BLADE SEMINAR 7th February 2001 RISK - HARD & SOFT David Blockley.

Slides:



Advertisements
Similar presentations
Selecting a Methodology for BPR
Advertisements

Implementing a Behavior Based Safety Process at Rockwell Automation
A Systems Approach To Training
Cost Management ACCOUNTING AND CONTROL
Science Subject Leader Training
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
Modern Systems Analyst and as a Project Manager
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Project Appraisal Module 5 Session 6.
A Joint Code of Practice Objectives and Summary Presentation
Chapter 5 – Enterprise Analysis
Leadership and Strategic Planning
Effectively applying ISO9001:2000 clauses 6 and 7.
Value for Money – new requirements and challenges
Journey Management Nigel DAth Journey Manager Bay of Plenty RTIM Seminar 18 March 2014.
Risk The chance of something happening that will have an impact on objectives. A risk is often specified in terms of an event or circumstance and the consequences.
How to commence the IT Modernization Process?
Lecture 5: Requirements Engineering
Chapter 10: The Traditional Approach to Design
Systems Analysis and Design in a Changing World, Fifth Edition
PROJECT RISK MANAGEMENT
Competency Management Defining McGill’s Competency Directory MANAGEMENT FORUM JUNE 7, 2005.
2013 Northwest Hydro Operators Forum 1 Risk-Informed Decision Making – FERC Perspective David Lord, P.E., D2SI Dam Safety Risk team – Portland, Or Natural.
National overview: Workforce Planning Elinor Mitchell.
Marakas: Decision Support Systems, 2nd Edition © 2003, Prentice-Hall Chapter Chapter 4: Modeling Decision Processes Decision Support Systems in the.
The Australian/New Zealand Standard on Risk Management
IT Project Management Weeks 2 and 3. Topics of Discussion Introduction Identify the Business Case Scope the Project Plan the Project Delivery and Outcome.
Other Planning Processes: Final Planning Touches
Area of Study 3: The Operations Management Function
Introduction to Computer Technology
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
1 CREATING A LEARNING ORGANIZATION AND AN ETHICAL ORGANIZATION STRATEGIC MANAGEMENT BUAD 4980.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
Project Design Assumptions, Pre-conditions, Risks.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Logistics and supply chain strategy planning
Planning the project Project Management (lecture).
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
1 CE Management and Planning Diane Bishton – K229 Planning & Control Strategies.
Modernising Pharmacy Regulation An inspector calls: A new regulatory model in pharmacy Deborah Hylands Inspector, GPhC 19th February 2014.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
1 Business Planning Park View Business & Enterprise School.
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
QUALITY ASSURANCE MANAGEMENT CONTROLS Chapter 9. Quality Assurance (QA) Management is concerned with ensuring: 1) The information system produced by the.
PLC Workshop at ITER, 4-5 th of December 2014 A. Nordt, ESS, Lund/Sweden.
Version 10.0  The High Performance Organisation Ltd Creating A Process Based Management System 1 Welcome Creating a Process Based Management.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
Trust, Ownership and Motivation. Contents Trust, Ownership & Motivation How does it feet to be Trusted? What Trust Looks Like What must you do to be Trusted?
The Risk Management Process
1 Techniques for Effectively Managing Credit Relationships: Achieving the “Right” Rating Next Page To Advance: Click Screen Anywhere or Click Next To Return.
Statewide Radio Feasibility Study (SIRN) Presented by Tom Harris SIEC Chair Mike Ressler.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Planning in production systems Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Session 1.31 RISK BASED AUDITING AN OVERVIEW BY R T I JAIPUR.
Managing programs that promote personal effectiveness.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
The Context of Reliability Theory in Engineering Systems David Blockley University of Bristol Bristol UK by.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
Solihull Review of Urgent Care Programme Approach And Governance 2013
Asset Governance – Integrated Strategic Asset Management
Process Approach An introduction.
Construction Projects
Process Approach An introduction.
Portfolio, Programme and Project
Presentation transcript:

BLADE SEMINAR 7th February 2001 RISK - HARD & SOFT David Blockley

Contents Introduction Risk - hard Risk- soft Risk management Conclusions

Risk = Chance + Consequences + Context Risk is about 14 years old!

Hard system Soft system Meta system Risk in Context Why = How (Who, What, Where, When)

Contents Introduction Risk - hard (action & reaction) Risk- soft Risk management Conclusions

Structural Reliability Theory Safety factor Capacity / Demand = C/D Structural reliability theory Parameters X for C, D are random variables Z = C-D p f = prob ( Z < 0 )

1 0 X Z = C-D = g (X) 1 Area under curve is 1 pfpf Z < 0Z > 0 Capacity/Resistance C Demand/Load D Here D>C defines failure Z

X1X1 X2X2 Z < 0 Z > 0 Limit state function Z = 0 pfpf m X1,m X2 Contours on the joint pdf f (X 1, X 2 ) Z = g(X 1, X 2 )

In general Z = g (C, D) = g (X) g (X) is the limit state function p f = Prob (g (X) < 0) = …... f( X (x) dx g (X) < 0

time a limit boundary x l xtxt f (x) pfpf mxmx p f = f(x, t) d (x, t) a stochastic process x>x l

time performance measure no 2 performance measure no 1 Boundaries of acceptable values defining success Initial State Final target state Trajectory of process

time a performance measure past a limit boundary Scenarios of future Scenarios of future future Damage/Failure now Target state

o oo o oo o o o oo o Series System Parallel System p f = p f (1 or 2 or 3 or 4 or 5) p f = p f (1 and 2 and 3)

o Beam Event Tree o o o o o o o o o o o Beam Sway Combined Sway Combined b c d c d b d d b c d

Consequences Values - cost, safety, profit, sustainability etc BCIOD+R business, customer, integrating, operating, delivery, regulatory Limit states & Value functions Vulnerability & Robustness

Contents Introduction Risk - hard Risk- soft (action, reaction, intention) Risk management Conclusions

RISK SOFT Precautionary Principle Environmentalists Public understanding GM Crops, BSE, mobile phones Risk Perception control, ownership Evidence Measurement

Contents Introduction Risk - hard Risk- soft Risk management Conclusions

Past Present Future Soft & Hard Hazards Preconditions, trends patterns of concern Alternative Futures (Scenarios) Soft & Hard Identification of future hazards events with risk = chances + consequences + context Evidence Remove Change process Transfer Redesign etc Reduce (Strategic) What if questions share, redesign etc Remedy (Tactics) retain, redesign make acceptable contingency plans Managing systems to success based on evidence Time

Transformation Input Output Recipe First do this then do that etc Flowchart Network Gantt Chart Activity 1 Activity Activity Process mechanism inputoutput control IDEF0 diagram

Doing a Process Roles Functions Players WHO Client/ Customers WHY Purpose, Needs, Targets Place Site WHERE WHEN Time WHAT Form State Variables KPIs Transformations Physical system Models Inputs, Outputs HOW Vision, Success Resource, Control, QA Decision, Alternatives, Criteria Evidence Risks Stakeholders NEW PROCESS

CO R I D B Key B: Business R: Regulation C: Customer O: Operation I: Integration D: Delivery Managing Relations Considering Customers Using Integrating People & Processes Doing Good Business Delivering Assets Being a hand crafted chair for comfort Being a hand crafted chair for comfort

Being Hand crafted for comfort D O C B R I Considering customer Using Managing relations Doing good business Delivering Integrating Establishing plan Accounting Controlling processes Managing staff Making Designing Deciding needs Deciding Customer s Customer needs Maintaining Sitting in chair Deciding stakeholders Hand crafting Designing structure Recruiting Procuring preparing Training Paying Public Deciding what to do Deciding budgets Projecting Returns Establishing KPIs Designing form Deciding affordability Deciding Type Asking SamplingHandling Cleaning Being Comfortable Maintaining team Regulators Key B: Business R: Regulation C: Customer O: Operation I: Integration D: Delivery

Fuzziness Choosing appropriate level of detail for model Model dependable? Parameters dependable? Includes people? Using deterministic method Note context Randomness Using probability method Note context Using result as evidence Randomness Incompleteness Including model uncertainties Use Social Process Checking for unintended effects Looking for evidence with Italian Flag Manage systems to success based on incomplete evidence - using judgement Recognising social process No Yes START END Using Interval Probability Theory Social Processes e.g. Workshops, Focus Groups, Italian Flag measure of evidence, These methods inform judgement they cannot replace it

1-1 mapping Many - 1 mapping plum pudding relation RSets on the relation R (a) (b) (c)(d) A & B not A & B A & not B not A not Bnot A & not B not A& not B not A & not Bnot A & B A & not B

HighLow Interest Min. effort Keep satisfied Keep informed Key players Power/influence High Low A Not A B Not B A & B A & not B not A & B not A & not B (a) The sets of R (b) Stakeholder diagram (c) The change process

not B A B not A m 11 m 12 m 21 m 22 m 13 m 23 m 31 m 32 m 33 Unknown A Unknown B Lower Prob (A & B) = green Upper Prob( A & B) = 1 - red Unknown (A & B) = white Italian Flag for A & B (b) (c) (a) (d) (A & B)

Green area P(A) X A Not A Red Area P(not A) White area P(unknown A) Area under whole curve = 1 i.e P(A) + P(not A) + P (unknown A) = S n (A) S p not AA X P(not A) P(A) P(unknown A) (a) (b) (c)(d)

Four Emerging Types of Problem identifying cross functional processes in large organisation troubleshooting clear processes with much multi-tasking visioning consequences of uncertainty in cross disciplinary processes looking for unintended consequences in an existing risk management system

Process A Process BProcess C Note: The owner of Process C thinks his process is very likely to fail. The owner of process A thinks his process will be successful If Process C is necessary for Process A then the two of them need to sort out the reasons for their differing perceptions

Software Juniper - exists FlowMap - exists MindMap - exists FlagAccess - prototype FlagExcel - prototype JuniperProfessional? - coming

Conclusions Integrate hard & soft risk by Systems approach based on - holons, connectivity & process Evidence Measurement & Uncertainty Mathematics