Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

HPK L1 teststructures HPK L1 half moon teststructure corresponding to main chips 6,7 Results on  Diode C-V  Coupling capacitors  polysilicon arrays.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Quality Assurance of Silicon Strip Detectors and Monitoring of Manufacturing Process Thomas Bergauer Institute f. High Energy Physics HEPHY, Vienna SiLC.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
1 Generic Silicon Detector R&D Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Database entry of irradiation data PROBLEMS New form of DB data One set of data may de-qualify whole batch of sensors  composite of composite action:
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
ESE Lab Computer based Temperature Control Sid Deliwala, ESE Labs.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
Database entry of irradiation data PROBLEMS New form of DB data 1. One set of data may de-qualify whole batch of sensors  composite of composite action:
Wind Turbine Simulation (Phase IV) SDMAY Advisor: Dr. Venkataramana Ajjarapu.
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
Measuring Leakage Current on Singles and Ladders P. Riedler and S. Ceresa, August 2005 Sensor Chip Manipulator Needle for sensor back side contact Probe-card.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
Electronic Devices Laboratory CE/EE 3110 Introduction to LabView.
Christina Hägemann,UNM Sensor Testing at University of New Mexico C. Hägemann, M. Hoeferkamp, D. Fields, A. Zimmerman, M. Malik VTX Meeting 03 June 2005.
WP3 10 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Re-structuring of QMUL Physics & Astronomy June/July 2013: Evacuated Physics building.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
1 Plans of Vienna SLHC Proposal Workshop 20. February 2008.
4 May 2010 Thomas Bergauer (HEPHY Vienna) Testing of Test Structures in Vienna CMS Sensor-TUPO.
CMS Sensormeeting : Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) Mechanical Assembly ready Instruments: LCR, Electrometer, PS, Quasistatic.
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
SOME COMMENTS Ulrich Heintz Brown University 7/23/2015Ulrich Heintz - HF plan 1.
Update of CMS Process Quality Control Sensor Meeting, CMS TK Week, , CERN Florence Anna Macchiolo Carlo Civinini Mirko Brianzi Strasbourg Jean-Charles.
1 Device Simulations & Hardware Developments for CBM STS Sudeep Chatterji CBM Group GSI Helmholtz Centre for Heavy Ion Research CBM Collaboration Meeting,
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
1 J.M. Heuser − STS Development Microstrip detector GSI-CIS Johann M. Heuser, GSI Li Long, CIS CBM Collaboration Meeting, GSI, Update on.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
IFR Praha 2004, 16 th April 2004Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics, AS CR, Prague Silicon sensors status.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
WP3 24 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Since 10 July th Re-installed blind on cabinet (JagM) 18 th Serviced Nitrogen.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
EUDET FP7 brainstorm EUDET-JRA2 Jan Timmermans. My personal opinion…. I would be in favour of waiting till next call Because “grand” particle physics.
Procurement Readiness Review : Detector Fabrication, Qualification & Assembly at India M D Ghodgaonkar Electronics Division, BARC, India.
Studies on n and p-type MCz and FZ structures of the SMART Collaboration irradiated at fluences from 1.0 E+14 to 5.6E+15 p cm -2 RD50 Trento Workshop ITC-IRST.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
INFN and University of Florence Test Beam Meeting Tracker Week
Karlsruhe probe equipment and QA proposals/expertise
Status of PQC Florence, Strasbourg, Vienna
SCADA for Remote Industrial Plant
INFN and University of Florence Test Beam Meeting Tracker Week
Injectors BLM system: PS Ring installation at EYETS
Anna Macchiolo, PQC Firenze
News from CMS Process Quality Control
US Testing Update Anthony Affolder (On behalf of the US testing group)
Series 5300 Lithium Cell Formation System
IEKP - Universität Karlsruhe (TH)
Presentation transcript:

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna Mirko Brianzi Anna Macchiolo Jean-Charles Fontaine Jean-Marie Helleboid Christophe Hoffmann Thomas Bergauer Margit Oberegger

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 System Configuration Probe-card to contact the 9 test-structures Switching matrix in K7002 main-frame PC or MAC to control the system through Labview software Measuring Instruments

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Probe-card  After finalisation of HPK and ST mask designs we have agreed upon the positions of the probe-card 52 contacts  The same probe-card is compatible for the test- structures of both the suppliers for all the sensor-types  Contacts on the baby detector designed to align the probe-card with the probe-station chuck and the standard moon Cap-ts Sheet GCD Cap-AC Baby Cap-DC Diode Mos

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 From the probe-card to the switching matrix Flat cable from the probe-card Connection box between flat-cable and cables to the switching matrix 4 K7154 modules of the switching matrix: 10 inputs each

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Measuring Instruments HV source : up to 1000 V (IV_baby) V source:  20 V All the instrument drivers are ready and included in the common software LCR meter + decoupling box

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 New measurement configuration  Change of the previous measurement configuration in order to:  Make it compatible for the different instrumentation present in the three laboratories  Improve the accuracy of some measurements  Reduce the needed electronic equipment  At the moment each lab is testing the new configuration. After this phase it will be implemented in the common software

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Switching matrix Slot 2 k7154 Switch System K7002 Slot 5 K7153 Slot 1 K7154 Slot3 k7154 Slot 4 k7154 K7153: 5 input channels from the measuring instruments New configuration: Using a common Low for the HV and V sources we could remove a K7153 module from the Switching System, now available as spare Common Low (HV+V source) High HV source High V source 4 outputs to the K 7154 modules In Florence we are now replacing our old multiplexers K7158 (30 V limit on input voltage) with K7154 (1100 V limit)  the switching system is going to be exactly the same in the 3 labs

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Common Software Selection of the lab Strasbourg is now implementing the last changes in the common software Visualisation of the full set of results of the 9 measurements on a standard moon

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Gate Controlled Diode V gate (V) New configuration: Common LOW for HV source and V source Florence: we had to swap HV and V source because of worse resolution of the A-meter of HV generator V back = 10V Surface generated current (A) inversiondepletion accumulation CSEM M200 Standard moon

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Gate Controlled Diode (Strasbourg) OLD= HV source and V source HIGH were referred to the same potential NEW= HV source and V source LOW are referred to a common GRND

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 CV MOS HPK M200 standard moon, similar behaviour for STM M200 Changed the connection between High and Low of HV source and LCR meter through the switching matrix (same for CV on diode) V fb (F) V gate (V) LCR meter + decoupling box HV source LCR Low to 0V since all the instrument GNDs are connected together To back To MOS metal

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Tests of the new configuration (Strasbourg)

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 CV on CSEM MOS Vgate (V) f = 100 Hzf =100 Khz

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 R interstrip Polarisation bias to the back To the central strip To the first neighbouring strips Need high sensitivity of A-meter on HV source Measured on CAP-DC: 9 strips without bias resistor Voltage applied across the central strip and the neighbouring ones

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 IV dielectric

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Still to do... Implement the new configuration in the final software and then test it. Install the probe-card and complete the connection with the switching system. Test the fully automatic procedure with the probe-card. Interface to the DB : a first draft of the output file and of the VI files to generate it was prepared in Vienna. The connection to the main acquisition software has to be implemented in Strasbourg.

Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Logistic Florence: IB1, IB2, OB1, OB2 (no-longtime IV) from QTC Perugia and Pisa 5% of the wafers = 693 standard moons Strasbourg: W3, W5A, W5b, W6a, W6b from QTC Karlsruhe 271 standard moons Vienna: W1, W2, W4, W7A, W7b from QTC Vienna 235 standard moons