February 9 th, 2005 Implementing Standards to Overcome Obstacles and Issues of a Smart Meter Initiative Metering Billing CRMCIS America April 12, 2005.

Slides:



Advertisements
Similar presentations
World Class Standards Smart Grids ETSI Strategic Topic Philippe Lucas © ETSI All rights reserved ETSI Smart Grid workshop, June 14th 2010.
Advertisements

© USCL Corporation - All Rights Reserved USCL Corporation 2737 Eastern Avenue Sacramento, California A managed approach to the successful.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
AMIT Business Strategic Realignment August 31, 2010.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
Implementing the SET-plan proposed Energy Efficiency Directive The proposed Directive establishes a common framework for promoting energy efficiency in.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
COMPETITIVE ELECTRICITY MARKETS March 15, PA Customer Choice Legislation  Distribution service remains regulated by PAPUC.  Transmission service.
Solutions for Meter Data Management Layne Nelson Product Manager LODESTAR Corporation Copyright © 2005 LODESTAR Corporation - All Rights Reserved LODESTAR.
Helping to Create a Culture of Conservation David J. Collie President and CEO An Update on Ontario’s Smart Metering Initiative.
Donny Helm Director – Technology Strategy and Architecture Oncor Electric Delivery November 1, 2012 The Challenges of Establishing A Common AMS View In.
1 Department of Water and Power City of Los Angeles Automatic Meter Infrastructure Program Mariko Marianes and John Yu.
Power Utilities in the Telecom Business in the USA: Past Failures and Future Trends Mike Oldak Vice President & General Counsel Utilities Telecom Council.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use, reproduction or.
An Overview of the Australian National Electricity Market Brian Spalding Chief Operating Officer.
SMART METERING SOLUTIONS TO SHAPE OUR ENERGY FUTURE Empowering the Customer Experience Marketing Executives Conference Cranwell Resort Lenox, Massachusetts.
Energate: Leaders in Consumer Demand Response ENERGATE: AN ONTARIO CASE STUDY A fully integrated 2.0 Smart Grid… with Ontario Consumers.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
PowerPoint Presentation by Charlie Cook Gordon Walker McGraw-Hill/Irwin Copyright © 2004 McGraw Hill Companies, Inc. All rights reserved. Chapter 7 Partnering.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
A NEW MARKET PLAYER: THE AGGREGATOR AND ITS INTERACTION WITH THE CONSUMER interaction Ramón Cerero, Iberdrola Distribución Paris, June 9th 2010 ADDRESS.
Purpose: These slides are for use with customers by the Microsoft Dynamics NAV sales force and partners. How to use: Add these slides to the core customer.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
The Secrets to Successful AMI Deployment – The Ontario Experience Paul Murphy, President & CEO Independent Electricity System Operator February 19, 2007.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Natural Gas Data Systems Conceptual Framework Measurement and Distribution Current Developments and Changes Roy Kass Energy Information Administration.
Advanced Metering Implementation Team Update Christine Wright Public Utility Commission of Texas October 2008.
Listen to Your Meters! Pradeep Murthy SunTec Business Solutions.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
  CIS Selection and Implementation and the Importance of Integrated Planning Bruce Goldblatt, Director Alliance Data Systems April 12, th Annual.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
PowerOneData’s GENII Leverages Cloud Platform to Deliver Affordable, Scalable, and Accessible Meter Data Management Software to Customers COMPANY PROFILE:
8 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
1 Copyright ©2009 by Cengage Learning Inc. All rights reserved Designed by Eric Brengle B-books, Ltd. CHAPTER 14 Prepared by Amit Shah Frostburg State.
Project Portfolio Management Business Priorities Presentation.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Dynamic Pricing Case Studies. Digi International.
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
Demand Forecast Deviations Working Group Presented to: Stakeholder Advisory Committee Presented by: Pat Doran January 24, 2007.
Smart Meter Initiative Process and Progress Pamela Nowina Toronto, Ontario September 8, 2004.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
Metering Americas April 24, 2006 Advanced Metering.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
© 2010 by Elster. All rights reserved. Virginia Submetering Program: Benefits and Solutions Contact Bob Jennings at Energy ICT/Westridge Energy
Changing IT Managing Networks in a New Reality Alex Bakman Founder and CEO Ecora Software.
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
Chairman of the Board and CEO,
Supply Chain Management
Engaging Energy Consumers Energy Action, Fuel Poverty & Climate Action Conference - March 2017 Aoife MacEvilly Commissioner for Energy Regulation Regulating.
Deploying CIM to Bridge the Modeling Gap Between Operations and Planning Mike usa.siemens.com/digitalgrid unrestricted © Siemens AG 2017.

How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
Enterprise Resource Planning, 1st Edition by Mary Sumner
Advance Metering Infrastructure (AMI) system awareness Training
Pradeep Murthy SunTec Business Solutions
Solar Energy Commercialization
Presentation transcript:

February 9 th, 2005 Implementing Standards to Overcome Obstacles and Issues of a Smart Meter Initiative Metering Billing CRMCIS America April 12, 2005

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Province of Ontario Smart Meter Initiative Highlights Drivers  Demand increase outpacing supply  Coal-fired generation closure commitments by 2007 (25% of electrical generation)  Problems with existing nuclear plants  Transmission system constraints  Lack of investment in new generating plants Plan  Implement smart meters across Ontario for (virtually) all consumer segments (accompanied by rate re-structuring) Rationale  Providing consumers with time-based energy consumption information and time- based rates will motivate them to alter their consumption behavior using less energy at peak times of day.

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Milestones (Current under consideration)  800,000 smart meters installed in urban areas by 2008  Remainder of 4.3 million smart meters installed by 2010  5% demand reduction Metering (Current under consideration)  Residential 60 min. interval / Commercial and Industrial 15 min. interval  2-way communications  Interval presentment for first 4 months, TOU following  Consumer presentment, AVR access to energy data by 8:00 am Consumer Segments (Current under consideration)  Residential & Small Commercial  Mid Commercial (50kW to 200kW)  Large Commercial (over 200kW) Province of Ontario Smart Meter Initiative Highlights

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Discussion Topics Smart Metering Initiative Obstacles and Issues  Data collection, validation and rebuilding  Storage, process interfaces  Billing, consumer presentment, reporting  Implementation timing, multiple vendors Smart Meter Data Standard Benefits  Risk mitigation  Integration efficiencies  Better cost control or reduction Smart Meter Data Standards can mitigate risk, provide relief from implementation timelines, and lower costs associated with a Smart Meter Initiative

Obstacles and Issues

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Smart Meter Data Collection  Communications capacity, timing and logistics  All formats of billing determinants (TOU, interval)  Data collection hybrids in terms of technology, features, data  Manage meter change-out process (re-verification, failures) Issue: Risk of implementation delays due to testing and certification Risk of proprietary technology commitment (Cost) Local Distribution Company Vendor “B” native Smart Meter Data Vendor “A” native Smart Meter Data Obstacles and Issues

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Validation, Editing and Rebuilding Editing and Rebuilding  Residential vs. C&I business rules  Automated vs. manual intervention  Access to history for rebuilding  Data not processed by 8:00 a.m.  Time limit to process / update MDR  Audit trail For Presentment Purposes  Portraying data correctly  Updating already presented data Validation  Residential vs. C&I business rules  Dependent on data available  Simple limits for “outliers”  Cumulative to interval/TOU billing determinant comparison  More complex “missing data” rules Vendor “A” native Smart Meter Data Validation Editing and Rebuilding MDR Smart Meter Data Repository Vendor “B” native Smart Meter Data Issue: Risk of implementation delays due to testing and certification Risk of proprietary service commitment (Cost) Obstacles and Issues

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Smart Meter Data Storage  Volumes (4.3 Million meters)  > 46.8 B interval readings per year  > 1.65 TB of raw interval transaction data per year alone!  Types of metered data  Interval (15 and 60 minutes)  TOU cumulative energy (multi-register)  Straight energy (single register)  Vendor formats  Types of non-metered data  Audit  Tamper  Power Quality  Other billing determinant data “Non smart” meters during implementation Wholesale metering data Consolidated meter data  Maintain consumer – meter – service address relationship  Consumer information store  Relationship consumer – meter – service address – data access Issue: Cost of non-homogeneous data management Wholesale Metering Systems Vendor “A” native Smart Meter Data MDR Smart Meter Data Repository Vendor “B” native Smart Meter Data Non-Smart Metering Systems Obstacles and Issues

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Process Interfaces Energy Retailer Wholesale Metering Systems Government Reporting IESO LDC Billing & Settlement Consumer Presentment/AVR Consumer Directory Retail Metering Systems Smart Meter Data Repository MDR Wholesale Metering Systems Issue: Risk of implementation delays due to testing and certification Risk of proprietary technology commitment Obstacles and Issues

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Pre-billing Processing  TOU rate structures  On/Off/Shoulder rate block  Winter/Summer rate season  Interval Data Aggregation  15/60 min. interval to daily TOU  Daily TOU to monthly TOU  Minimal requirements to aggregate  Interval data  Billing and reporting  Retail/franchise consumers  Distribution loss factor correction  Billing multipliers Aggregation Issue: Risk of proprietary service commitment (Cost) LDC Billing & Settlement MDR Smart Meter Data Repository Obstacles and Issues

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Consumer-Facing Systems  Web presentment  Automatic voice response  Call centre customer reps  Consumer directory management (i.e. security) Issue: Risk of implementation delays due to testing and certification Risk of proprietary technology commitment Consumers via AVR Consumers via Internet MDR Smart Meter Data Repository Consumers via LDC call centre Obstacles and Issues

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Reporting  Audit reporting  Changes to Smart Meter data  Editing and rebuilding audit  Tracking of rules applied, when by whom  Multiple information sources  Ad-Hoc reporting  Standard tools  Open access  Operations and Exception reporting Obstacles and Issues Successful initialization of modules installed in the field Discrepancies in modules and CIS links Successful capture of meter reads – benchmark of 95% Meter read reports Module alarms and status indicators Suspected tamper and trend reports Communication link monitoring, and Status indicators for regional collectors Validation results automated (e-file/ ) Network or communication link failures Power failures Memory capacity issues or meter failures TOU time or communication module reprogram failures Issue: Risk of unknown reporting requirements

Smart Meter Data Standards and Network Solution

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Smart Meter Data Standards Functionality 1. Content  Structure and format of data passed between systems. 2. Storage  Minimum requirements for amount of data to be stored and the corresponding retention periods. 3. Connectivity and Delivery  Delivery methods required to transport data between systems, including how systems locate and connect to each other. Characteristics of Functionality 1. Security  Storage and delivery must be secure, and systems and parties must be authenticated before data passes. 2. Certification Capabilities  Minimum requirements to demonstrate regulatory compliance. 3. Audit Capabilities  Ability to audit delivery and content of data, and non-repudiation of parties, especially when using independent third parties. 4. Reliability  Minimum requirements to ensure availability of systems and methods of service-interruption recovery. Network Solution

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Smart Meter Data Standards Standards mitigate risk by:  Providing clear testing and certification guidelines for vendor integration  Enabling participant choice to select tools and services  Simplifying system enhancement, replacement, or insertion Network Solution

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Smart Meter Data Standards Standards provide relief from aggressive timelines by:  Establishing a clear set of testing and certification guidelines, which reduces implementation timelines  Reducing integration efforts between Smart Meter components  Aligning participants to achieve a common implementation strategy Network Solution

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Smart Meter Data Standards Standards help lower costs by:  Fostering a competitive market where solution vendors can offer alternative systems  Reducing effort to switch from one vendor or service provider to another  Reducing implementation, testing and certification phases Network Solution

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Smart Meter Data Standards  Smart Meter Data Standards Working Group “To define the meter data workflow and data representation standards for the Ontario Smart Meter Initiative.” Network Solution

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Smart Meter Network Network Solution

Confidential to The SPi Group Inc. For Internal Use Only. Copyright © The SPi Group Inc All Rights Reserved. Questions? Brent Williams Senior Strategic Manager Smart Meter Integration ext. 235