Practical Exchange of ATOVS Direct Broadcast Data in Asia Pacific Region Akihiko Nakazono Office of International Communications, Forecast Department,

Slides:



Advertisements
Similar presentations
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
Advertisements

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, December Lecture 9 Operational GTS management.
Status of Implementation at RTH Tokyo By Hiroyuki Ichijo Contents Contents 1. GTS facilities 2. GTS circuits 3. Use of the Internet 4. Collection of SHIP.
RTH AND NMC FUNCTIONS FOR GTS INFORMATION EXCHANGE T.K.RAY RTH,NEW DELHI,INDIA E Training Seminar on information and communication.
November 2006 TECO-WIS, Seoul 1 Definition of the Internet Network of networks –millions of smaller domestic, academic, business, and government networks.
Telecommunication status in RA VI RA VI Workshop on the implementation of WIS Sofia, Bulgaria, 1-3 November 2011 Matteo Dell’Acqua - Météo France Chair.
1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,
Current Status of Implementation of MTN at RTH Beijing Li Xiang National Meteorological Information Center, CMA.
1 World Meteorological Organization ICG-WIS Brasilia July 2008 Key Points from the 2 nd meetings of the RARS and IGGDS Implementation Groups WORLD.
INTERNATIONAL SATELLITE COMMUNICATIONS SYSTEM (ISCS) SUCESSOR TCP/IP SYSTEM Background - Status – Backup RA IV/WG-PIW-04/Doc. 5.2(1) ISCS Status (13.X.2004)
INTERNATIONAL SATELLITE COMMUNICATIONS SUCCESSOR SYSTEM (ISCS)
WMO Space Programme, CBS Technical Conference1 Integrated Global Data Dissemination Service (IGDDS)
WIS VPN Pilot Project in Regions II and V Submitted by Hiroyuki ICHIJO (Japan) ICG-WIS-4 (Reading, 4-7 September 2007)
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
WMO, version 1, 10 July 2013 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group.
Status of RA II Pilot Project to Develop Support for NMHSs in Satellite Data, Products and Training Keiko YAMAMOTO (JMA) On behalf of Co-coordinators of.
PROGRESS REPORT ON THE RA II PILOT PROJECT TO DEVELOP SUPPORT FOR NMHSS IN SATELLITE DATA, PRODUCTS AND TRAINING THIRD PHASE (SEP 2011 – AUG 2012) AND.
Overview of the Improved MTN project Geoff Molloy Communications and Computing Branch Bureau of Meteorology Australia.
CMA’s new GTS system Submitted by YANG Genlu, China
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
1 1 Japan Meteorological AgencyET-WISC-3, EUMETSAT Germany, Jun.2008 JMA’s Status Report related to WIS Toshikazu NISHIO JMA ET-WISC-III Jun.
Japan Meteorological Agency, November, 2012 Coordination Group for Meteorological Satellites - CGMS Status Report on the Current and Future Satellite Systems.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
Status of the Global Telecommunication System connected with RTH Tokyo Japan Meteorological Agency Presented by Masahiro Kazumori Eighth Meeting on Asia-Pacific.
WMO Space Programme Expert Team on WIS & GTS, Tokyo, April Integrated Global Data Dissemination Service (IGDDS)
The Satellite Meteorology Centre  The Satellite Meteorology Centre (Centre de Météorologie “Spatiale” : CMS) is established at Lannion in the Côtes d'Armor.
Features of the new TCP/IP link between HK and Beijing (Guangzhou) Features of the new TCP/IP link between HK and Beijing (Guangzhou) Justin Waiman MA.
Status on RTH Tokyo (Item 2.1) By Hiroyuki Ichijo By Hiroyuki Ichijo Expert Meeting on the Exchange of Early Warning and Related Information Including.
WMO Space Programme Dr Donald E. Hinsman Director WMO Space Programme World Meteorological Organization.
STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China
Status of the Global Telecommunication System connected with RTH Tokyo Sixth Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-6)
APSDEU-6, 1-3 June 2005 Seoul, Korea 1 ASIA-PACIFIC RARS (Regional Advanced Redistribution System) IMPLEMENTATION PLAN Notes for APSDEU-6 by David Griersmith.
Collaboration for Beijing and Tokyo GISC prototypes -- Status of WIS center development and planning -- Submitted by Hiroyuki ICHIJO (Japan) and SHI Peiliang.
RECENT ENHANCEMENTS TO THE CDDIS IGS Network Systems Workshop November 2-5, 1998 Annapolis, MD Carey E. Noll Manager, CDDIS NASA GSFC Greenbelt, MD.
APSDEU Sept 2006, Honolulu Hawaii 1 ASIA-PACIFIC RARS DEVELOPMENTS (Regional ATOVS Retransmission System) David Griersmith 7th Meeting of APSDEU,
Sep 20-22, 2006 APSDEU-7, Honolulu/Hawaii 1 Status of AP-RARS implementation at Tokyo Japan Meteorological Agency Prepared by A. Nakazono, T. Saito, H.
ASIA-PACIFIC RARS DEVELOPMENTS (Regional ATOVS Retransmission System) Gary Weymouth 8th Meeting of APSDEU, Montreal, Canada, 8-10 October 2007.
North-America-Europe Data Exchange, 3-5 May WMO Space Programme and IGDDS Jérôme Lafeuille WMO Space Programme World Meteorological Organization.
Jae-Myun Meteorological Satellite Division Korea Meteorological Administration Current Status of Data Exchange and Application.
1 Development of GTS and Data Exchange in China National Meteorological Information Center, CMA.
Alice Wong, Senior Advisor U.S. Department of State Bureau of Oceans and International Environmental and Scientific Affairs Office of Space and Advanced.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
Australian Bureau of Meteorology Satellite Data Use and Exchange Country Report for Australia Gary Weymouth.
WMO Space Programme Activities, RARS and IGDDS David Griersmith Observer for WMO at APSDEU-7 Honolulu, Hawaii September 2006.
Lecture Note No. 1 TRAINING SEMINAR ON INFORMATION AND COMMUNICATION TECHNOLOGY ON THE GTS T.K.RAY RTH NEW DELHI, INDIA E mail :
1 00/XXXX © Crown copyright North America-Europe Data Exchange Meeting Dorval, Canada May 2004.
REVIEW OF OUTCOMES FROM THE 2 nd WIGOS Workshop on Quality Monitoring and Incident Management ICG-WIGOS-5 WMO; OBS/WIGOS.
Status of RTH Tokyo Japan Meteorological Agency Presented by Tatsuya Noyori Expert Team on WIS-GTS Communication Techniques and Structure (TOULOUSE, France,
Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of.
CGMSSEC/EUMETSAT, v1, 8 May 2014 Coordination Group for Meteorological Satellites - CGMS Sean Burns – EUMETSAT Head of Real-Time Services and System Operations.
Status of Implementation TCP/IP at RTH Beijing NMIC, CMA.
Progress Report for 2015 – 2016 on the RA II WIGOS Project to Develop Support for NMHSs in Satellite Data, Products and Training Co-coordinator Japan Meteorological.
Status of JMA’s activities on Virtual Laboratory Fifth Virtual Laboratory Management Group (VLMG-5) WMO-CGMS Virtual Laboratory for Education and Training.
Coordination Group for Meteorological Satellites - CGMS Report of Working Group IV Global Data Dissemination.
Status of the GTS connection to RTH Tokyo Eleventh Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-11) (Boulder, USA, 02 to 06.
GSICS GDWG Report, Toulouse, 9 February GSICS Data Working Group Status Report V. Gaertner CMA, EUMETSAT, JMA, KMA, NOAA/NESDIS, WMO.
Progress Report on the RA II WIGOS Project to Develop Support for NMHSs in Satellite Data, Products and Training Co-coordinator, JMA and KMA Presented.
Agency, version?, Date 2014? [update filed in the slide master] Coordination Group for Meteorological Satellites - CGMS Update on Regional Retransmission.
Report of EG-AeM Position Member Country Co-Coordinators
Status report of GISC Beijing
Zhou Qing Liang(Shi Lijuan) CMA 31 Oct
Requirement for Full Global Operation on WIS Survey on the WIS Doc
Working Group I: Global Issues on Satellite Systems and Telecommunication Coordination  CGMS 43 WG-I.
DCPC Development in the Hong Kong Observatory
Automation of NMCs for GTS operation
GSICS Collaboration Servers a Vehicle for International Collaboration Status 2011 Peter Miu EUMETSAT.
Global Network Architecture
SNPP Regional Retransmission Service: Plans and Status of Implementation Presented to CGMS-43 Working Group 1 session, agenda item 6.
Status of Implementation at RTH Tokyo
CXML data exchange Beth Ebert
Presentation transcript:

Practical Exchange of ATOVS Direct Broadcast Data in Asia Pacific Region Akihiko Nakazono Office of International Communications, Forecast Department, JMA APSDEU-6, 1-3 June 2005, Seoul, Republic of Korea © NOAA/NESDIS

PART 1 Status of ATOVS-DB Data Related Activities in JMA

ATOVS-DB Data at Syowa Station Topic-1 ATOVS-DB Data at Syowa Station Syowa Station, belongs to the National Institute of Polar Research (NIPR), was established in 1957 at 69.00S and 39.58E Antarctica. Showa Station has been receiving NOAA HRPT data for research and operation. The HRPT data are relayed to the NIPR in Tokyo near real-time through 1Mbps satellite communication circuits since 2004.

ATOVS-DB Data at Syowa Station ATOVS-DB Data at Syowa Station (cont.) JMA started to negotiate with the NIPR on acquisition and utilization of the data, including dissemination to WMO Members. The NIPR seems to allow dissemination to WMO members under the their data policy, i.e., inclusion of the originator name in the data. The Meteorological Satellite Centre is experimentally getting the data from the NIPR, and studying for applying the AAPP package effectively.

Sample ATOVS Data Received at Syowa Station

Replacement Plan of HRPT Equipment at the Meteorological Satellite Centre (MSC), Kiyose Topic-2 Replacement Plan of HRPT Equipment at the Meteorological Satellite Centre (MSC), Kiyose

Reception of NOAA DB Data at MSC (current system) JMA has been receiving the NOAA satellite data since 1968 at the MSC, Kiyose Currently, JMA receives HRPT data from NOAA-16 and 17 around 10 orbits a day (c)Nojima

New Reception System The MSC is procuring a new POS receiving system which replaces current one. Capability of direct reception of the forthcoming AHRPT from METOP as well as HRPT from NOAA satellites In addition to the L-band, antenna has a capability of receiving X-band for the reception of HRD from NPP/NPOESS New system start to work in March 2006

Diagram of new reception system INTF DRIVER CIRCUIT DRIVER CIRCUIT LAN 3mΦ Parabolic antenna Time Server Time Server NOAA Rx NOAA Rx METOP Rx METOP Rx INTF Signal Processing & Control Unit Optical Cable SAPS HRPT, AHRPT Antenna TowerOperation Room SAPS:Satellite Data Advanced Processing System LNA D/C

Future plan of polar orbit satellite data reception METOP-2 METOP-1 NOAA-N’ NOAA-18 NOAA-17 NOAA : PM Satellite : AM Satellite As of May 2005

Status of AAPP Installation JMA has already utilized the AAPP ver.4.4 operationally for ATOVS DB data at MSC/JMA and for global ATOVS data at NPD/JMA. The AAPP processing time for DB HRPT data is less than two minutes per orbit.

PART 2 Practical Exchange of ATOVS-DB Data in Asia Pacific

CONTENTS BackgroundBackground Analysis & Estimation for exchangeAnalysis & Estimation for exchange ProposalProposal

Background The importance of ATOVS DB data for NWPs has been confirmed and therefore the exchange of ATOVS DB data have been discussed in the APSDEU since its fourth meeting in March APSDEU-4: Recommendation 8 –The meeting noted the importance of real time data exchange of locally received ATOVS data. –KMA and CMA agreed to explore the possibility of real time ATOVS data exchange. – BoM will investigate the possibility of distributing locally received ATOVS data.

Background Background (cont.) Action Item ( Beijing,2004) –The meeting noted the importance of real time data exchange of locally received ATOVS L1B or L1C data processed by AAPP. –KMA, CMA and JMA agreed to investigate the possibility of real time ATOVS data exchange. –The Australian Bureau of Meteorology also agreed to investigate the possibility of distributing real time ATOVS data. –These countries agreed to explore the EUMETSAT EARS approach as one possible strategy to achieve implementation.

Background Background (cont.) EARS has been established for collecting and disseminating ATOVS data in Europe and North America since 2001 CGMS has been discussing the exchange of ATOVS DB Data within the framework of WMO Space Program WMO, hosted by EUMETSAT, held the 1-st RARS Workshop in Dec 2004

In the 1-st RARS Workshop, Three Areas are Focused and Discussed for RARS in the Asia Pacific Region –Data Collection Potential HRPT Stations - at least, 19 stations are identified Communication means - FTP over GTS, Internet …. –Data Distribution Communication means - FTP over GTS, Internet,... –Standardization The data should only be processed to AAPP L1A at the various HRPT station sites Further processing to AAPP L1C at the distribution centres to ensure better calibration on the data

Potential HRPT Stations in the Asia Pacific Existing National Stations: in Australia, China - including Hong Kong, Japan, Korea, and New Zealand Singapore, Guam, Tahiti, Fiji, (La Reunion) Antarctic Stations: –McMurdo, Dumont d’Urville, Casey, Syowa Coverage by the 19 stations above

CONTENTS BackgroundBackground Analysis & Estimation for exchangeAnalysis & Estimation for exchange ConclusionConclusion

HRPT Stations in BoM, CMA, HKO, KMA, and JMA BoM –Darwin, Melbourne, Perth, Casey (Antarctica) CMA –Beijing, Guangzhou, Urumuqi, Lasha HKO –Hong Kong KMA –Seoul JMA –Kiyose, Syowa (Antarctica) There are 12 candidates

Coverage by 12 HRPT Stations

Coverage by the 12 HRPT Stations (Northern Hemisphere) EARS (DEC 2003)

Coverage by the 12 HRPT Stations (Southern Hemisphere)

Duration and Completion of reception A coverage of the station (depends on conditions) Orbit N Orbit N+1Orbit N+2 Completion Duration A Receiving Station

Estimated Duration and Completion Time at HRPT Receiving Stations (NOAA-16, 1 st -3 rd May) Origin of each circle indicates completion time. Diameter of each circle is relative to the duration of reception (max. 15-minutes)

Estimated Completion Time of HRPT Receiving Stations (superposition in May)

Estimated Duration and Completion Time at HRPT Receiving Stations (1 st May) 1234 Congestion Times

Estimated Duration and Completion Time at HRPT Receiving Stations (congestion time1)

Estimated Duration and Completion Time at HRPT Receiving Stations (congestion time2)

Estimated Duration and Completion Time at HRPT Receiving Stations (congestion time3)

Estimated Duration and Completion Time at HRPT Receiving Stations (congestion time4)

Characteristics of ATOVS DB reception in view of exchange Rush hour of ATOVS data are foreseen around six to eight times a day in the East Asia In a rush hour, most of HRPT stations in CMA, HKO, KMA and JMA complete reception in a short period (within 10 minutes ) In view of traffic, the degree of rushing depends on orbit position, data processing time at stations and centers, and national and international communications…should be examined

Amount of ATOVS Data Unit to be Transferred AAPP Level 1A/1B –Maximum Size = 1.2MB / Pass / Satellite in gzip compressed file AAPP Level 1C – Typical Size = 1.1MB / Pass / Satellite in BUFR form Roughly, 1.2MB is a index of data transfer A 1.2MB file is transferable within 5 minutes through a 32Kbps circuit with 100% efficiency

BoM Melbourne HKO Hong Kong HKO Hong Kong KMA Seoul KMA Seoul JMA Tokyo JMA Tokyo F/R MSS Tokyo NOAA ATOVS 256Kbps1.5Mbps 64Kbps 192Kbps 64Kbps 128Kbps CMA Beijing CMA Beijing CIR=16CIR=32 CIR=48 CIR=16 UNIX Workstation 4 processors CIR=16 FTP File exchange GTS Socket Message, FAX exchange F/R : Frame RelayCIR : Committed Information Rate ( RMDCN ) GTS links for exchange of ATOVS data GTS links for exchange of ATOVS data FTP can be used for ATOVS data exchange over GTS among these centres

MSS Tokyo FTP File exchange GTS Socket Message, FAX exchange F/R : Frame RelayCIR : Committed Information Rate Use of GTS links for exchange of ATOVS data Use of GTS links for exchange of ATOVS data FTP can be used for ATOVS data exchange over GTS among these centers In the Rush Hour BoM Melbourne HKO Hong Kong HKO Hong Kong KMA Seoul KMA Seoul JMA Tokyo JMA Tokyo F/R NOAA ATOVS 256Kbps1.5Mbps 64Kbps 192Kbps 64Kbps 128Kbps CMA Beijing CMA Beijing CIR=16CIR=32 CIR=48 CIR=16 UNIX Workstation 4 processors CIR=16 ( RMDCN ) 64Kbps 96Kbps Rough Estimation To complete file transfer around 5 minutes

These five centers are connected by TCP/IP links in GTS directly or via Tokyo FTP can be used for ATOVS data exchange over GTS among these centers FTP server at Tokyo is accessible through GTS and has capability to collect and distribute ATOVS data files Most of GTS links among these centers seem to have, or will have, enough spare capacity for ATOVS data, but some circuits have to be considered to widen the bandwidth to avoid delay in congestion hours Use of GTS links for the exchange of ATOVS data among BoM, CMA, HKO, KMA and JMA

Standardization/Coordination ( for data handling and utilizing ) Type of data to be exchanged –AAPP Level L1A/L1B/L1C –AAPP Version? Names and Codes – Name (Code) of the HRPT Stations and Processing Centres required in the AAPP and applied to output data, should be coordinated globally Format of data –AAPP Specific file, or –BUFR form(L3C) (TBD) Descriptors and codes to be used (Is it enough with , , for L1C?) Any additional descriptors and/or codes to be defined? –Common encoder is expected for BUFR encoding To Exchange ATOVS Data, some rules are required and shall to be coordinated

Standardization/Coordination ( for data transfer ) Data compression –gzip, bzip2 ? File naming convention for transfer –For WMO code: WMO PUB 386, AII-15 –For other type: TBD (WMO has not defined yet) FTP procedure –WMO PUB 386, AII-15 –Get/Put? (needs bilateral agreement between centres) Anything else ?

CONTENTS BackgroundBackground Analysis & Estimation for exchangeAnalysis & Estimation for exchange ConclusionConclusion

The Time Has Come JMA already has capability of receiving HRPT, pre-processing by AAPP, and exchanging ATOVS data through the GTS, and is willing to perform our part of the retransmission functions through the GTS in cooperation with other Centers concerned JMA propose: – to start to exchange ATOVS AAPP data – among BoM, CMA, HKO, KMA, and JMA – through the GTS – by the end of 2005

The Time Has Come (Cont.) APSDEU is expected to start discussion and coordination on the exchange of ATOV DB data Then, examine the exchange and make reviews to the next step => The next meeting is expected to be held in early 2006

Thank you for your attention!! 감사합니다