A general applicable Process Improvement Approach www.amc-rf.com 10 October 2005 Asset Management Control Introduction Workshop.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

PROJECT MANAGEMENT BASICS
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
What is an M and E Plan?. Organizing the Work of M and E An M and E System -- the 12 components as a whole – Sets out broad vision at national level An.
Scope of TOGAF ADM The scope of the four architecture domains of TOGAF align very well with the first four rows of the Zachman Framework, as shown in the.
S3-1 © 2001 Carnegie Mellon University OCTAVE SM Process 3 Identify Staff Knowledge Software Engineering Institute Carnegie Mellon University Pittsburgh,
 Capacity Development; National Systems / Global Fund Summary of the implementation capacities for National Programs and Global Fund Grants For HIV /TB.
In Europe, When you ask the VET stakeholders : What does Quality Assurance mean for VET system? You can get the following answer: Quality is not an absolute.
9 th Annual Public Health Finance Roundtable November 3, 2012 Boston, MA Peggy Honoré.
S2-1 © 2001 Carnegie Mellon University OCTAVE SM Process 2 Identify Operational Area Management Knowledge Software Engineering Institute Carnegie Mellon.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Systems Engineering in a System of Systems Context
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 16
Chapter Extension 19 Alternative Development Techniques © 2008 Pearson Prentice Hall, Experiencing MIS, David Kroenke.
Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
Aust. AM Collaborative Group (AAMCOG) An introduction to ISO “What to do” guide 20th October 2014.
Software Engineering Project Management (CS - 413)
Software Engineering 1 Therese Hume X361 Room 7, prefab (mon,wed)
Framework Project Concept Source – PMBOK®– 2008 Edition Project Management Professional Project Management Professional (P M P)
Opportunities & Implications for Turkish Organisations & Projects
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Bill Golaz Greg Niemann October 22, 2013 Operations Analysis Workshop “Operational Analysis Measures for Program Start Up”
Capability Assessment Process
Twinning project, activity 4, Maintenance assessment Tuesday 4 th October 2005, session 3 Output management: essential Instruments within ProRail By Jan.
Audit of Public Procurement
DBS201: DBA/DBMS Lecture 13.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Performance Technology Dr. James J. Kirk Professor of HRD.
Change Management “Getting from where you are, to where you want to be”
Foundations of Geospatial System Development Todd S. Bacastow Professor of Practice for Geospatial Intelligence John A. Dutton e-Education Institute The.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
Function Based Innovation & Continuous Process Improvement A general applicable Process Improvement Approach.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
NGO Information Development Workshop May 21 st.
Building Capability.  In order to successfully operate an architecture function within an enterprise, it is necessary to put in place appropriate organization.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Asset Managers Network Strategic Asset.
SUB-MODULE 5. MEANS OF VERIFICATION RESULTS BASED LOGICAL FRAMEWORK TRAINING Quality Assurance and Results Department (ORQR.2)
Asset Management Control Systems Approach Introduction 2009 John Stavenuiter PhD in AMC Founder of the AMC Research Foundation and AMC Centre Program Director.
+ INTRODUCTION TO VCE ART UNIT 2 COURSE BREAKDOWN.
Engineering Essential Characteristics Security Engineering Process Overview.
Linking PACA with regional strategy: GENESIS Jörg Meyer-Stamer
DoD Logistics Human Capital Strategic Planning Overview June 26, 2007.
Systems Engineering Conceptual System Design. Systems Engineering and Analysis, B.S. Blanchard and W. J. Fabrycky, 3 rd edition, Prentice-Hall, 1998.
Computers in Libraries Computers in Libraries, March 15, 2005 Changing the Landscape Making the Future Library Now!
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
Project Human Resource Management. Presentation Team 1)Mrs. Mardia Ibrahim Osman(Mechanical Engineer) 2)Mr. Elsaeed Osman Elsheikh(Medical Doctor) 3)Mr.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
WaterCompass Workshop Kenya 3 November 2014 Gábor Szántó and Alida Pelgrim-Adams
Stages of design  High level design  High level data structure  Architecture  Low level design-code design  Algorithms  Low level data structures.
SKA Configuration Management Engineering Meeting Susan Nel
Technologies Derek Middleton, Qualification Development Manager Scottish Qualifications Authority.
John N. Lavis, MD, PhD Professor and Canada Research Chair in Knowledge Transfer and Exchange McMaster University Program in Policy Decision-Making McMaster.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Association of Enterprise Architects International Committee on Enterprise Architecture Standards Jan 23, Collaborative Expedition Workshop #57aeajournal.org.
Regional Sediment Management Policy and Implementation Workshop April, 2009.
Information Security tools for records managers Frank Rankin.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
ITIL® Service Asset & Configuration Management Foundations Service Transition Thatcher Deane 02/17/2010.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
The International Society for Quality in Health Care (ISQua) – Guidelines.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Sourcing Evaluation Life Cycle Go/No Go decision points Competition Alignment Discovery Con tract Modification Project Initiation Vendor Capabilities Contract.
Michael J. Novak ASQ Section 0511 Meeting, February 8, 2017
Chapter 24: Architecture Competence
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
Agency in educational robotics settings: a new design approach
Chapter 1 (pages 4-9); Overview of SDLC
EA Framework TOGAF is a framework - a detailed method and a set of supporting tools - for developing an enterprise architecture.
Presentation transcript:

A general applicable Process Improvement Approach 10 October 2005 Asset Management Control Introduction Workshop

1 Day Workshop Program AMC Introduction (9.00 hr)AMC Introduction (9.00 hr) Asset Management Context AnalysisAsset Management Context Analysis AMC Quick ScanAMC Quick Scan LunchLunch AMC Improvement AssessmentAMC Improvement Assessment AMC Business CaseAMC Business Case Workshop Evaluation (17.00 hr)Workshop Evaluation (17.00 hr)

Asset Logistics Process Cycle The Workshop Starting Points AMC Process Definition Matrix Determination of: Assets and Actors involved

Business Process Function Model Principles & Definitions BUSINESS PROCESS DOMAIN REALIZE Function Area Actor Chain CONTROL PLAN ARRANGE MANAGE PERFORM ORGANIZE SPECIFY PROCESS ELEMENTS PROCESS PHASES

A ‘day to day’ Management Model OPERATIONAL ENVIRONMENT TECHNICAL SYSTEM LOGISTICS PROCESS NeedFunctionality Asset Management Focus REQUIREMENTS ACCOUNTS DIRECTIVES CONTROLS PRODUCTS & SERVICES DIAGNOSES (feedback) Key to Symbols: ACTOR ENTITY EXTERNAL COMMUNICATION INTERNAL COMMUNICATION ASSET MANAGEMENT FOCUS Utilization Authority Mainten. Authority Purchase Authority Design Authority The Context Analysis Framework

The context of systems thinking Cost-Effectiveness View on Performances View on Cost Asset/System Structure Logistics Process Structure Methods & Techniques Actors serviceability applicability attitude skills mindset knowledge Asset Management Control

Context Analysis Reports System Specifications (technical & logistical)System Specifications (technical & logistical) Organizational Aspects (men & means)Organizational Aspects (men & means) Process Performance (quality & quantity)Process Performance (quality & quantity) Management Control (relevant & reliable)Management Control (relevant & reliable)

AMC Quick Scan (3 Questions per Function Area) AMC DOMAIN (ASSET RELATED) REALIZE CONTROL PLAN ARRANGE MANAGE PERFORM ORGANIZE SPECIFY PROCESS ELEMENTS PROCESS PHASES SERVICE LEVEL AGREEMENT CONTRACT MANAGEMENT RESOURCE MANAGEMENT CONTROL PLAN LCM SYSTEM PLAN SYSTEM COST- EFFECTIVENESS TEAM WORK ACTOR DEFINITION MODEL LIFECYCLE MANAGEMENT TEAM MANAGEMENT ORGANIZATIONAL PLAN ACTIVITY PLAN MANAGEMENT CONTROL SYSTEM INFORMATION PORTAL TEAM BUILDING LIFECYCLE MANAGEMENT MODEL A possible result with 4 red areas to improve!

The Team Based AMC Model OPERATIONAL SYSTEM TECHNICAL SYSTEM LOGISTICS SUPPORT SYSTEM LCM-systems NeedFunctionality LCM-team REQUIREMENTS ACCOUNTS DIRECTIVES CONTROLS PRODUCTS & SERVICES DIAGNOSES (feedback) Key Elements: ASSET MANAGEMENT PROGRAM ENGINEERS & MANAGERS ANALYSIS & CONTROL TOOLS COMPUTER APPLICATIONS WIDE AREA NETWORK The Business Case Framework

AMC Improvement Factors 1. well-specified objectives 2. transparent (technical) system breakdown structure 3. transparent (logistics) process structure 4. system effectiveness measures 5. (life cycle) cost measures 6. key performance indicators 7. system knowledge 8. logistic knowledge 9. management control knowledge 10.information & communication technology The Business Case Baseline

The RNLN Air Defense Frigates Business Case (for example) The baseline for an AMC Realization Project

Evaluation Asset Management Control eliminates Performance Killers & Cost Drivers by getting Systems in Control