Defining Procedures for Decision Analysis May 02-14 & Engr 466-02A April 30, 2002 Client & Faculty Advisors –Dr. Keith Adams –Dr. John Lamont –Dr. Ralph.

Slides:



Advertisements
Similar presentations
Chapter 1 Business Driven Technology
Advertisements

Companies can suffer numerous problems due to poor management of resources and careless decisions. In real-world decision- making, many organizations lack.
Degree and Graduation Seminar Scope Management
Project Management Session 7
Time and Cost Estimation
Managing Project Risk.
Building Knowledge-Driven DSS and Mining Data
Research Methods in MIS Dr. Deepak Khazanchi. Objectives for the Course Identify Problem Areas Conduct Interview Do Library Research Develop Theoretical.
EE496A Senior Design Project I Dr. Jane Dong Electrical and Computer Engineering.
Wireless Stereo Audio Communicator for Television Use Dec /10/2002 Team Members: Advisors/Clients: Matthew Hamilton Dr. John Lamont Eric Hagen Prof.
4/28/2004Optical Tape Measure Optical Tape Measure May Team Members: Faculty Advisors: Nick Freese (EE) Dr. Aleksander Dogandzic Bruce Fu (EE) Dr.
WCBI Team Information Team number: Client: Faculty Advisors: Technical Advisors: Team Members: May02-11 Square D Company (Greg Wiese) Glenn Hillesland.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Internal Auditing and Outsourcing
Figure 1 Personal Efforts Estimated Resources Financial Budget and Other Resources Table 1 Project Requirements Design Objective Concise, non-intimidating,
4/24/2007Iowa State University Program to Evaluate Alternative Energy Sources EE / CprE 492 May Team Members Christina Erickson Daniel Harkness Matt.
Multiple-output, Variable-output DC Power Supply May03-22 Team Members: Erik Johnson Joel Jorgensen Peter Holm Philip Schulz Clients – Prof. Patterson,
What is Business Analysis Planning & Monitoring?
SYSTEM ANALYSIS AND DESIGN
S/W Project Management
Job Offer/Continuing Education Evaluation Labor CostsHoursRate($10.30/Hr) Luke195 $ 2, Stephanie175 $ 1, Matt185 $ 1, Randy205 $ 2,
Smart Digital Valve Control Simulator May April 25, 2001 Client: Client: Fisher Controls Intl. Inc. Contacts: Contacts: Patrick Ryan and Jeff Seyller.
Business Analysis and Essential Competencies
Chapter 13: Developing and Implementing Effective Accounting Information Systems
ACCOUNTING INFORMATION SYSTEMS
Feasibility Study.
Radio-Controlled Duck Decoy May April 30 th, 2003 Team Members: Faculty Advisors: Jason Freerksen Prof. Robert Weber Kooi-Tjek Lau Prof. Clive Woods.
Alternative Lower Cost Hearing Aid Dec03-10 Client: Herb Harmison Advisor: Edwin Jones Jr. Team Members: Hassan Qureshi Hamdan Al-Mehrezi Trong Do Nathan.
Abstract Evidence can be the key to convicting someone of a crime, or acquitting a person of charges brought against them. To make sure the evidence is.
Multiple Robot Network Team May Clients: Brian Johnson, Shayne Schiltz, and Amy Wilmeth April 26, 2001.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Educational Laboratory Virtual Instrumentation Suite (ELVIS) May Client: National Instruments Advisors: Dr. Mani Mina, Dr. Diane Rover Group Members:
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Senior Design Laboratory Design Dec 05-01
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Attack Tool Repository and Player for ISEAGE May06-11 Abstract Today’s world is changing shape as it increases its dependency on computer technology. As.
Expert System Job Offer Evaluation Software May Abstract The project’s focus is to decide what criteria should be used to determine which job offer.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
Abstract Evidence can be the key to convicting someone of a crime, or acquitting a person of charges brought against them. To make sure evidence is carefully.
Systems Development Life Cycle
Cybot and OSCAR Elementary School Tutorial Dec02-03 December 10, 2002 Client: Electrical and Computer Engineering Department Advisors: Dr. Lamont, Dr.
Copyright 2009 John Wiley & Sons, Inc. Chapter 12 Project Auditing.
Optical Encoder for a Game Steering Wheel May05-26 Client: Thomas Enterprises Advisors: Dr. James Davis Dr. Douglas Jacobson Team Members: Sam Dahlke,
Introduction to Project Management Chapter 9 Managing Project Risk
Abstract Reiman Gardens is looking to provide more educational material on their website. They are seeking a web program that provides an enjoyable experience.
Alternative Energy Evaluation May06-16 Team Members: Steve ChebuharEE Anhtuan DinhEE Ryan FerneauCprE Justin JorgensenEE Client : Professor Ralph Patterson.
M.E.L.V.I.N. Electronic Voting System for a Legislative Body May /07/02.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
PC Based Spectrum Analyzer April 29, 2003 May03-10 Faculty Advisor: Dr. DJ Chen Michael Cain Paul Heil Eric Rasmussen Aung Thuya Client: Teradyne Inc.
In today’s world of ever-increasing energy prices and environmental concerns, alternative energy sources are constantly being researched. This project.
Clients/Faculty Advisors Dr. Eric Bartlett May01-14 Team Members David Herrick Brian Kerhin Chris Kirk Ayush Sharma Incremental Learning With Neural Networks.
Improved Driver Education May Client:Iowa Department of Transportation Advisors:John Lamont Ralph Patterson III Max Porter Duane Smith April 25 th,
SOFTWARE PROJECT MANAGEMENT
LIGHTNING PROTECTION OF TRANSMISSION AND DISTRIBUTION LINES Team Members Eric Nelson, EE – Project LeaderDavid Dieterich, EE Tim Conrad, EE – Com. CoordinatorSam.
© 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Economic Dispatch of Combined-Cycle Units
Personnel Effort Budget
Campus Locator – Definition Phase (May04-04)
Ongo-08b: K – 12 Teaching Application Support
End-Product Description
CLINICAL INFORMATION SYSTEM
Automated Printed Circuit Board Development
Globey's World Abstract Design Requirements Introduction
Project Management Process Groups
Unit 5 – eProject – Starting to look at projects Unit 5
Proposed Approach and Considerations
Joint Application Development (JAD)
Presentation transcript:

Defining Procedures for Decision Analysis May & Engr A April 30, 2002 Client & Faculty Advisors –Dr. Keith Adams –Dr. John Lamont –Dr. Ralph Patterson III Team Members –Marvin Choo –Dave Cohen –Amy Kalbacken –Natasha Khan –Jesse Smith –Theodore Scott

Acknowledgments Faculty Advisors Faculty Advisors Dr. Doug Gemmil Dr. Doug Gemmil Dr. Kenneth Kirkland Dr. Kenneth Kirkland Dr. Jo Min Dr. Jo Min Dr. Ron Nelson Dr. Ron Nelson Dr. Steve Russell Dr. Steve Russell Dr. Howard Van Aucken Dr. Howard Van Aucken Dr. Max Wortman Dr. Max Wortman

Presentation Outline Problem Statement Problem Statement Design Objectives Design Objectives End-Product Description End-Product Description Assumptions & Limitations Assumptions & Limitations Project Risks & Concerns Project Risks & Concerns Technical Approach Technical Approach Evaluation of Project Success Evaluation of Project Success

Presentation Outline Recommendations for Future Work Recommendations for Future Work Personnel Budgets Personnel Budgets Financial Budgets Financial Budgets Lessons Learned Lessons Learned Closing Summary Closing Summary

Problem Statement Problem Problem – –Companies often are required to make major decisions regarding the commercialization process for a product, process, or service – –How can we maximize efforts most efficiently during the decision-making process? Goal Goal – –Develop a guide that aids users in the decision- making process

Design Objectives Design Constraints Design Constraints –Inaccurate research (especially Internet) –Uncovering all factors –Limited understanding of algorithms

Design Objectives Intended Users & Uses Intended Users & Uses –People in decision-making positions Gain greater understanding of methods Gain greater understanding of methods –Software Programmers Have background reference information Have background reference information Detailed starting point for developing software Detailed starting point for developing software

End Product Description The report will aid individuals in conducting a thorough analysis of the decision factors surrounding their particular product, process, or service The report will aid individuals in conducting a thorough analysis of the decision factors surrounding their particular product, process, or service

End Product Description Written Report Written Report –Key factors regarding decision processes –Algorithms used in decision analysis –Examples of Algorithms –Functional Software Specification –Reference Material

Assumptions Considering company goals Considering company goals Aids in decision-making but will not be the only tool used Aids in decision-making but will not be the only tool used Take into account other decision-making factors and considerations Take into account other decision-making factors and considerations Using decision-making algorithms Using decision-making algorithms

Assumptions Use algorithms based on research Use algorithms based on research Have basic knowledge of decision-making process Have basic knowledge of decision-making process For any business interested in decision analysis software For any business interested in decision analysis software No sophisticated mathematics or statistics are used in algorithms No sophisticated mathematics or statistics are used in algorithms

Limitations Ranking the importance of each factor differently Ranking the importance of each factor differently Not all data accounted for Not all data accounted for Selected algorithms may not be applicable to all decisions Selected algorithms may not be applicable to all decisions Need to apply each process to specific situation Need to apply each process to specific situation

Limitations Limited knowledge of algorithms Limited knowledge of algorithms Algorithms may require a statistical background or other expertise Algorithms may require a statistical background or other expertise All factors & constraints may not be uncovered All factors & constraints may not be uncovered Algorithm applicability is based on project requirements & criteria Algorithm applicability is based on project requirements & criteria

Project Risks & Concerns Scheduling interviews Scheduling interviews Finding information Finding information Losing a team member Losing a team member Understanding project Understanding project

Technical Approach Purpose To determine an algorithm for use in creating software that will implement the decision analysis process To determine an algorithm for use in creating software that will implement the decision analysis processProcess Determine the basic project process Determine the basic project process Compile a list of potential algorithms Compile a list of potential algorithms Create a set of criteria for evaluating the algorithms Create a set of criteria for evaluating the algorithms Research the algorithms Research the algorithms Select the most applicable algorithms Select the most applicable algorithms

Technical Approach “Basic Project Process”

Technical Approach “List of Algorithms” Artificial Neural Networks Artificial Neural Networks Bayesian Logic Bayesian Logic Decision Matrix Decision Matrix Decision Tree Decision Tree Fuzzy Logic Fuzzy Logic Genetic Algorithms Genetic Algorithms Linear Algebra Linear Algebra

Technical Approach “Criteria for Evaluating the Algorithms” What type of problems is the algorithm good for? What type of problems is the algorithm good for? What input data is needed? What input data is needed? What kind of control is needed? What kind of control is needed? How does the algorithm work? How does the algorithm work? What are the expected outputs? What are the expected outputs? How easy or difficult is it to implement? How easy or difficult is it to implement? Is there any information on the solution time, problem size, etc. Is there any information on the solution time, problem size, etc. Are there any examples available for the algorithm? Are there any examples available for the algorithm? Are there sufficient conditions for convulgence? Are there sufficient conditions for convulgence? If the algorithm is discovered to be ineffective what are the reasons in support of the determination. If the algorithm is discovered to be ineffective what are the reasons in support of the determination.

Technical Approach “Selecting the Best Algorithms” Artificial neural networks Able to learn, memorize, and create relationship between data Able to learn, memorize, and create relationship between data Able to work with the non-linearities Able to work with the non-linearities Used for the accurate prediction of events Used for the accurate prediction of events Decision trees Useful for handling a lot of complex information Useful for handling a lot of complex information Genetic algorithms Multi objective solutions can be defined Multi objective solutions can be defined

Project Success Initial Startup –Identifying key factors –Interview coordination Interview Results & Project Definition –Conduction Interviews –Completing Project Plan

Project Success Implementation –Algorithms –Functional Software Specification Testing –Scenario Example –Needs further testing

Project Success End Product –Guide Algorithms Report Algorithms Report Functional Software Specification Functional Software Specification Reference Material Reference Material –Final Report Software Package

Recommendations for Further Work Create detailed models of selected algorithms Create detailed models of selected algorithms Consult with professionals to evaluate algorithms Consult with professionals to evaluate algorithms Develop a functional software package Develop a functional software package

Personnel Budget PlannedRevisedActual Dave Cohen Amy Kalbacken Theodore Scott Marvin Choo Natasha Khan Jesse Smith

Budgeted Hours Vs. Actual Hours

Financial Budget Item Original Estimate Cost Revised Estimate Cost Actual Cost to Date Printing $60.00 $60.00$45.00$42.00 Transportation $0.00 $0.00 Labor Equipment & Parts $0.00 $0.00 Telephone Total Estimated Cost $0.00 $0.00

Lessons Learned Essential team attributes Essential team attributes –Teamwork –Time Management –Brainstorming Knowledge acquired Knowledge acquired –Division of labor, team goals, task management –Interview information –Defining scope of project

Lessons Learned Algorithms Algorithms –Complexity –Need to study more carefully Issues faced in decision-making process Issues faced in decision-making process –Time vs. Money –Who is involved in decision-making process –Engineering vs. Business Processes

Closing Summary Conclusion A tool created to aid during the decision-making process would be well worth developing A tool created to aid during the decision-making process would be well worth developingBenefits Identifies key factors in the decision process Identifies key factors in the decision process Characterizes the decision-making process Characterizes the decision-making process Determines the best decision processes Determines the best decision processes Aid in further analyzing a particular decision Aid in further analyzing a particular decision Narrows in on the optimum decision Narrows in on the optimum decision

Questions