National adaptations to main survey instruments and layout verification National Research Coordinators Meeting Windsor, June 2008.

Slides:



Advertisements
Similar presentations
Special Education Leadership Meeting November 30, 2010 An Update on Special Education Compliance Monitoring Jennifer L. Kline, Esq. Education Associate.
Advertisements

Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
1 Public Service Commission On-line Test Order Form.
Translation and Translation Verification National Research Coordinators Meeting Amsterdam, October 2006.
Data Management Seminar, 8-11th July 2008, Hamburg Survey System – Overview & Changes from the Field Trial.
Translation and Verification of ICCS instruments Summary of the Field Trial & Plans for the Main Study National Research Coordinators Meeting Windsor,
Data Management Seminar, 9-12th July 2007, Hamburg 1 Data Processing at the IEA DPC.
STAAR Alternate 2 Preparing for the STAAR Alternate 2 Assessment 2015.
3rd NRC Meeting, 9-12 June 2008, Windsor 1 ICCS 2009 Main Survey Sampling Consultations.
The Application for Renewal Accreditation: Electronic Submissions.
Overview of field trial analysis procedures National Research Coordinators Meeting Windsor, June 2008.
Proposed Cognitive Test for the Main Study National Research Coordinators Meeting Windsor, June 2008.
1 Student Registration Import Must be imported into PBA by 2/18.
Auditor Responsibilities January 16, 2014 State Training Webinar 2014 CSP Contract Compliance Audit 1 AD14002.
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S - Translation of Forms and Labels (PDF)
National Adaptation Forms International Study Centre Data Management Seminar Hamburg, July 2008.
1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations.
1st NRC Meeting, October 2006, Amsterdam 1 Sampling: Next Steps.
Data Management Seminar, 8-11th July 2008, Hamburg ICCS 2009 Main Survey Field Operations.
Data Management Seminar, 8-11th July 2008, Hamburg 1 Summary Common Sources of Error.
ICCS status report Wolfram Schulz International Study Centre Data Management Seminar Hamburg, July 2007.
Verification: Quality Assurance in Assessment Verification is the main quality assurance process associated with assessment systems and practice - whether.
Overview of ICCS field trial National Research Coordinators Meeting Windsor, June 2008.
OCNLR arrangements for final external moderation and the AVA awards board Summer 2010.
Quality Control Program in ICCS Plans for the Main Study National Research Coordinators Meeting Windsor, June 2008.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
3rd NRC Meeting, 9-12 June 2008, Windsor 1 Data Management Procedures Michael Jung, IEA Data Processing and Research Center.
D5240 Document Retention System 8/20/ District 5240 The Rotary Foundation Grants Document Retention System Rotary Year
Quality Assurance Program National Research Coordinators Meeting Amsterdam, October 2006.
Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
Using PTOManager.co m to create a Student Directory May 4, 2009 L.P.S. VIPS Meeting.
Data Management Seminar, 9-12th July 2007, Hamburg Data Entry Overview.
Data Management Seminar, 9-12th July 2007, Hamburg 11 ICCS 2009 – Field Trial Survey Operations Overview.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
1st NRC Meeting, October 2006, Amsterdam 1 Data Management Procedures Preview of software used in ICCS Michael Jung, IEA Data Processing Center.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
ICCS Main Survey Overview National Research Coordinators Meeting Madrid, February 2010.
3rd NRC Meeting, 9-12 June 2008, Windsor 1 ICCS 2009 Main Survey Field Trial Results.
Data Management Seminar, 9-12th July 2007, Hamburg Entering Data Part 2.
Data Management Seminar, 9-12th July 2007, Hamburg WinDEM – Entering Data Part 1.
Proposed student questionnaire for the main survey National Research Coordinators Meeting Windsor, June 2008.
Data Management Seminar, 9-12th July 2007, Hamburg 1 ICCS 2009 – Field Trial Data Management Seminar Summary Day 3.
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 – On-line Data Collection in the Main Survey.
Data Management Seminar, 9-12th July 2007, Hamburg WinW3S - Introduction.
Study Overview National Research Coordinators Meeting Amsterdam, October
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S - Introduction.
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S – Listing Students and Assigning Booklets.
Data Management Seminar, 9-12th July 2007, Hamburg Within-School Sampling – A General Introduction.
Student Background Questionnaire National Research Coordinators Meeting Amsterdam, October 2006.
ICCS Marker Training Hamburg July 2008 Final note on marking Reliability marking report from WinDEM will include record of scores for double-marked items,
QILT May Webinar1. Just before we get started… Who are we? How questions will be handled Resources available after the webinar QILT May Webinar 2.
Teacher Survey Design National Research Coordinators Meeting Amsterdam, October 2006.
Data Management Seminar, 9-12th July 2007, Hamburg 1 ICCS 2009 Data Files and Variables.
Documentation Prepared by: Leanna Bowman Programmer: Linda Norman October 10, 2012.
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 Data Files and Variables.
Teacher Questionnaire National Research Coordinators Meeting Windsor, June 2008.
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
GMAP Grant Management, Application, and Planning Consolidate Application Training.
2016 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
How to complete and submit a Final Report through
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Campus ESSA Grant Packet Training
Virtual Network Meeting: Consolidated Application
GMP Inspection Process
LAMAS Working Group June 2017
Idaho New Charter Schools Determination Levels 2011
In-Service Teacher Training
IEP REPORT OF PROGRESS AND ACHIEVEMENT K-12
Maplewood Year End Check List.
Presentation transcript:

National adaptations to main survey instruments and layout verification National Research Coordinators Meeting Windsor, June 2008

NRC Meeting Windsor June 2008 Contents of presentation Principles of instrument adaptation Outline of adaptation review undertaken by the ISC National Adaptation Form (example) Problems identified in field trial Procedures for layout verification

NRC Meeting Windsor June 2008 Adapting main survey instruments All instruments have to be adapted –including those for English-speaking countries Adaptations should be kept to a minimum Adaptations have to be documented in National Adaptation Forms (NAF) There needs to be a consultation with the International Study Centre (ISC)

NRC Meeting Windsor June 2008 Types of adaptations There are parts of instruments that have to be adapted –Provision in translation notes and NAF –Usually in carets ( ) There may be the need for adapting other items –This should only be done when absolutely necessary! In some cases, NRCs may want to add items or categories –Should be discussed and agreed with ISC

NRC Meeting Windsor June 2008 Purpose of National adaptation forms Necessary information for translation verification Reference for layout verification Facilitates data processing –Documenting any deviation from international format Informs later data analysis

NRC Meeting Windsor June 2008 Process of adapting instruments Completing NAF in cooperation with translator and reviewer (> Version I) Consultation about NAF with ISC (> Version II) Documenting any changes from translation verification (> Version III) Documenting any changes from layout verification (> Version IV)

NRC Meeting Windsor June 2008 National adaptation forms (NAF) EXCEL format One general information spreadsheet Five (or six) adaptation forms –Cognitive test –Student background questionnaire –Student perceptions questionnaire –Teacher questionnaire –School questionnaire –Regional instrument (if applicable)

NRC Meeting Windsor June 2008 Columns in NAF - 1 Columns 1 to 3 should not be modified: –1: International question numbers –2: International question/category wording –3: International variable or code Column 4 to 5 may have to be completed –Only when adding items or categories!

NRC Meeting Windsor June 2008 Columns in NAF - 2 Columns 6 to 7 have to be completed when marked in yellow: –6: National wording of adaptation –7: English translation of this adaptation Column 8 is reserved for any comments NRC would like to make –Useful for consultation when implementing adaptations that are additional Column 9 is reserved for comments by the ISC during the consultation

NRC Meeting Windsor June 2008 Adding items or categories Not acceptable for cognitive test Requires discussion and agreement with ISC Only acceptable in exceptional circumstances MUST be documented in NAF! For countries that participated in CIVED no changes in adaptation/translation are permitted!

NRC Meeting Windsor June 2008 NAF example

NRC Meeting Windsor June 2008 International and national options International options will be included in NAF –NRCs should indicate whether they want to include the optional question(s) National options should be documented in the NAF –Please list questions (with English translation) that should be added –A special spreadsheet will be included for this purpose –National questionnaire parts should not be excessively long (otherwise follow-up sessions would be required)

NRC Meeting Windsor June 2008 Assistance with NAF More detailed information at Data Management Seminar in Hamburg NRCs should contact the ISC in case of any problems with the completion of NAF

NRC Meeting Windsor June 2008 Experience from the field trial - 1 Generally, procedures for adaptation review worked very well Adds important element to quality assurance procedures Provides important information for –Translation verification –Data processing –Data analysis

NRC Meeting Windsor June 2008 Experience from the field trial - 2 Some improvements that were identified during this process –Adaptation notes needs to be complemented based on experiences during adaptation review –There should be a space for recording adaptations to general directions –There should be a space for recording national items Some incomplete NAF were submitted which required re-submission –Reminder to national centres to document ALL adaptations

NRC Meeting Windsor June 2008 Layout verification Final step for instrument preparation before going into the field The layout verification is carried out at the International Study Centre (ACER) The layout verification is done AFTER translation verification –Assembly of test booklets once translation verification results have been received ALL countries are required to go through layout verification BEFORE printing their instruments

NRC Meeting Windsor June 2008 How to prepare for layout verification Finalise instruments based on advice from translation verification Assembling and layouting material according to sample instruments –available in PDF and WORD Prepare instruments in WORD and converting them into PDF

NRC Meeting Windsor June 2008 What to submit? Countries should submit PDF files of: –Six test booklets –Student questionnaire –Teacher questionnaire –School questionnaire Version III of the NAF –including any updates after translation verification

NRC Meeting Windsor June 2008 What we will do Compare the layout of national instruments with the sample instruments Generally, no further checks of translations or adaptations –if spotted we will advise NRCs Results of layout verification sent back to national centres (EXCEL spreadsheet)

NRC Meeting Windsor June 2008 After layout verification National centres should implement corrections as advised Sometimes the ISC may ask for re- submission in case of severe layout problems Final instruments should be submitted with data files to IEA DPC together with final NAF (version IV)

NRC Meeting Windsor June 2008 Experience from the field trial Generally, procedures worked well There were a few cases where instruments had to be re-submitted Due to the narrow timelines some instruments had not been submitted for layout verification –National centres should ensure that their national instruments go through ALL steps in the verification process (adaptation review, translation verification and layout verification)

NRC Meeting Windsor June 2008 Questions or comments?