LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.

Slides:



Advertisements
Similar presentations
Building Portals to access Grid Middleware National Technical University of Athens Konstantinos Dolkas, On behalf of Andreas Menychtas.
Advertisements

Stephen Burke - WP8 Status - 9/5/2002 Partner Logo WP8 Status Stephen Burke, PPARC/RAL.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
4/2/2002HEP Globus Testing Request - Jae Yu x Participating in Globus Test-bed Activity for DØGrid UTA HEP group is playing a leading role in establishing.
1 OBJECTIVES To generate a web-based system enables to assemble model configurations. to submit these configurations on different.
NIKHEF Testbed 1 Plans for the coming three months.
Status of SICB and Monte Carlo productions Eric van Herwijnen Friday, 2 march 2001.
GRID workload management system and CMS fall production Massimo Sgaravatto INFN Padova.
Production Planning Eric van Herwijnen Thursday, 20 june 2002.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
GRID Workload Management System Massimo Sgaravatto INFN Padova.
K.Harrison CERN, 23rd October 2002 HOW TO COMMISSION A NEW CENTRE FOR LHCb PRODUCTION - Overview of LHCb distributed production system - Configuration.
11 Dec 2000F Harris Datagrid Testbed meeting at Milan 1 LHCb ‘use-case’ - distributed MC production
Exploiting the Grid to Simulate and Design the LHCb Experiment K Harrison 1, N Brook 2, G Patrick 3, E van Herwijnen 4, on behalf of the LHCb Grid Group.
QCDgrid Technology James Perry, George Beckett, Lorna Smith EPCC, The University Of Edinburgh.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
08/06/00 LHCb(UK) Meeting Glenn Patrick LHCb(UK) Computing/Grid: RAL Perspective Glenn Patrick Central UK Computing (what.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
LHCb Applications and GRID Integration Domenico Galli Catania, April 9, st INFN-GRID Workshop.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
Grids and Portals for VLAB Marlon Pierce Community Grids Lab Indiana University.
SLICE Simulation for LHCb and Integrated Control Environment Gennady Kuznetsov & Glenn Patrick (RAL) Cosener’s House Workshop 23 rd May 2002.
QCDGrid Progress James Perry, Andrew Jackson, Stephen Booth, Lorna Smith EPCC, The University Of Edinburgh.
1 The DataGrid WorkPackage 8 F.Carminati 28 June 2001.
Cosener’s House – 30 th Jan’031 LHCb Progress & Plans Nick Brook University of Bristol News & User Plans Technical Progress Review of deliverables.
Nick Brook Current status Future Collaboration Plans Future UK plans.
Nadia LAJILI User Interface User Interface 4 Février 2002.
1 DIRAC – LHCb MC production system A.Tsaregorodtsev, CPPM, Marseille For the LHCb Data Management team CHEP, La Jolla 25 March 2003.
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
MAGDA Roger Jones UCL 16 th December RWL Jones, Lancaster University MAGDA  Main authors: Wensheng Deng, Torre Wenaus Wensheng DengTorre WenausWensheng.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
Status of the LHCb MC production system Andrei Tsaregorodtsev, CPPM, Marseille DataGRID France workshop, Marseille, 24 September 2002.
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
Author - Title- Date - n° 1 Partner Logo EU DataGrid, Work Package 5 The Storage Element.
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
WP8 Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid WP8 Meeting, 16th November 2000 Glenn Patrick (RAL)
28 March 2001F Harris LHCb Software Week1 Overview of GGF1 (Global Grid Forum) and Datagrid meeting, NIKHEF, Mar 5-9 F Harris(Oxford)
NGS Portal.
German Cancio/ WP4 -1 WP4 comments for the TestBed German Cancio / WP4
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
T3 analysis Facility V. Bucard, F.Furano, A.Maier, R.Santana, R. Santinelli T3 Analysis Facility The LHCb Computing Model divides collaboration affiliated.
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
Portal Update Plan Ashok Adiga (512)
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
LHCb Data Challenge in 2002 A.Tsaregorodtsev, CPPM, Marseille DataGRID France meeting, Lyon, 18 April 2002.
INFSO-RI Enabling Grids for E-sciencE Using of GANGA interface for Athena applications A. Zalite / PNPI.
LHCb GRID Meeting 11/12 Sept Sept LHCb-GRID T. Bowcock 2 AGENDA 9:30 LHCb MC Production –Points SICB Processing Req. Data Storage Data Transfer.
CLRC Grid Team Glenn Patrick LHCb GRID Plans Glenn Patrick LHCb has formed a GRID technical working group to co-ordinate practical Grid.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
A Web Based Job Submission System for a Physics Computing Cluster David Jones IOP Particle Physics 2004 Birmingham 1.
LHCb computing model and the planned exploitation of the GRID Eric van Herwijnen, Frank Harris Monday, 17 July 2000.
The EDG Testbed Deployment Details
MCproduction on the grid
Moving the LHCb Monte Carlo production system to the GRID
Gridifying the LHCb Monte Carlo simulation system
CRC exercises Not happy with the way the document for testbed architecture is progressing More a collection of contributions from the mware groups rather.
Stephen Burke, PPARC/RAL Jeff Templon, NIKHEF
Alice Software Demonstration
Gridifying the LHCb Monte Carlo production system
First attempt at using WIRED
Status and plans for bookkeeping system and production tools
Short to middle term GRID deployment plan for LHCb
Joel Closier Eric van Herwijnen Agnieszka Jacholkowska
Production Manager Tools (New Architecture)
Presentation transcript:

LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001

Overview  WP 8 deliverables  Testing of Testbeds  Hooking up to the “LHCb GRID”  Grid-ifying the LHCb production tools  Planning next GRID brainstorming meeting

WP8 deliverables  Month 6: planning document with specifications of the GRID services required from the other working groups for the different phases of the WP  Month 12: Use case programs. Report on the interfacing activity of use case software to minimal grid services (first delivery of Middleware functions end Sep (M9)..Testbed1)

Testing of testbeds  Testbed0 available at CERN  5 machines, “LXPLUS”-like environment  no AFS, could be mounted r/o via NFS  local certificate authority  for accounts, see P. Martucci/S. Jarp  Not clear yet who will be part of Testbed 1 in September

Hooking up to the “LHCb GRID”  Have started a CVS repository “GRID”  First package: java job submission tools  Interested institutes can download, modify and install these tools  Keep a central common repository  Objective: outside institutes to supervise their local productions

1. Production started by filling out a Web form:  Version of software  Acceptance cuts  Database  Channel  Number of events to generate  Number of jobs to run  Centre where the jobs should run 2. Web form calls a java servlet that:  Creates a job script (one per job)  Creates a cards file (one-three per job) with random number seeds and job options (The cards files need to be accessible by the running job)  Issues a job submit command to run script in batch-> WP1 3. Script does the following:  Copies executable, detector database and cards files  Executes executable  Executable creates output dataset  Output copied to local mass store -> WP5  Log file copied to web browsable area  Script calls java program (see 4) 4. Java program calls servlet at CERN to:  Transfer data back to CERN -> WP2  Update meta-database at CERN -> WP2 LHCb Use Case for Datagrid (MC production)

Gridi-fying the LHCb production tools  First test (this week): submitting bb-bar inclusive jobs at RAL CSF (pbs) using the globus-run command  Second test (NIKHEF): modify production tools to allow submission of general jobs to pbs gradually replace datamove commands in the scripts by grid-ftp commands  Third test (september): try the modified tools on testbed1  Expect other institutes to participate

Next LHCb-Grid ‘brainstorming’ meeting  Hoping to have 2 day meeting in Bologna late May/early June (venue and dates to be confirmed) Hear about LHCb/Italy computing planning Review our general Computer Facility/GRID activities Review development of Data Analysis Model and mapping to GRID