S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE 2008 - W2 Large cosmics runs have been taken last week : THE POSITIVE.

Slides:



Advertisements
Similar presentations
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)Overview of the system. 2)Discriminating errors. 3)Tricks. RUNNING PRS AND SPD – FIRST DRAFT TUTORIAL.
Advertisements

SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
MTCC –II & HCAL noise chasing Mandakini Patil India-CMS meeting Jan07 Shantiniketan.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
CALO News Pascal Perret LPC Clermont 26 November 2014.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
Muon commissioning status and plans G.P. C. De Plano.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Sept 03:  About ~80 patches are installed, all in the periphery of Outer section:  C-side: voltage control / distribution boxes 1, 2, 3, 4, 8, 9 (partially)
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
2009: restart the system: few observations. Hw maintenance week:
CMS-ECAL Front-End monitoring Matteo Marone
ScECAL+AHCAL+TCMT Combined Beam FNAL
Presentation transcript:

S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE STATEMENTS. Full detector read-out for PRS and SPD. All crocs are now OK. Still 3 FE Boards to be finely tuned for synchronization. Still 2 VFE half-boards flat. See Edu’s report for SPD VFE. Noise performance very satisfactory for most of the electronics (both systems) PRS and SPD are now time-aligned with XCAL. Superb event displays. Remapping in the DAQ works. Exercising the fine time-alignment can already start with the current data. Tell1 performed WELL. Underfull problem is behind us. NO problem spotted last week, apart the network weakness to follow when increasing frequency. This happens first to PRS because of event size but it’s a general observation. Yet we do know that some thing bad is happening at higher frequency …

S.MonteilPS/SPD COMMISSIONING2 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Somehow large (> 10k useful ) cosmics runs have been taken last week : THE PROBLEM. From Ricci

S.MonteilPS/SPD COMMISSIONING3 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Somehow large (> 10k useful ) cosmics runs have been taken last week : THE PROBLEM. 24 C-side 64-detectors (both sytems) are missing cosmics, while A-side answers are homogeneous. Provided that:  We are reading pedestals (in both systems) through the DAQ.  We are correcting PRS with the adequate alternance. One-to-one correspondence detector vs electronics channels.  No time-diplaced signal in +/- 2 BX.  We checked the settings of the latencies we put in the configuration to be the same for missing and working boards.  A-side seems fine.  LEDs were time-aligned in the same BX at the period we took their measurements.  We are recording time-aligned noisy events. Everything looks like there were no HV on the correponding tubes. We are hunting. Our bSomehowest candidate so far : HV configuration problem.

S.MonteilPS/SPD COMMISSIONING4 PS/SPD FE STATUS COMMISSIONING MEETING – JUNE W3 Actions : Run LEDs in both systems. Check what happened in the very first cosmics run. Measure HV on the platform. Measure HV on the detector. Last minute: We saw cosmics the 7th of March in one now guilty 64-detectors

S.MonteilPS/SPD COMMISSIONING5 PS/SPD FE STATUS COMMISSIONING MEETING – JUNE W3 Program for this week : Solve the missing board issue. Robustify the PVSS configuration. Clean the platform. Start the work on the trigger path.