Industry Fundamentals and Occupational Safety Unit 6

Slides:



Advertisements
Similar presentations
Man- Basket for cranes Design Specifications Safety Work Instructions
Advertisements

Erecting steel structures Setting up or dismantling cranes or hoists
F&T Inc. OVERHEAD CRANE SAFETY.
Rigging Hazard Awareness
Safely Using Drill Collar Clamps
Crane Rigging Slide Show Notes
Cranes and Slings Major Causes of Crane Accidents
Rigging Equipment Slings
Shipbreaking Module 4: Heavy Equipment & Material Movement
CFR Subpart H Rigging Equipment.
Presentation 3 - Crane Operations
General Rigging inspected prior to shift(s)
Rigging Equipment for Material Handling Your Safety is the #1 Priority
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
BLR’s Safety Training Presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Safe Rigging Practices
Materials Handling, Storage, Use, and Disposal. Overview -- Handling and Storing Materials Involves diverse operations: Manual material handling  Carrying.
OSHA Office of Training & Education
OSHA Office of Training & Education1 Cranes. 2 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures.
Copyright  Business & Legal Reports, Inc.
Materials Handling and
OSHAX.org - The Unofficial Guide To the OSHA
Round sling shall be removed from service if any of the following are visible:  Missing or illegible tag  Acid or caustic burns  Evidence of heat damage.
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Cranes and Slings 29 CFR and 184.
INTRODUCE SELF AND EXPLAIN GOING TO COVER BASIC
Crane and Hoist Training
Overhead Crane Safety.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
Alstom International EHS Passport EHS Training Program Lifting Accessories and Operations AIEP-TM-9016-en-Rev
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
2.5.4 Student Book © 2004 Propane Education & Research CouncilPage Loading and Securing ASME Tanks Using Truck-Mounted Company- Owned Cranes Coordination.
Sling Safety.
BASIC RIGGING.
CRANES, SLINGS, & YOU They can do a lot of work 34.
Annual Refresher Training Tools and Machine Guards.
Georgia Tech Safety and Health Consultation Program
Health & Safety Life Book AM ST p. 1 v.01 - Aug.18, 2011 Working at Height Portable Ladders Design Specifications The use of home made ladders.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Industry Fundamentals and Occupational Safety Unit 6
Cranes and Slings 29 CFR and 184
Rigging Equipment Safety is the #1 priority
ACADs (08-006) Covered Keywords Rigging, hoist, crane. Description Supporting Material b.
Standard 29 CFR Part Sling and Lifting Devices Training.
 Slingmax®, Inc..  Failure of any synthetic sling from cutting is preventable. Slings must be protected from cutting or damage. Synthetic Protection.
Sling Load Capacity and Sling Angles
Wednesday, July 18, Wednesday, July 18, 2012.
SAFETY IN MATERIALS HANDLING AND CONTINUAL IMPROVEMENT
Lifting Gear TDI-Brooks Policies & Procedures Nov 2015.
Cranes, Forklifts & Material Handling This month we are going to look at a basic understanding of the requirements for safely working with with cranes.
Materials Handling and Storage
Copyright © 2012 American Safety Management Inc. Crane and Hoist Safety.
Crane Fundamentals Lifting Safety BY - ALEX MATHEW HSE ENGINEER LAHOUD ENGINEERING CO.
Session 2: Hardware, Hoists, and Hitches
Session 1: Slings and Sling Inspection
Wire Rope Inspection Look for:
Indoor Cranes— The Case of the Broken Sling
Safe Rigging Practices
Crane safety and inspections
Overhead and mobile crane safety
Slings and Rigging Overview
MAIN 220 Industrial Rigging
Crane safety and inspections
F&T Inc. OVERHEAD CRANE SAFETY.
Crane safety and inspections
Crane safety and inspections
Cranes and Hoists Standard 29 CFR Part
Click to start.. Click to start. Rigging for a safe lift SAFETY TALKS! for PowerPoint © MMIV Bongarde Holdings Inc.
Presentation transcript:

Industry Fundamentals and Occupational Safety Unit 6 Rigging Safety Industry Fundamentals and Occupational Safety Unit 6

Basic Safety Follow the recommended procedure Know all the aspects of your job: Tools/Equipment Tasks that needs to be completed and how to complete tasks accurately Make sure those operating the rig are certified Know proper communication

Basic Safety Take care of the equipment; the better it runs the safer it will be to work with Properly store tools Look out for others Use the proper communication Inspect equipment before use

Synthetic Sling Inspection Slings must be inspected before each use, visually and physically, for any rejection criteria. Rejection Criteria includes but is not limited to: Missing identification tag Cut severing the outer layer exposing the loadbearing yarn A knot that cannot be removed A puncture Loss of flexibility for any reason Other criteria for rejection includes: heat damage, UV damage,chemical damage, overload damage which resulted from over stretching, or a snag in the sling reveling warming yarn.

Synthetic Sling Inspection

Alloy Steel Chain Inspection Alloy Steel chains must be inspected before use, physically and visually. Rejection Criteria includes but not limited to: Missing identification tag Heat damage Excessive wear Any damage or change in links: Stretching Broken loop Twisting Rust Chipping Bending

Wire Rope Sling Inspection: Wire rope slings must be physically and visually inspected before each use. If there is any damage the sling needs to be immediately removed from use. Rejection Criteria includes but is not limited to: Broken Wires Kinking Bird Caging Rust Heat Damage

Wire Rope Damage:

Shackle Inspection: Shackles must be inspected before each use; if any damage is found the shackle should not be used for the lift. Rejection Criteria includes but is not limited to: Cracks or damage to the body of the shackle Wrong pin for the shackle Broken, loose or bent pin Missing correct markings (capacity and size)

Shackle Damage:

Eyebolt Inspection: Eyebolts must be visually inspected before each use and inspected by a qualified rigging inspector at least once a year. Rejection criteria includes but is not limited to: Scraping or abrasion Stress cracks Rust Bent Any deformation

Lifting Clamp Inspection: Lifting clamps need to be inspected before each use to check for any damage that can affect the safety of the load. Rejection Criteria Includes but is not limited to: Cracks General wear and tear Loose screws Rust

Rigging Hook Inspection: Rigging hooks should be inspected, along with the rest of the sling, before each use for damage that makes the hook no longer safe to use. Rejection Criteria includes but is not limited to: 5% increase of hook length 10% degree change from the unbent plane of hook 15% increase in opening of hook Cuts or gouges Rust

Hoist Safety/Sling Stress Keep chains and ropes clean Always perform lifts with supervision Always use appropriate protective gear Sling Stress: As the angle of the sling decreases the stress on the sling increases *90 degrees (straight up and down) will have the least amount of stress

Risk Management Risk management is when the area that the lift is occurring is analyzed before the lift begins. Risk management planning can reduce the danger of the work site Tips: Check locations of any structure in the work area to make sure it won’t obstruct the lift while the rig is moving Check for pedestrian traffic; rope or tape off the area for safety Check the weather, especially for wind and fog

Load Safety Keep the swing path of both front and back of the rig clear. Do NOT manhandle the load into position. Never stand under load being hoisted. Never attempt to slow load that is spinning too much; let it slow naturally before attempting to place it on the ground. If you are signaling make sure the rigger can see you at all times; if you are the rigger do not move the load until you can see the signaler.