquid helium cryostat (ISO type) Protected from direct sun illumination by sunshield external surface of cryostat used as radiator He II tank volume 2160 l He II temperature below 1.7 K Instruments inside the cryostat at focus Telescope 3.5 m above cryostat

FIRST/Planck 12 December 2000PT FIRST Cryostat Optical beam Cryostat vacuum vessel FPU’s Main Helium Tank (2160l) Aux. Tank Optical Bench Tank supports

FIRST/Planck 12 December 2000PT FIRST Telescope FIRST Telescope characteristics: Size: 3.5 m diameter Performance (WFE): 10 µm rms, 6 µm rms as a goal Temperature: 70 K - 90 K operational Total mass: < 280 kg Telescope mounted on top of the cryostat, launched warm, cooling in orbit Protected from the sun by a sunshield to achieve adequate thermal environment Baseline: Telescope contribution to ESA from NASA

FIRST/Planck 12 December 2000PT FIRST Development Maximise advantages of commonalities between FIRST and Planck Separate spacecraft - same timeframe - common development Major Elements of spacecraft development - FIRST Cryostat derived from ISO - use experience, reduce risks - Instrument Qualification Models tested for performance in 'system' environment - Critical items of the SVM qualified prior to build of Flight Model - FIRST Telescope is a critical development with dedicated pre-development

FIRST/Planck 12 December 2000PT Implementation Status Scientific Instruments Design Phase started after selection in May 1998 All FIRST and Planck Instruments approach Hardware Phase now Need dates to achieve launch on 15th February 2007: Qualification Models - April 2003 to ESA Flight Models - July 2004 to ESA

FIRST/Planck 12 December 2000PT Spacecraft Development Launch………………………………………………..15th February 2007 Launch Campaign Shipment to Kourou Carrier System Testing Carrier integration Spacecraft Testing Spacecraft Integration Module Testing Module Integration Instrument Flight Model delivery --- July 2004 Qualification……………………………………………….early 2004 Qualification Module Testing Qualification Module Integration Instrument Qualification Model delivery --- April 2003 Manufacturing complete..……………………………………….early 2003 Design complete...……………………………………………….mid 2002 Start Design..………………June 2001 Implementation Status

FIRST/Planck 12 December 2000PT Implementation Status Invitation to Tender for Spacecraft Development - 1st September 2000 Proposals from Industry due - 4th December 2000 Evaluation of Proposals and Selection of Prime Contractor Start Development - 1st June 2001 Launch