19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL News –Market survey is close to the final state PS requirements for whole box Bricks specification.

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

Haptic Glove Hardware Graduation Project Prepared by Yaman A. Salman Eman M. Masarweh 2012.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
HARPER CHALICE GROUP LIMITED “PROTECTOR” PulseSecure ™ Fully monitored double pole High and Low voltage Perimeter security system”
Introduction The input network of the power amplifier will be designed in the example. The network synthesized will be expanded to allow for biasing of.
Overview The preparatory work for designing a single-stage power amplifier with a Mitsubishi MGF0909A will be done in this example. The main steps in this.
The transmission line circuit block used in Cadence Major Blocks and Peak Detector Sections of Channel Equalization Techniques for Ethernet Communication.
BTeV RICH HV System. The RICH HV System Power One 24V – 1.2A TNG Matsusada HVPS HPD.
SE 207: Modeling and Simulation Lab # 2:Basic Operations of the Analog Computers.
High Speed, high common mode immunity communication interface Team May12-05 Chendong Yang Mengfei Xu Advisor: Nathan Neihart Client: RBC Medical Development.
Low AC and DC Resistance Inductor Technology Weyman Lundquist – President and CEO West Coast Magnetics April 4, 2007 International Patent # WO 2005/09630.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
An amplifier with a transistor that conducts during the entire 360º of the input signal cycle. Optimum class A operation is obtained by designing an amplifier.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
1 Editing A Power Architect Tree What if a user specifies a specific tree configuration?
Electromagnetic Compatibility of a Low Voltage Power Supply for the ATLAS Tile Calorimeter Front-End Electronics G. BLANCHOT CERN, CH-1211 Geneva.
Jan B.Allongue1 WIENER “MARATON” POWER SUPPLY TESTS Introduction. Magnetic field tests. Plans for radiation and electrical tests. Conclusion.
Ivan Pogrebnyak Supervisors: Paramonov, Drake, Proudfoot ATLAS, MSU, Argonne Tile week upgrade session June 10, 2015 TileCal requirements for ELMB upgrade.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
12/2/2001Ivan Hruska & Georges Blanchot1 LV power supply for TILECAL Requirements –7 outputs for one drawer (+5V, -5V,+15V,- 15V,+3.3V) –total power is.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Sub- Nyquist Sampling System Hardware Implementation System Architecture Group – Shai & Yaron Data Transfer, System Integration and Debug Environment Part.
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
Microwave Amplifier Design Blog by Ben (Uram) Han and Nemuel Magno Group 14 ENEL 434 – Electronics 2 Assignment
Overview Trackaparcel booking system is very easy to use which sends up to minute information directly to the logistic company whilst building the manifest.
DESIGN OF THE NEPTUNE NODE CONVERTER Vatché Vorpérian Jet Propulsion Laboratory.
System Development Life Cycle. The Cycle When creating software, hardware, or any kind of product you will go through several stages, we define these.
7/2/2003Ivan Hruska,Francisca Calheiros1 Radiation test of components for LV power supply design  Test done in PSI verification and selection.
First results from PADI-2 Mircea Ciobanu CBM Collaboration Meeting March 10 –13, 2009 GSI-Darmstadt FEE1.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Radiation Dose for Targets T.Takahashi Hiroshima University.
DEVELOPMENT OF LABORATORY MODULE FOR SMALL WIND TURBINE CONTROL SYSTEM (Phase V) Advisor/Client: Dr. Venkataramana Ajjarapu Group MembersPosition on Team.
Class D Output Power Estimation Audio Group Applications 1.
Common mistakes Please don’t take offense if examples are taken from your report.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
ELECTRICAL ENGINEERING Principles and Applications THIRD EDITION ALLAN R. HAMBLEY ©2002 Prentice-Hall, Inc. Chapter 9 Computer-Based Instrumentation Systems.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Submarine Sonar Detection
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 Radiation test of PL500 in TCC2 Conclusion from last test in Louvain –All DCDC converters ran.
Power Supply System Discussion Topics Steve Virostek / John Joseph LBNL Spectrometer Solenoid Workshop May 10, 2011.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
Noise propagation issues in complex power cables for HEP detectors M. Iglesias, I. Echeverria,F. Arteche 12 th Meeting of the Spanish Network for future.
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
بحث مشترك منشور فى مؤتمر دولى متخصص (منشور ، التحكيم علي البحث الكامل) B. M. Hasaneen and Adel A. Elbaset البحث التاسع 12 th International Middle East.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
Fan Assembly Driven by Magnetic Fields
ARDUINO BASED UNDERGROUND CABLE FAULT DETECTION
Macom RF switches radiation-test results
Rectifiers, Filters and Regulator
Subject Name: LINEAR INTEGRATED CIRCUITS Subject Code: 10EC46
LVPS HEC Overview and Development
Calorimeter Mu2e Development electronics Front-end Review
Injectors BLM system: PS Ring installation at EYETS
ALICE Muon Tracking Upgrade EDR Answers
Y. Irie, KEK for the LOI collaboration
Open Compute +48V Busbar Discussion
Wireless Laptop Charger
Project Sublimity Audio Stereo Class-D Audio Amplifier
Dr. Unnikrishnan P.C. Professor, EEE
Impedance of the 2x50 to 100 ohm transformers.
Presentation transcript:

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL News –Market survey is close to the final state PS requirements for whole box Bricks specification also added –Radiation conditions changed - new simulations –New design started

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL Detailed finger simulations for TID [Gy/10y] ELMB position

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL Radiation situation in the fingers changed –new simulations shows easiest way to build the supply –ELMB level for TID is >33Gy ( survived ~80Gy) ability to use it finally inside LV box precise detail simulations done - confirming results LV box shouldn’t be too dependent on ELMB

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL Samples of LT brick obtained –basic measurements done –50W load –ripple without load = 15mVpp –with full load ( 50W) = ~ 100mVpp ( no output filter ! )

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL New power supply system project in preparation –Specification –Total efficiency computing ( cable requirements included ) –Open questions specified –Cost estimations not yet ready

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL Power overview - conditions : Uin = 65V, wire cross section 2mm^2, cable length 250m

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL total input power of system will be ~200kW with total efficiency 42% or better 1% of efficiency is ~1.5kW of total power 1V of Uin is ~ W of total power Double the voltage means sharing one cable by 2 LV boxes - cable savings

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL New design –new schematics prepared –initial radiation tests in preparation - TCC2 May ‘02 isolated amplifier for feedback & measurements original brick new designed brick

19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL Conclusion –ELMB is possible to use inside finger –project propagates slower but continues –first radiation tests in preparation