ISM Code 2010: Part B - Certification & Verification Malcolm Maclachlan.

Slides:



Advertisements
Similar presentations
TITLE 1 – MINIMUM REQUIREMENTS TO WORK ON A SHIP
Advertisements

Introduction to Auditing
Module 13 Oversight Assessment of Auditor Authentication Bodies
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
ISM Code 2010 overview Malcolm Maclachlan. ISM Code origins Serious 1980s accidents involving human error and management faults as contributing factors.
EMS Auditing Definitions
IS Audit Function Knowledge
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Class and Statutory Surveys
Safety Management System Malcolm Maclachlan. Safety management system (ISM Code, 1.1.4) A structured and documented system enabling Company personnel.
Check list ISM Code DOC.
Obligations of the Company
1.2.1 > ISPS Module ISPS Code Responsibilities
AUDITS AND INSPECTIONS
FPSC Safety, LLC ISO AUDIT.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
INTERTANKO ISTEC Meeting 26 – 28 March ISPS Code Areas of particular concern during Shipboard Verifications.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
Network security policy: best practices
Photocopies Occasionally need uncontrolled copies
Regional Training Centres
World Health Organization
1 AUDIT PROCESS Quality  Degree to which a set of inherent characteristics fulfils a need or expectation that is stated, generally.
Auditing an EMS for Conformance with EO 13423
MARITIME LABOUR CONVENTION MLC, 2006
HZS ISPS ISPS 10. Security Administration.
The Herald of Free Enterprise capsized 6 March 1987, moments after leaving the Belgian port of Zeebrugge, killing 193 passengers and crew. This was the.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Company duties under the ISM Code
INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon.
2010 Manila Amendments to the STCW Convention and Code – Port State Control Perspective Jeff Lantz Director, Office of Operating and Environmental Standards.
Common Audit Findings UTHSC Institutional Review Board (IRB)
ISO 9001: 2000 Certified Audit Process What to do.
INTRODUCTION TO AUDITING
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
Advice for Internal Compliance Programmes Billy Au Principal Trade Officer Head of Strategic Trade Controls Branch Trade and Industry Department The Government.
QUALITY OF EVIDENCE FRCC Compliance Workshop September/October 2008.
CRICOS Provider Code: 01505M RTO Number: 3045 DHS V Implement Food Safety Procedures SITXFSA001A.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
A QUALITY IMPROVEMENT TOOL
INTERTANKO ISTEC #23 Meeting Rome September 2003.
Internal Auditing ISO 9001:2015
TOTAL QUALITY MANAGEMENT
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
Non-Conformities: The Weakest Link TDI-Brooks International Sep 2014.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Page 1 Portfolio Committee on Water and Environmental Affairs 14 July 2009.
PORT STATE CONTROL For MODU or MOUs. Why Port State Control (PSC)?  Everybody knows today why ports States have been obliged to set up Port State control.
ISO 9001:2015/14001:2015 Certification Transition Process
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Planning meetingCertification audit, stage 1 Pre-audit (optional) Document review Prior to every certification audit a planning meeting is conducted where.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Internal Auditor Training
How to Implement an IG Manufacturing Quality Procedure System
Sound Financial Management
Step 3: Legally Binding agreements and contracts
Compliance Options & TSMS Process
Training Appendix for Adult Protective Services and Employment Supports June 2018.
Role & Responsibilities
BACKGROUND 1987 Joint MSC/MEPC working group on:
Management Verifications & Sampling Methods
Specialty Heat Treating, Inc. Internal Auditor Training
How to conduct Effective Stage-1 Audit
Americas Aerospace Quality Group Registration Management Committee
Presentation transcript:

ISM Code 2010: Part B - Certification & Verification Malcolm Maclachlan

Certification & periodical verification (para. 13) 1. Ship to be operated by Co holding Document of Compliance (DOC) or Interim DOC. 2. DOC issued for max 5 yrs by FS Admin or Recognized Org or another SOLAS Contracting Govt. 3. DOC only valid for ship types listed on it. 4. DOC subject to annual verification within 3 months before/after each anniversary date. 5. DOC to be withdrawn by FS Admin or issuing Contracting Govt at its request if annual verification is not requested or if evidence of major NCs. 6. All ship SMCs or ISMCs to be withdrawn if DOC is withdrawn.

Certification & periodical verification (para. 13) 7. Copy DOC to be on ship. (Photocopy OK.) 8. Safety Mgmt Cert (SMC) issued to ship for max 5 yrs after verifying that Co. & its shipboard management operate in accordance with approved SMS. 9. SMC subject to at least one intermediate verif’n. (If only one, to be between 2 nd & 3 rd anniversary dates of SMC.) 10. SMC withdrawn by FS Admin or issuing Contracting Govt at its request if annual verification is not requested or if evidence of major NCs. 11. When renewal verif’n is completed within final 3 mths validity, new DOC/SMC is valid from date of expiry for max 5y. If RV > 3 mths before expiry, new DOC/SMC is valid for max 5y from date of completion of RV.

SMC renewal problems (para. 13) 1. Renewal verification completed after expiry of SMC? New SMC is valid for max 5 yrs from completion date. 2. Renewal verification completed but new SMC cannot be placed on board before SMC expiry? FSA/RO may endorse existing SMC: valid for further 5 mths max. 3. Ship not at renewal port when SMC expires? Max 3 mths extension to complete voyage to port for verification. New SMC valid max 5 yrs from original expiry date before extension.

Interim certification (para. 14) Interim DOC, valid max 12 months, may be issued after verification when: Interim DOC, valid max 12 months, may be issued after verification when: –Co. is newly established –New ship type is added to DOC Co. must plan to implement SMS within period of validity. Co. must plan to implement SMS within period of validity. Interim SMC, valid max 6 months, may be issued for: Interim SMC, valid max 6 months, may be issued for: –New ships on delivery –Co taking responsibility for ship new to Co –Ship changed flag. Max 6 months extension possible in special cases. Max 6 months extension possible in special cases. Co. must plan internal audit within 3 months. Co. must plan internal audit within 3 months.

Verification (para. 15) Forms of certificates (para. 16) All verification procedures to be acceptable to FS Admin and take into account Revised Guidelines on implementation of the ISM Code by Administrations - Res. A.913(22) All verification procedures to be acceptable to FS Admin and take into account Revised Guidelines on implementation of the ISM Code by Administrations - Res. A.913(22)Revised Guidelines on implementation of the ISM Code by Administrations - Res. A.913(22)Revised Guidelines on implementation of the ISM Code by Administrations - Res. A.913(22) Ship types indicated on DOC and IDOC may be endorsed to reflect any limitations in the operations of the ships described in the SMS.

Companies operating multi-flagged fleets (MSC/Circ.762 – MEPC/Circ.312) Who should issue DOC? Who should issue DOC? 1. At least 12m in advance, Co. should approach relevant flag Administrations, propose action plan and request agreement of all parties. Co’s plan should state which entity should conduct which part of process. 2. Flag Administrations should talk to each other and agree.

Audit procedure - 1 Company applies for audit to FS Admin or RO (but MCA only for UK company or ship). Company applies for audit to FS Admin or RO (but MCA only for UK company or ship). Auditor reviews Safety Management Manual. Does the SMS meet ISM Code requirements? Auditor reviews Safety Management Manual. Does the SMS meet ISM Code requirements? Lead auditor liaises with Co. and produces audit plan. Lead auditor liaises with Co. and produces audit plan. Opening meeting of audit team with senior management. Opening meeting of audit team with senior management. Audit team assesses SMS against documentation & objective evidence. Audit team assesses SMS against documentation & objective evidence. Evidence is collected through interviews, observation of activities & examination of documents. Evidence is collected through interviews, observation of activities & examination of documents. Audit observations are documented. Audit team decides which observations are to be reported as Non-Conformities. Audit observations are documented. Audit team decides which observations are to be reported as Non-Conformities. Closing meeting with senior management; observations presented. Closing meeting with senior management; observations presented. Audit report is prepared. Company gets copy. Co. is advised to provide a copy of the shipboard audit reports to the ship. Audit report is prepared. Company gets copy. Co. is advised to provide a copy of the shipboard audit reports to the ship.

Audit procedure - 2 Corrective action (CA) follow-up. Co. is responsible for determining & initiating CA needed to correct a NC or its cause. Corrective action (CA) follow-up. Co. is responsible for determining & initiating CA needed to correct a NC or its cause. Failure to correct NCs may affect validity of DOC & related SMCs. Failure to correct NCs may affect validity of DOC & related SMCs. CA & possible follow-up audits to be completed within agreed time period. (Max 3 months for ordinary NC.) CA & possible follow-up audits to be completed within agreed time period. (Max 3 months for ordinary NC.)

Major non-conformity Identifiable deviation that poses a serious threat to the safety of personnel or the ship or a serious risk to the environment that requires immediate corrective action or the lack of effective and systematic implementation of a requirement of this Code. Identifiable deviation that poses a serious threat to the safety of personnel or the ship or a serious risk to the environment that requires immediate corrective action or the lack of effective and systematic implementation of a requirement of this Code. Examples: Examples: –OWS or ODMCS failure –Officer COC invalid –Main engine failure –Holed lifeboat; missing liferaft –Charts for current voyage not corrected –Corroded air pipes: maintenance procedures inadequate to comply with Load Line Regs

Non-conformity Observed situation where objective evidence* indicates the non-fulfilment of a specified requirement. (* Info, records or statements of fact based on obs’n, meas’t or test and which can be verified) Observed situation where objective evidence* indicates the non-fulfilment of a specified requirement. (* Info, records or statements of fact based on obs’n, meas’t or test and which can be verified) Rectify within agreed timeframe (3 months max) Rectify within agreed timeframe (3 months max) Examples: Examples: –Check list not completed as required by SMS –Scheduled drill not carried out as per SMS –Chart corrections not done (charts not in use)

Observation Statement of fact made during a safety management audit and substantiated by objective evidence. Statement of fact made during a safety management audit and substantiated by objective evidence. Examples: Examples: –Standing orders need improvement –Checklist needs updating for added equip’t –Critical equipment not prioritised on PM list –Safety notices need renewing