ME Machine Shop Improvements: R14701 4. Gap Analysis Rochester Institute of Technology has set a long term goal of having one of the top Mechanical Engineering.

Slides:



Advertisements
Similar presentations
. . . a step-by-step guide to world-class internal auditing
Advertisements

Quality Management Training Quality circles Bench Mark Kaizen.
FireRMS Credentials. Credentials  Objectives Customize Credentials Credentials Earned Scheduling and Tracking for Credentials.
LIBRARY AND INFORMATION USE PATTERNS BY ENGINEERING FACULTY AND STUDENTS Lisha Li William Baer June 2009.
Advancing Excellence in America’s Nursing Homes A Review of 2 Clinical Tools: Pressure Ulcer and Restraints.
Welcome to Finger Lakes Conveyors Located on Route 414, in Waterloo, New York Introduction Shop Tour Shop Tour Welding Assembly Machining Engineering.
EQuIP Rubric and Quality Review Curriculum Council September 26, 2014.
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
Technical Communication Anupama Gummaraju - as a service in the IT consulting industry.
Adding and Subtracting
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
STEPPING STONE PROJECT STEPPING STONE PROJECT designing a new engineering discipline presented by team 1.
Frank L. H. WolfsDepartment of Physics and Astronomy, University of Rochester The Personal Response System (PRS) at the University of Rochester. Frank.
Annual Graduate Faculty Meeting Karen Bell, Presiding Officer of the Graduate Faculty Laurel M. Garrick Duhaney, Associate Provost & Dean of the Graduate.
College of Natural and Applied Sciences Master of Science in Environmental Science Master of Science in Environmental Science Degree 21 Faculty: From CNAS,
Control of manufacturing systems Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Dangers of Implementation of Year 7 into the Secondary School The SevenUP Journey Mrs C Mills, Director of Teaching and Learning and Mrs Monique White,
21 st Century Maricopa Review of Process Human Resources Projects Steering Team Meeting May 12, 2010.
Redesign of Beginning and Intermediate Algebra using ALEKS Lessons Learned Cheryl J. McAllister Laurie W. Overmann Southeast Missouri State University.
UGA’S STRATEGIC PLANNING DASHBOARD Allan Aycock Director for Assessment and Accreditation Shweta Doshi Business Intelligence Application Analyst 1.
TaskStream Training Presented by the Committee on Learning Assessment 2015.
LibQUAL+ and Beyond: Using Results Effectively 23 rd June 2008 Dr Darien Rossiter.
Product/Service Name: Team Leader: Faculty / Research Alliance: Mobile Tel:
VIA Visitor Internet Access at the Baylor University Libraries.
Everything You Ever Wanted to Know but Were Afraid to Hear! The Ohio Public Health Association The World of Vital Statistics: Data Collection and Application.
WVU Libraries LibQual Surveys 2003, 2005, 2007 “ The WVU library system is outstanding. I honestly cannot think of anything that needs improvement within.
Charting Library Service Quality Sheri Downer Auburn University Libraries.
Date Coordinator Name(s) Other Leadership Name(s) ABC Coalition Clean Cities Re-designation.
LibQual 2013 Concordia University Montréal, Québec.
Training Needs Assessment Plan Hillsborough Community College Dale Mabry Tutoring Center.
Self-Study and Curriculum Review of the ILT ID & Adult Learning Program at University of Colorado at Denver IT 6720 – Research in IT July 27, 2005 Michelle.
Community Health Assessment: Primary Data Collection LHD TA Project – Learning Collaborative 1 Community Health Assessment Second Learning Session Sheena.
Dolina Dowling December 2010 Presentations 2, 3 1
Planning for Surge. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster and Risk.
College of Natural and Applied Sciences Master of Science in Biology Master of Science in Biology Degree 8 Faculty: From CNAS, WERI & Marine Lab 8 Faculty:
Eloise Forster, Ed.D. Foundation for Educational Administration (FEA)
R14701: ME Machine Shop Opportunities.  Goal ◦ Top rated ME program and ME machine shop in the nation and eventually the world.  Objectives ◦ Identify.
Lubbock Independent School District Technology Plan By Stacey Price.
CGNA Marketing Services 2007 …for a changing landscape.
Re-Visioning the Future of University Libraries and Archives through LIBQUAL+ Cynthia Akers Associate Professor and Assessment Coordinator ESU Libraries.
VT’s University Libraries Assessing Technology-based Projects for Faculty Evaluations Some Survey Results and comparisons with ARL Academic Libraries.
MAP the Way to Success in Math: A Hybridization of Tutoring and SI Support Evin Deschamps Northern Arizona University Student Learning Centers.
Charting Library Service Quality Sheri Downer Auburn University Libraries.
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
Library Satisfaction Survey Results Spring 2008 LibQUAL Survey Analysis User Focus Team (Sharon, Mickey, Joyce, Joan C., Paula, Edith, Mark) Sidney Silverman.
NEW CAREER PATHWAYS USD 305 Salina Public Schools.
Pearson’s perspective on the development of qualifications below level 2 Terry Porter Business Manager 0.
Peer Reviewer - Basic Workshop 2 Prof Hala Salah Consultant in NQAAP Prof Hussein El-Maghraby Member, NQAAP.
Monmouth University LibQUAL Survey Results Lead to Improvements in Library Services October 31, 2007 Eleonora Dubicki
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Project Final Presentation Joe Featherall.
Student Employment Where Learning Happens. Today’s Agenda Overview of Learning Outcomes UWM Employment Experience – What our data says – Student Employment.
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
October 17, What is the primary purpose(s) and responsibility of our committee?
Database (Microsoft Access). Database A database is an organized collection of related data about a specific topic or purpose. Examples of databases include:
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Chapter 16 Staff training and certification. Outline The objectives of training and certification The training and certification process Determine professional.
PLCs Professional Learning Communities Staff PD. Professional Learning Committees The purpose of our PLCs includes but is not limited to: teacher collaborationNOT-
Turbomachinery Flow Visualization P08453
Program Quality Assurance Process Validation
Instructor Course Evaluation (ICE)
Courtney Mills Principal, Midlands Middle College
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
Institutional Program Review 2017 Update
P07107: Mission Control Procedures Aerospace Systems and Technology
Final Project Plan P09004 – Eye Movement Tracking Device
Quality management and Process improvement
Presentation transcript:

ME Machine Shop Improvements: R Gap Analysis Rochester Institute of Technology has set a long term goal of having one of the top Mechanical Engineering programs in the nation. The objective of this project is to identify the characteristics of top university Machine Shops and use that information to both optimize and evolve RIT’s Machine Shop into one of the top in the nation. Key characteristics that are addressed include the Machine Shop’s capabilities, layout, procedures and usage trends. This project focused on benchmarking and collecting input from the student perspective since the FARC committee focused on collecting input from faculty and staff. dfa Team Members: Lucas Sychtysz, Katie Baldwin, Brian Church Add to survey what time of day that students would like to use the shop (not including class times) In depth benchmarking of competitor schools Create a clear, labeled map of machine shop to help students locate machines and equipment Create a quick reference guide for each machine (instructions & uses) Supply a 3D printer that is more easily accessible to students, in addition to the Brinkman lab printers Uniquely label machines and equipment based on year acquired and machine type Improve computer sign in system and procedure Self- sufficient Occasionally need help Often need help Always need help EDT (130 Students) Pre-RIT0.8%16.2%35.4%47.7% Current5.4%66.7%27.1%0.8% Post-RIT94.8%5.2%0.0% MSD (34 Students) Pre-RIT0.0%20.6%26.5%52.9% Current8.8%70.6%17.6%2.9% Post-RIT43.3%53.3%0.0%3.3% In order to be considered a top school RIT should add 3D printing, water jets, and more CNC mill and lathe capabilities. In order to move from low access control to high control there needs to be various levels of access as well as a swipe system for student entry. Require students to have multiple levels of training for shop access and build a part test. This would show their levels of independence and knowledge of shop procedures. Open 70 hrs/week 3 staff members Rarely used computer sign in system No physical access restrictions Caters to numerous clubs Extended access hours to approved clubs Table 1: Currently the majority of surveyed students feel that they occasionally/often need help in the shop, but by the time they graduate would like to be self-sufficient. In order to achieve this, more classes should be offered, preferably optional classes for a grade or night/weekend classes that are not for a grade (based on Fig. 4). Fig 5: Since the machines are what the shop is most commonly used for, it is important that the shop provides as many machines as possible (Fig. 1) to meet the needs of the students. Welding is least common, therefore, it should be determined whether this is due to a lack of equipment capabilities or lack of need by the students. Fig 6: The most common time that students use the shop is during the afternoon. If additional student staffing were added to help in the shop, this would be the time of day that they would be of the most help. Re-distribute surveys in machine shop, EDT, and senior design classes Re-evaluate capabilities and performance of shop based on survey results. Meet with committee to relay the findings of the second round of surveys 3. Target State 1. Background 2. Initial State5. Proposals 6. Follow Up 1 Fig 1: With respect to the number of machines available RIT falls in the middle of other schools. Currently has 5 out of the 12 listed capabilities. Fig 2: RIT falls under the low control category, requiring only training or certification. Fig 3: Represents the highest level of certification that a user needs in order to get access to the Machine Shop. In order to enter the RIT Machine Shop, students only have to complete the Engineering Design Tools (EDT) class *Not mutually exclusive answers 6